Location Service

Submission Inspection
S No. RFI Description of Activity From CH: To CH: Length Side Road/MC Item Status
Date Date
W

1863 KHPL/TK/NH-66/HWY/1837 1-Feb-2024 2-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 375+500 375+560 60 RHS MCW SG 1st Repeated

1864 KHPL/TK/NH-66/HWY/1838 1-Feb-2024 2-Feb-2024 FDD checking of Emb 3rd layer (MCW) 371+900 371+950 50 RHS MCW Emb 3rd Work Done

1865 KHPL/TK/NH-66/HWY/1839 1-Feb-2024 2-Feb-2024 FDD checking of Emb 3rd layer (MCW) 371+900 371+950 50 LHS MCW Emb 3rd Work Done

FDD checking of Emb 10th layer (Reinforcement- zone) (GA-03) (A2,


1866 KHPL/TK/NH-66/HWY/1840 1-Feb-2024 2-Feb-2024 380+680 380+970 290 RHS RE Wall Work Done
RHS)

1867 KHPL/TK/NH-66/HWY/1841 2-Feb-2024 3-Feb-2024 Laying , FDD & Level Checking of CTGSB Top layer (MCW) 375+500 375+560 60 RHS MCW CTGSB Work Done

1868 KHPL/TK/NH-66/HWY/1842 2-Feb-2024 3-Feb-2024 FDD checking of Emb 4th layer (MCW) 371+900 371+950 50 RHS MCW Emb 4th Work Done

1869 KHPL/TK/NH-66/HWY/1843 2-Feb-2024 3-Feb-2024 FDD checking of Emb 5th layer (MCW) 371+900 371+950 50 RHS MCW Emb 5th Work Done

1870 KHPL/TK/NH-66/HWY/1844 2-Feb-2024 3-Feb-2024 FDD checking of Emb 4th layer (MCW) 371+900 371+950 50 LHS MCW Emb 4th Work Done

1871 KHPL/TK/NH-66/HWY/1845 2-Feb-2024 3-Feb-2024 FDD checking of Emb 5th layer (MCW) 371+900 371+950 50 LHS MCW Emb 5th Work Done

1872 KHPL/TK/NH-66/HWY/1846 2-Feb-2024 3-Feb-2024 Laying , FDD & Level Checking of CTGSB Top layer (MCW) 379+400 379+530 130 RHS MCW CTGSB Work Done

1873 KHPL/TK/NH-66/HWY/1847 2-Feb-2024 3-Feb-2024 Laying , FDD & Level Checking of CTGSB Top layer (MCW) 379+550 379+860 310 RHS MCW CTGSB Work Done

1874 KHPL/TK/NH-66/HWY/1848 2-Feb-2024 3-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 375+670 375+780 110 LHS MCW SG 1st Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1875 KHPL/TK/NH-66/HWY/1849 2-Feb-2024 3-Feb-2024 376+430 376+470 40 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1, RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1876 KHPL/TK/NH-66/HWY/1850 2-Feb-2024 3-Feb-2024 376+430 376+470 40 RHS RE Wall Not Done
(A1, RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1877 KHPL/TK/NH-66/HWY/1851 2-Feb-2024 3-Feb-2024 376+430 376+470 40 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1, RHS)

1878 KHPL/TK/NH-66/HWY/1852 3-Feb-2024 4-Feb-2024 Paraweb fixing of RE Wall 3rd lift (GA-03) (A2, RHS) 380+680 380+970 290 RHS RE Wall Work Done

1879 KHPL/TK/NH-66/HWY/1853 3-Feb-2024 4-Feb-2024 Laying , FDD


Checking & Level
of RE PanelChecking of CTGSB
erection 3rd Top layer
lift & alignment for(MCW)
RE Wall (A2/RHS) 371+960 372+060 100 RHS MCW CTGSB Work Done
(GA-3) (design chainage 376+655) TA6 type-01 nos,, TB6 type-01 nos,
TC6 type-01 nos, TD6 type-01 nos, TE6 type-01 nos, TF6 type-01 nos, Panel
1880 KHPL/TK/NH-66/HWY/1854 3-Feb-2024 4-Feb-2024 376+965 377+070 105 RHS Work Done
TG6 type-01 nos, TH6 type-01 nos, MA4 type-01 nos, MB4 type-01 nos, Erection
MC4 type-01 nos, MD4 type-01 nos, MF4 type-01 nos, MG4 type-01 nos
1881 KHPL/TK/NH-66/HWY/1855 3-Feb-2024 4-Feb-2024 & MH4
FDD type-01ofnos,
checking Emb 6th layer (MCW) 371+900 371+950 50 RHS MCW Emb 6th Work Done

