This document outlines the schedule for the National Seeds Bank project. It includes milestones and details the engineering, procurement, construction, and external works activities. Engineering activities such as shop drawings and materials submittals will take place from July 2023 through January 2024. Procurement of materials will occur between July 2023 and March 2024. Construction will run from July 2023 through June 2024 and includes substructure works, superstructure works for multiple floors, building envelope works, and external works. The overall project duration is from July 2023 through July 2024.
This document outlines the schedule for the National Seeds Bank project. It includes milestones and details the engineering, procurement, construction, and external works activities. Engineering activities such as shop drawings and materials submittals will take place from July 2023 through January 2024. Procurement of materials will occur between July 2023 and March 2024. Construction will run from July 2023 through June 2024 and includes substructure works, superstructure works for multiple floors, building envelope works, and external works. The overall project duration is from July 2023 through July 2024.
This document outlines the schedule for the National Seeds Bank project. It includes milestones and details the engineering, procurement, construction, and external works activities. Engineering activities such as shop drawings and materials submittals will take place from July 2023 through January 2024. Procurement of materials will occur between July 2023 and March 2024. Construction will run from July 2023 through June 2024 and includes substructure works, superstructure works for multiple floors, building envelope works, and external works. The overall project duration is from July 2023 through July 2024.