This document contains a list of 24 practical and progressive assessment sheets for the subject of Estimating Costing And Valuation for the Civil Engineering Department at Pimpri Chinchwad Polytechnic. The list includes the title of each practical assignment, assessment dates, submission dates, assessment marks, and remarks from the teacher. The practical assignments include preparing checklists, estimates, bills of quantities, measurement sheets, reinforcement calculations, rate analyses, and detailed estimates for various civil engineering structures.
This document contains a list of 24 practical and progressive assessment sheets for the subject of Estimating Costing And Valuation for the Civil Engineering Department at Pimpri Chinchwad Polytechnic. The list includes the title of each practical assignment, assessment dates, submission dates, assessment marks, and remarks from the teacher. The practical assignments include preparing checklists, estimates, bills of quantities, measurement sheets, reinforcement calculations, rate analyses, and detailed estimates for various civil engineering structures.
This document contains a list of 24 practical and progressive assessment sheets for the subject of Estimating Costing And Valuation for the Civil Engineering Department at Pimpri Chinchwad Polytechnic. The list includes the title of each practical assignment, assessment dates, submission dates, assessment marks, and remarks from the teacher. The practical assignments include preparing checklists, estimates, bills of quantities, measurement sheets, reinforcement calculations, rate analyses, and detailed estimates for various civil engineering structures.
Pimpri Chinchwad Polytechnic Civil Engineering Department
List of Practical and Progressive Assessment Sheet
Subject-Estimating Costing And Valuation Subject Code:- 22503
Sr. Title Of Practical Date Of Date of Assessment Sign of Remark
No. Performance Submission Marks teacher s(If any)
1 Prepare the checklist of the item to be executed with
units for detailed estimate of the given structure of 24/7/2023 25/7/2023 the given drawing. 2 Prepare a report on market rates of given material, labour wages, hire charges of equipment, tools 28/7/2023 31/7/2023 required for to construct. 3 Prepare detailed specification for the given item using DSR 31/7/2023 01/8/2023
4 To prepare approximate estimate of various civil
engineering work. 01/8/2023 07/8/2023 5 To prepare approximate estimate of various civil engineering work. 07/8/2023 08/8/2023 6 Prepare a bill of quantity of the given item from actual measurement. 08/8/2023 14/8/2023 7 Prepare a bill of quantity of the given item from actual measurement 14/8/2023 21/8/2023 8 Calculate the quantity of items of work from the given set of drawing using standard measurement 21/8/2033 22/8/2023 sheet for load bearing structure from DSR (1BHK building with staircase) 9 Calculate the quantity of items of work from the given set of drawing using standard measurement 22/8/2023 28/8/2023 sheet for load bearing structure from DSR (1BHK building with staircase) 10 Calculate the quantity of items of work from the given set of drawing using standard measurement 28/8/2023 29/8/2023 sheet for load bearing structure from DSR (1BHK building with staircase) 11 Prepare detailed estimate from a given set of drawing using “standard measurement sheet & abstract format” for RCC frame structure using 29/8/2023 04/9/2023 description of item from DSR, along with the face sheet and prepare quarry chart, lead statement (G+1 building)-(footing, column) 12 Prepare detailed estimate from a given set of drawing using “standard measurement sheet & abstract format” for RCC frame structure using 04/9/2023 05/9/2023 description of item from DSR, along with the face sheet and prepare quarry chart.-(Beam) 13 Prepare detailed estimate from a given set of drawing using “standard measurement sheet & abstract format” for RCC frame structure using 05/9/2023 11/0/2023 description of item from DSR, along with the face sheet and prepare quarry chart, lead statement (G+1 building)-(slab) 14 Prepare detailed estimate from a given set of drawing using “standard measurement sheet & abstract format” for RCC frame structure using 11/9/2023 12/9/2023 description of item from DSR, along with the face sheet and prepare quarry chart, lead statement (G+1 building)-(chajja and lintel)
15 Prepare detailed estimate from a given set
ofdrawing using “standard measurement sheet & 12/9/2023 18/9/2023 abstract format” for RCC frame structure using description of item from DSR, along with the face sheet and prepare quarry chart, lead statement (G+1 building)-( measurement sheet, abstract sheet,face sheet and lead statment)
16 Calculate the reinforcement quantity from thre
given set of drawing for a room size of 3mx4m with 18/9/2023 25/9/2023 bar bending schedule(footing) 17 Calculate the reinforcement quantity from thre given set of drawing for a room size of 3mx4m with 25/9/2023 26/9/2023 bar bending schedule( column) 18 Calculate the reinforcement quantity from thre given set of drawing for a room size of 3mx4m with 26/9/2023 03/10/2023 bar bending schedule( beam, lintel) 19 Calculate the reinforcement quantity from thre given set of drawing for a room size of 3mx4m with 03/10/2023 09/10/2023 bar bending schedule( chajja slab) 20 Prepare the rate analysis for the given five items of 09/10/2023 10/10/2023 work. 21 Prepare detailed estimate of community well from 10/10/2023 16/10/2023 given drawing 22 Prepare detailed estimate of small septic tank from the given drawing 17 /10/2023 23/10/2023 23 Prepare Detailed estimate of W.B.M road of 1 kilometer length form the given drawing. 23/10/2023 30/10/2023 24 Use the relevant software to prepare detailed 30/10/2023 06/11/2023 Estimate of septic tank / community well Total Marks