1882 KHPL/TK/NH-66/HWY/1856 3-Feb-2024 4-Feb-2024 FDD checking of Emb 7th layer (MCW) 371+900 371+950 50 RHS MCW Emb 7th Work Done
1883 KHPL/TK/NH-66/HWY/1857 3-Feb-2024 4-Feb-2024 FDD checking of Emb 6th layer (MCW) 371+900 371+950 50 LHS MCW Emb 6th Work Done

1884 KHPL/TK/NH-66/HWY/1858 3-Feb-2024 4-Feb-2024 FDD checking of Emb 7th layer (MCW) 371+900 371+950 50 LHS MCW Emb 7th Work Done

1885 KHPL/TK/NH-66/HWY/1859 3-Feb-2024 4-Feb-2024 FDD and level checking of SubgradeTop layer (MCW) 375+670 375+780 110 LHS MCW SG Top Work Done

1886 KHPL/TK/NH-66/HWY/1860 4-Feb-2024 5-Feb-2024 FDD and level checking of Emb Top layer (MCW) 371+900 371+950 50 RHS MCW Emb Top Work Done

1887 KHPL/TK/NH-66/HWY/1861 4-Feb-2024 5-Feb-2024 FDD and level checking of Emb Top layer (MCW) 371+900 371+950 50 LHS MCW Emb Top Work Done

1888 KHPL/TK/NH-66/HWY/1862 4-Feb-2024 5-Feb-2024 FDD checking of Subgrade 1st layer (Service Road) 379+080 379+100 20 RHS S/R SG 1st Work Done

1889 KHPL/TK/NH-66/HWY/1863 4-Feb-2024 5-Feb-2024 FDD and level checking of SubgradeTop layer (Service Road) 379+080 379+100 20 RHS S/R SG Top Work Done

1890 KHPL/TK/NH-66/HWY/1864 4-Feb-2024 5-Feb-2024 Laying , FDD & Level Checking of CTGSB Top layer (MCW) 375+660 375+780 120 LHS MCW SG Top Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1891 KHPL/TK/NH-66/HWY/1865 4-Feb-2024 5-Feb-2024 370+900 371+000 100 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1/RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1892 KHPL/TK/NH-66/HWY/1866 4-Feb-2024 5-Feb-2024 370+900 371+000 100 RHS RE Wall Work Done
(A1/RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1893 KHPL/TK/NH-66/HWY/1867 4-Feb-2024 5-Feb-2024 370+900 371+000 100 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1/RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1894 KHPL/TK/NH-66/HWY/1868 4-Feb-2024 5-Feb-2024 376+430 376+470 40 RHS RE Wall Work Done
(A1, RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1895 KHPL/TK/NH-66/HWY/1869 4-Feb-2024 5-Feb-2024 376+430 376+470 40 RHS RE Wall Work Done
work of RE Wall (GA-01) (A1, RHS)

FDD checking of Emb 11th layer (Reinforcement- zone) (GA-03) (A2,


1896 KHPL/TK/NH-66/HWY/1870 4-Feb-2024 5-Feb-2024 380+680 380+970 290 RHS RE Wall Work Done
RHS)

Excavation for ground improvement by granular material (RE Wall) Below


1897 KHPL/TK/NH-66/HWY/1871 4-Feb-2024 5-Feb-2024 376+470 376+530 60 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1, RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1898 KHPL/TK/NH-66/HWY/1872 4-Feb-2024 5-Feb-2024 376+470 376+530 60 RHS RE Wall Work Done
(A1, RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1899 KHPL/TK/NH-66/HWY/1873 4-Feb-2024 5-Feb-2024 376+470 376+530 60 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1, RHS)

1900 KHPL/TK/NH-66/HWY/1874 4-Feb-2024 5-Feb-2024 FDD checking of Emb 5th layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+063 373+125 62 LHS RE Wall Repeated

