You are on page 1of 1

Continual Improvement Ideas -2023

SL NO KAIZEN SUGGESTED IMPLIMENTED Department


DATE Date
1 KEB Power indication 02.01.2023 31.02.2023 Maintenance

2 Coolant streaming and logging and wastage 08.02.2023 28.02.2023 Maintenance


3 Calibration cost saving 10.03.2023 10.03.2023 Quality
4 Flange U/C ring generation due high load on spindle 05.04.2023 06.04.2023 Production
5 Machined scrap On tool -1st path intrupted feed, 2 path continuous 26.06.2023 28.07.2023 Production
feed
6 Auto inspection gauging 28.07.2023 …… Quality
7 Packing Corrougated save of Rs-1380 01.08.2023 27.07.2023 Dispatch
8 Packing of rings changed-Jobs fall down at customer end 01.08.2023 02.08.2023 Dispatch
9 Packing Corrougated save of Rs-4500 01.08.2023 03.08.2023 Dispatch
10 Packing Corrougated save of Rs-1984 01.08.2023 12.08.2023 Dispatch
11 Packing Corrougated save of Rs-1380 01.08.2023 27.07.2023 Dispatch

You might also like