7-Aug-23 22024 PM4 Equipment Layout Tags with Load Detailing 8:00 AM - 5:00 PM Start

Adjustment on rejects slab hole and positions location of filtrate water Draft Done

8-Aug-23 22024 PM4 Equipment Layout adjustment on Equipment Loads 8:00 AM - 5:00 PM Start

PM4 Equipment Foundation adding dimensions and checking Done

9-Aug-23 22024 PM4 Checking of Equipment Locations 8:00 AM - 5:00 PM Start

PM4 Equipment Layout adjustment on sedimex reject bin with consideration Done

10-Aug-23 22024 PM4 Equipment Layout with Load- confirmation on Reject press and reject conveyor 8:00 AM - 5:00 PM Start

PM4 Equipment Layout with Load Detailing - pulper conveyor Done

11-Aug-23 22024 PM4 Equipment Layout with Load Detailing, adding loads and building civil details 8:00 AM - 5:00 PM Start

PM4 Equipment Layout with Load- confirmation on pulper slabhole size Draft Done

Adjustment on PM4 Stock Chest Civil Layout Done

12-Aug-23 22024 PM4 Equipment Layout - Finalizing 8:00 AM - 5:00 PM Start

PM4 Equipment layout and Chest Civil guide - Finalizing Done

13-Aug-23 - Rest Day

Prepared By: Jhun Michael D. Locus Submitted To: PPI Office


Date: August 12, 2023 Date: August 12, 2023

Evaluation and Remarks:


Checked By: Arnold S. Sapanta 1-
Date: August 12, 2023 2-
3-

Week 32-2023 JDL Activity Report.xlsx Page 1 of 1

You might also like