1901 KHPL/TK/NH-66/HWY/1875 4-Feb-2024 5-Feb-2024 FDD checking of Emb 5th layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+154 373+210 56 LHS RE Wall Repeated

1902 KHPL/TK/NH-66/HWY/1876 4-Feb-2024 5-Feb-2024 Paraweb fixing of RE Wall 1st lift (GA-04) (A2, LHS) 373+053 373+063 10 LHS RE Wall Repeated

1903 KHPL/TK/NH-66/HWY/1877 4-Feb-2024 5-Feb-2024 FDD checking of Emb 3rd layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+053 373+063 10 LHS RE Wall Repeated
1904 KHPL/TK/NH-66/HWY/1878 4-Feb-2024 5-Feb-2024 FDD checking of Emb 4th layer (Reinforcement- zone) (GA-03) (A2, RHS) 373+160 373+220 60 RHS RE Wall Repeated

1905 KHPL/TK/NH-66/HWY/1879 4-Feb-2024 5-Feb-2024 FDD checking of Emb 1st layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+000 373+053 53 LHS RE Wall Repeated

1906 KHPL/TK/NH-66/HWY/1880 4-Feb-2024 5-Feb-2024 FDD checking of Emb 2nd layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+000 373+053 53 LHS RE Wall Repeated

1907 KHPL/TK/NH-66/HWY/1881 5-Feb-2024 6-Feb-2024 Laying , FDD & Level Checking of CTGSB Top layer (Service Road) 379+080 379+100 20 RHS S/R CTGSB Work Done

1908 KHPL/TK/NH-66/HWY/1882 5-Feb-2024 6-Feb-2024 Excavation upto Emb Top layer (MCW) 369+900 370+130 230 RHS MCW EmbExc Work Done

1909 KHPL/TK/NH-66/HWY/1883 5-Feb-2024 6-Feb-2024 FDD and level checking of Emb Top layer (MCW) 369+900 370+130 230 RHS MCW Emb Top Work Done

1910 KHPL/TK/NH-66/HWY/1884 5-Feb-2024 6-Feb-2024 Laying , FDD & Level checking of WMM Top layer (Service Road) 380+770 380+920 150 RHS S/R WMM Top Work Done

1911 KHPL/TK/NH-66/HWY/1885 5-Feb-2024 6-Feb-2024 Scarification of bituminous surface of existing road 369+700 370+000 300 LHS MCW Milling Work Done

1912 KHPL/TK/NH-66/HWY/1886 5-Feb-2024 6-Feb-2024 Clearing & Grubbing Work (MCW) 369+700 370+000 300 LHS MCW C&G Work Done

1913 KHPL/TK/NH-66/HWY/1887 5-Feb-2024 6-Feb-2024 FDD and level recording of OGL bed (MCW) 369+700 370+000 300 LHS MCW OGL Work Done

1914 KHPL/TK/NH-66/HWY/1888 5-Feb-2024 6-Feb-2024 Excavation upto Emb Top layer (MCW) 369+700 370+000 300 LHS MCW EmbExc Not Done

1915 KHPL/TK/NH-66/HWY/1889 5-Feb-2024 6-Feb-2024 FDD and level checking of Emb Top layer (MCW) 369+700 370+000 300 LHS MCW Emb Top Not Done

1916 KHPL/TK/NH-66/HWY/1890 5-Feb-2024 6-Feb-2024 Laying , FDD & Level checking of WMM Top layer (MCW) 371+960 372+060 100 RHS MCW WMM Top Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1917 KHPL/TK/NH-66/HWY/1891 5-Feb-2024 6-Feb-2024 372+940 372+990 50 LHS RE Wall Work Done
TLP bottom level (GA-04) (A2, LHS)

FDD & level checking after ground improvement work RE Wall (GA-04)
1918 KHPL/TK/NH-66/HWY/1892 5-Feb-2024 6-Feb-2024 372+940 372+990 50 LHS RE Wall Work Done
(A2, LHS))

Pouring of PCC M-15 grade for levelling pad after ground improvement
1919 KHPL/TK/NH-66/HWY/1893 5-Feb-2024 6-Feb-2024 372+940 372+990 50 LHS RE Wall Not Done
work of RE Wall (GA-04) (A2, LHS)

1920 KHPL/TK/NH-66/HWY/1894 5-Feb-2024 6-Feb-2024 FDD checking of Emb 3rd layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+053 373+063 10 LHS RE Wall Repeated

