Name of the Chief Mentor: Dr.N.Anbuchezhian Name of the Faculty Coordinator: Dr.K.HelenPrabha Name of the Faculty Co-Coordinator: Dr.C.Bennila Thangammal S/N Status (In Activity Start Date Progress/Complete d) Receipt of Offer Letter from AICTE IDEA Lab 1 01-12-2022 to Institute Send the Acceptance letter with Bank 2 07-12-2022 accountof Receipt details to AICTE the sanction letter from AICTE 3 08-02-2023 IDEA Lab Receipt of Funds from AICTE IDEA Lab if 4 NA applicable Start of Project implementation Equipment Procurement as per Annexure- 5 1 (Sheet IDEA Lab2built-up of this excel Spacefile)readiness and 6 01-12-2022 furnished Installation and Commissioning of 7 08-02-2023 Equipment 8 Training on the Equipment from vendors NA 9 Inaugural of the center A202000114 .D. Engineering College N.Anbuchezhian K.HelenPrabha C.Bennila Thangammal End Date Actual Date Remarks of Completion
NA Received Offer Letter
NA Sent the Acceptance Letter NA Received the Sanction order Self Finance scheme mplementation Given in sheet 2 of same excel file 31.05.2023 31.03.2023 Completed 30.06.2023 In Progress NA NA After Completing the installation Tentative date: June 2023 Status(Procured / Management Approval Obtaining Quotations Getting the Equipment Installation & Commisitioning Remarks S/N Planned / Ordered / Equipment Name PDC(Planne ADC(Actual PDC(Planne ADC(Actual PDC(Planned ADC(Actual PDC(Planne ual Date Not Planned) Start Date d date of Date of Start Date d date of Date of Start Date date of Date of Start Date d date of of Completion) Completion) Mandatory Completion) Equipments Completion) Completion) Completion) Completion) Complet 1 Planned Laser Cutter 08-02-2023 31-08-2023 02-05-2023 31-10-2023 2 Ordered Vinyl Cutter 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 NA NA NA 3 Planned 3D Printer 08-02-2023 30-06-2023 17-03-2023 30-06-2023 15-05-2023 30-05-2023 4 Planned 3D Scanner 08-02-2023 30-06-2023 17-03-2023 30-06-2023 15-05-2023 30-05-2023 5 Planned CNC Router 08-02-2023 31-08-2023 02-05-2023 31-10-2023 6 Planned Heavy Duty Laser printer 08-02-2023 31-08-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 18-04-2023 15-06-2023 7 Ordered Solder Station 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 18-04-2023 15-06-2023 8 Ordered Desoldering station 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 9 Procured Mixed Signal Oscilloscope 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 10 Procured Signal Generator 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 11 Procured Variable Power Supply 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 12 Planned Benchtop Multimeter 08-02-2023 31-08-2023 NA NA NA 13 Planned PCB Milling machine 08-02-2023 31-08-2023 NA NA NA Mandatory Consumables 14 Ordered Vaccum Cleaner 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 18-04-2023 15-06-2023 15 Procured Hot Air Gun 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 16 Procured Measuring Equipments 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 17 Procured Digital Multimeter 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 18 Procured Clothes Iron 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 19 Planned 3D printer filaments 08-02-2023 30-06-2023 NA NA NA 08-02-2023 30-06-2023 15-06-2023 20 Procured Drill bits 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 21 Procured Hack Saw Blades 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 Mandatory Tools 22 Procured Hack Saw 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 23 Ordered Cordless Drilling Machine 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 18-04-2023 15-06-2023 24 Ordered Files Set 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 25 Procured Digital Vernier Caliper 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 26 Procured Hot Air Blower with soldering Iron 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 27 Procured Screwdriver Set 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 28 Ordered Vaccum Cleaner 08-02-2023 30-06-2023 19-04-2023 NA NA NA 08-02-2023 30-06-2023 19-04-2023 19-04-2023 15-06-2023 29 Procured Hot Air Gun 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 30 Ordered Micrometer 08-02-2023 30-06-2023 18-04-2023 NA NA NA 08-02-2023 30-06-2023 18-04-2023 18-04-2023 15-06-2023 31 Procured DC Regulated power supply 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 32 Procured Oscilloscope 08-02-2023 30-06-2023 10-02-2023 NA NA NA 08-02-2023 30-06-2023 10-02-2023 10-02-2023 15-06-2023 Optional Equipment and Consumables 33 Procured Sensor Set 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 34 Procured Arduino UNO boards 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 35 Procured Node MCU 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 36 Ordered Raspberry Pi 08-02-2023 30-06-2023 19-04-2023 NA NA NA 08-02-2023 30-06-2023 19-04-2023 19-04-2023 15-06-2023 37 Procured ESP32 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 Other Equipment, You may add 38 Procured LED 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 39 Procured Push Buttons 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 40 Procured Relay 6v 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 41 Procured D.C.Motor 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 42 Procured Buzzer 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 43 Procured M-Seal,Fevi Quick 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 44 Procured LCD Display 16x2 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 45 Procured 7 Segment Display 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 46 Procured 9v Battery 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 47 Procured Knife 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 48 Procured 2 Way Tapes 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 49 Procured Extension Cords 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 50 Procured Adaptor 12v 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 51 Procured 10k Preset 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 52 Procured Speaker 8 Ohm 0.5W 65mm Stereo Audio 2 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 53 Procured PCB Drill Bits 0.5mm,0.8mm,1mm 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 54 Procured Capacitor kit 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 55 Procured Diode (1N4001) 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 56 Procured Transistor (BC547) 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 57 Procured Manual PCB Drilling Machine 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 58 Procured Drilling Machine 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 59 Procured Glue Gun 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 60 Procured BreadBoard 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 61 Procured Insulation Tape (Electronic Spices Electrica 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 62 Procured Soldering Kit (Serplex® Temperature Adjusta08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 63 Procured Desoldering machine 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 64 Procured Flux 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 65 Procured Lead 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 66 Procured 1 sqmm PVC Insulated Multi Strand Wire 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 67 Procured 1 sqmm PVC Insulated Single Strand Wire 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 68 Procured Tester 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 69 Procured RTC 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 70 Procured Plastic Container 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 71 Procured Baby Vice 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 72 Procured Servo Motor SG 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 73 Procured Bluetooth 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 74 Procured USB Cables 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 75 Procured Pliers 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 76 Procured Joystick Module 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 77 Procured Digital Push Button (Red) (blue) 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 78 Procured Digital Push Button (White) (black) 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 79 Procured Tower pro MG995 Servo motor 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 80 Procured jumper 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023 81 Procured USB micro cable 08-02-2023 30-06-2023 06-04-2023 NA NA NA 08-02-2023 30-06-2023 06-04-2023 06-04-2023 15-06-2023