Pimpri Chinchwad Polytechnic Civil Engineering Department

List of Practical and Progressive Assessment Sheet


Subject-Estimating Costing And Valuation Subject Code:- 22503

Sr. Title Of Practical Date Of Date of Assessment Sign of Remark


No. Performance Submission Marks teacher s(If any)

1 Prepare the checklist of the item to be executed with


units for detailed estimate of the given structure of 24/7/2023 25/7/2023
the given drawing.
2 Prepare a report on market rates of given material,
labour wages, hire charges of equipment, tools 28/7/2023 31/7/2023
required for to
construct.
3 Prepare detailed specification for the given item
using DSR 31/7/2023 01/8/2023

4 To prepare approximate estimate of various civil


engineering work. 01/8/2023 07/8/2023
5 To prepare approximate estimate of various civil
engineering work. 07/8/2023 08/8/2023
6 Prepare a bill of quantity of the given item from
actual measurement. 08/8/2023 14/8/2023
7 Prepare a bill of quantity of the given item from
actual measurement 14/8/2023 21/8/2023
8 Calculate the quantity of items of work from the
given set of drawing using standard measurement 21/8/2033 22/8/2023
sheet for load bearing structure from DSR (1BHK
building with staircase)
9 Calculate the quantity of items of work from the
given set of drawing using standard measurement 22/8/2023 28/8/2023
sheet for load bearing structure from DSR (1BHK
building with staircase)
10 Calculate the quantity of items of work from the
given set of drawing using standard measurement 28/8/2023 29/8/2023
sheet for load bearing structure from DSR (1BHK
building with staircase)
11 Prepare detailed estimate from a given set of
drawing using “standard measurement sheet &
abstract format” for RCC frame structure using 29/8/2023 04/9/2023
description of item from DSR, along with the face
sheet and prepare quarry chart, lead statement (G+1
building)-(footing, column)
12 Prepare detailed estimate from a given set of
drawing using “standard measurement sheet &
abstract format” for RCC frame structure using 04/9/2023 05/9/2023
description of item from DSR, along with the face
sheet and prepare quarry chart.-(Beam)
13 Prepare detailed estimate from a given set of
drawing using “standard measurement sheet &
abstract format” for RCC frame structure using 05/9/2023 11/0/2023
description of item from DSR, along with the face
sheet and prepare quarry chart, lead statement (G+1
building)-(slab)
14 Prepare detailed estimate from a given set of
drawing using “standard measurement sheet &
abstract format” for RCC frame structure using 11/9/2023 12/9/2023
description of item from DSR, along with the face
sheet and prepare quarry chart, lead statement (G+1
building)-(chajja and lintel)

15 Prepare detailed estimate from a given set


ofdrawing using “standard measurement sheet & 12/9/2023 18/9/2023
abstract format” for RCC frame structure using
description of item from DSR, along with the face
sheet and prepare quarry chart, lead statement (G+1
building)-( measurement sheet, abstract sheet,face
sheet and lead statment)

16 Calculate the reinforcement quantity from thre


given set of drawing for a room size of 3mx4m with 18/9/2023 25/9/2023
bar bending schedule(footing)
17 Calculate the reinforcement quantity from thre
given set of drawing for a room size of 3mx4m with 25/9/2023 26/9/2023
bar bending schedule( column)
18 Calculate the reinforcement quantity from thre
given set of drawing for a room size of 3mx4m with 26/9/2023 03/10/2023
bar bending schedule( beam, lintel)
19 Calculate the reinforcement quantity from thre
given set of drawing for a room size of 3mx4m with 03/10/2023 09/10/2023
bar bending schedule( chajja slab)
20 Prepare the rate analysis for the given five items of 09/10/2023 10/10/2023
work.
21 Prepare detailed estimate of community well from 10/10/2023 16/10/2023
given drawing
22 Prepare detailed estimate of small septic tank from
the given drawing 17 /10/2023 23/10/2023
23 Prepare Detailed estimate of W.B.M road of 1
kilometer length form the given drawing. 23/10/2023 30/10/2023
24 Use the relevant software to prepare detailed 30/10/2023 06/11/2023
Estimate of septic tank / community well
Total