1921 KHPL/TK/NH-66/HWY/1895 5-Feb-2024 6-Feb-2024 FDD checking of Emb 4th layer (Reinforcement- zone) (GA-03) (A2, RHS) 373+160 373+220 60 RHS RE Wall Repeated

1922 KHPL/TK/NH-66/HWY/1896 5-Feb-2024 6-Feb-2024 FDD checking of Emb 1st layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+000 373+053 53 LHS RE Wall Repeated

1923 KHPL/TK/NH-66/HWY/1897 5-Feb-2024 6-Feb-2024 FDD checking of Emb 2nd layer (Reinforcement- zone) (GA-04) (A2, LHS) 373+000 373+053 53 LHS RE Wall Repeated

1924 KHPL/TK/NH-66/HWY/1898 6-Feb-2024 7-Feb-2024 FDD checking of Subgrade 1st layer (Service Road) 383+370 383+500 130 LHS S/R SG 1st Work Done
1925 KHPL/TK/NH-66/HWY/1899 6-Feb-2024 7-Feb-2024 Laying , FDD & Level checking of WMM Top layer (MCW) 375+500 375+560 60 RHS MCW WMM Top Work Done

1926 KHPL/TK/NH-66/HWY/1900 6-Feb-2024 7-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 371+900 371+950 50 LHS MCW SG 1st Work Done

1927 KHPL/TK/NH-66/HWY/1901 6-Feb-2024 7-Feb-2024 FDD and level checking of SubgradeTop layer (MCW) 371+900 371+950 50 LHS MCW SG Top Work Done

1928 KHPL/TK/NH-66/HWY/1902 6-Feb-2024 7-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 371+900 371+950 50 RHS MCW SG 1st Work Done

1929 KHPL/TK/NH-66/HWY/1903 6-Feb-2024 7-Feb-2024 FDD and level checking of SubgradeTop layer (MCW) 371+900 371+950 50 RHS MCW SG Top Work Done

Pouring of PCC M-15 grade for levelling pad after ground improvement
1930 KHPL/TK/NH-66/HWY/1904 6-Feb-2024 7-Feb-2024 370+900 371+000 100 RHS RE Wall Work Done
work of RE Wall (GA-01) (A1/RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1931 KHPL/TK/NH-66/HWY/1905 6-Feb-2024 7-Feb-2024 376+470 376+530 60 RHS RE Wall Work Done
work of RE Wall (GA-01) (A1, RHS)

FDD checking of Emb 12th layer (Reinforcement- zone) (GA-03) (A2,


1932 KHPL/TK/NH-66/HWY/1906 6-Feb-2024 7-Feb-2024 380+680 380+970 290 RHS RE Wall Work Done
RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1933 KHPL/TK/NH-66/HWY/1907 7-Feb-2024 8-Feb-2024 372+940 372+990 50 LHS RE Wall Not Done
work of RE Wall (GA-04) (A2, LHS)

1934 KHPL/TK/NH-66/HWY/1908 7-Feb-2024 8-Feb-2024 FDD and level checking of SubgradeTop layer (Service Road) 383+370 383+500 130 LHS S/R SG Top Work Done

1935 KHPL/TK/NH-66/HWY/1909 7-Feb-2024 8-Feb-2024 Spraying of Prime Coat over WMM Top Layer (MCW) 371+980 372+060 80 RHS MCW Prime Coat Work Done

1936 KHPL/TK/NH-66/HWY/1910 8-Feb-2024 9-Feb-2024 FDD and level recording of OGL bed (Service Road) 371+890 372+060 170 LHS S/R OGL Work Done

1937 KHPL/TK/NH-66/HWY/1911 8-Feb-2024 9-Feb-2024 FDD and level recording of OGL bed (Service Road) 372+250 372+450 200 LHS S/R OGL Work Done

1938 KHPL/TK/NH-66/HWY/1912 8-Feb-2024 9-Feb-2024 FDD and level recording of OGL bed (Service Road) 371+890 372+060 170 RHS S/R OGL Work Done

1939 KHPL/TK/NH-66/HWY/1913 8-Feb-2024 9-Feb-2024 FDD and level recording of OGL bed (Service Road) 372+250 372+450 200 RHS S/R OGL Work Done

