Week No. 32
DAILY ACTIVITY REPORT Date Cut-In 7-Aug-23
7-Aug-23 22024 PM4 Equipment Layout Tags with Load Detailing 8:00 AM - 5:00 PM Start
Adjustment on rejects slab hole and positions location of filtrate water Draft Done
8-Aug-23 22024 PM4 Equipment Layout adjustment on Equipment Loads 8:00 AM - 5:00 PM Start
PM4 Equipment Layout adjustment on sedimex reject bin with consideration Done
10-Aug-23 22024 PM4 Equipment Layout with Load- confirmation on Reject press and reject conveyor 8:00 AM - 5:00 PM Start
11-Aug-23 22024 PM4 Equipment Layout with Load Detailing, adding loads and building civil details 8:00 AM - 5:00 PM Start
PM4 Equipment Layout with Load- confirmation on pulper slabhole size Draft Done