1940 KHPL/TK/NH-66/HWY/1914 8-Feb-2024 9-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 370+000 370+370 370 RHS MCW SG 1st Work Done

1941 KHPL/TK/NH-66/HWY/1915 8-Feb-2024 9-Feb-2024 Spraying of Prime Coat over WMM Top Layer (MCW) 375+400 375+550 150 RHS MCW Prime Coat Work Done

1942 KHPL/TK/NH-66/HWY/1916 8-Feb-2024 9-Feb-2024 Spraying of tack coat, laying & level checking of DBM (MCW) 371+980 372+060 80 RHS MCW DBM Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1943 KHPL/TK/NH-66/HWY/1917 8-Feb-2024 9-Feb-2024 372+990 373+060 70 LHS RE Wall Work Done
TLP bottom level (GA-04) (A2, LHS)

FDD & level checking after ground improvement work RE Wall (GA-04)
1944 KHPL/TK/NH-66/HWY/1918 8-Feb-2024 9-Feb-2024 372+990 373+060 70 LHS RE Wall Work Done
(A2, LHS))

Pouring of PCC M-15 grade for levelling pad after ground improvement
1945 KHPL/TK/NH-66/HWY/1919 8-Feb-2024 9-Feb-2024 372+940 373+060 120 LHS RE Wall Work Done
work of RE Wall (GA-04) (A2, LHS)
Excavation for ground improvement by granular material (RE Wall) Below
1946 KHPL/TK/NH-66/HWY/1920 9-Feb-2024 10-Feb-2024 376+530 376+580 50 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1, RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1947 KHPL/TK/NH-66/HWY/1921 9-Feb-2024 10-Feb-2024 376+530 376+580 50 RHS RE Wall Work Done
(A1, RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1948 KHPL/TK/NH-66/HWY/1922 9-Feb-2024 10-Feb-2024 376+530 376+580 50 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1, RHS)

Excavation for ground improvement by granular material (RE Wall) Below


1949 KHPL/TK/NH-66/HWY/1923 9-Feb-2024 10-Feb-2024 373+135 373+150 15 LHS RE Wall Work Done
TLP bottom level (GA-04) (A2, LHS)

FDD & level checking after ground improvement work RE Wall (GA-04)
1950 KHPL/TK/NH-66/HWY/1924 9-Feb-2024 10-Feb-2024 373+135 373+150 15 LHS RE Wall Work Done
(A2, LHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1951 KHPL/TK/NH-66/HWY/1925 9-Feb-2024 10-Feb-2024 373+135 373+150 15 LHS RE Wall Work Done
work of RE Wall (GA-04) (A2, LHS)

1952 KHPL/TK/NH-66/HWY/1926 9-Feb-2024 10-Feb-2024 Spraying of tack coat, laying & level checking of DBM (MCW) 375+400 375+550 150 RHS MCW DBM Work Done

1953 KHPL/TK/NH-66/HWY/1927 9-Feb-2024 10-Feb-2024 FDD checking of Emb 1st layer (Service Road) 371+960 372+290 330 LHS S/R Emb 1st Work Done

1954 KHPL/TK/NH-66/HWY/1928 9-Feb-2024 10-Feb-2024 FDD checking of Emb 1st layer (Service Road) 371+960 372+290 330 RHS S/R Emb 1st Work Done

1955 KHPL/TK/NH-66/HWY/1929 9-Feb-2024 10-Feb-2024 FDD and level checking of SubgradeTop layer (MCW) 370+000 370+370 370 RHS MCW SG 1st Work Done

1956 KHPL/TK/NH-66/HWY/1930 10-Feb-2024 11-Feb-2024 Laying , FDD & Level checking of WMM Top layer (MCW) 379+360 379+500 140 LHS MCW WMM Top Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1957 KHPL/TK/NH-66/HWY/1931 10-Feb-2024 11-Feb-2024 371+000 371+100 100 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1/RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1958 KHPL/TK/NH-66/HWY/1932 10-Feb-2024 11-Feb-2024 371+000 371+100 100 RHS RE Wall Work Done
(A1/RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1959 KHPL/TK/NH-66/HWY/1933 10-Feb-2024 11-Feb-2024 371+000 371+100 100 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1/RHS)

1960 KHPL/TK/NH-66/HWY/1934 10-Feb-2024 11-Feb-2024 FDD checking of Emb 1st layer (Reinforcement- zone) (GA-04) (A2, LHS) 380+760 381+010 250 LHS RE Wall Work Done

1961 KHPL/TK/NH-66/HWY/1935 10-Feb-2024 11-Feb-2024 FDD checking of Emb 1st layer (Reinforcement- zone) (GA-04) (A2, LHS) 372+990 373+130 140 LHS RE Wall Work Done

1962 KHPL/TK/NH-66/HWY/1936 11-Feb-2024 12-Feb-2024 FDD checking of Emb 2nd layer (Reinforcement- zone) (GA-04) (A2, LHS) 380+760 381+010 250 LHS RE Wall Work Done

1963 KHPL/TK/NH-66/HWY/1937 11-Feb-2024 12-Feb-2024 Paraweb fixing of RE Wall 1st lift (GA-04) (A2, LHS) 380+760 381+010 250 LHS RE Wall Work Done

1964 KHPL/TK/NH-66/HWY/1938 11-Feb-2024 12-Feb-2024 FDD checking of Emb 2nd layer (Reinforcement- zone) (GA-04) (A2, LHS) 372+990 373+130 140 LHS RE Wall Work Done

Pouring of PCC M-15 grade for levelling pad after ground improvement
1965 KHPL/TK/NH-66/HWY/1939 11-Feb-2024 12-Feb-2024 376+530 376+580 50 RHS RE Wall Work Done
work of RE Wall (GA-01) (A1, RHS)

Excavation for ground improvement by granular material (RE Wall) Below


1966 KHPL/TK/NH-66/HWY/1940 11-Feb-2024 12-Feb-2024 371+100 371+254 154 RHS RE Wall Not Done
TLP bottom level (GA-01) (A1/RHS)
FDD & level checking after ground improvement work RE Wall (GA-01)
1967 KHPL/TK/NH-66/HWY/1941 11-Feb-2024 12-Feb-2024 371+100 371+254 154 RHS RE Wall Not Done
(A1/RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1968 KHPL/TK/NH-66/HWY/1942 11-Feb-2024 12-Feb-2024 371+100 371+254 154 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1/RHS)

1969 KHPL/TK/NH-66/HWY/1943 11-Feb-2024 12-Feb-2024 Laying , FDD & Level checking of WMM Top layer (MCW) 375+660 375+770 110 LHS MCW WMM Top Work Done

1970 KHPL/TK/NH-66/HWY/1944 11-Feb-2024 12-Feb-2024 FDD checking of Emb 2nd layer (Service Road) 371+960 372+290 330 LHS S/R Emb 2nd Work Done

1971 KHPL/TK/NH-66/HWY/1945 11-Feb-2024 12-Feb-2024 FDD checking of Emb 2nd layer (Service Road) 371+960 372+290 330 RHS S/R Emb 2nd Work Done

1972 KHPL/TK/NH-66/HWY/1946 11-Feb-2024 12-Feb-2024 Clearing & Grubbing Work (MCW) 369+650 369+700 50 LHS MCW C&G Work Done

1973 KHPL/TK/NH-66/HWY/1947 11-Feb-2024 12-Feb-2024 FDD and level recording of OGL bed (MCW) 369+650 369+700 50 LHS MCW OGL Work Done

1974 KHPL/TK/NH-66/HWY/1948 11-Feb-2024 12-Feb-2024 Excavation upto Emb Top layer (MCW) 369+650 369+800 150 LHS MCW EmbExc Work Done

1975 KHPL/TK/NH-66/HWY/1949 11-Feb-2024 12-Feb-2024 FDD and level checking of Emb Top layer (MCW) 369+650 369+800 150 LHS MCW Emb Top Work Done

1976 KHPL/TK/NH-66/HWY/1950 11-Feb-2024 12-Feb-2024 Spraying of Prime Coat over WMM Top Layer (MCW) 371+970 372+060 90 LHS MCW Prime Coat Work Done

1977 KHPL/TK/NH-66/HWY/1951 11-Feb-2024 12-Feb-2024 Spraying of Prime Coat over WMM Top Layer (MCW) 375+660 375+770 110 LHS MCW Prime Coat Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1978 KHPL/TK/NH-66/HWY/1952 11-Feb-2024 12-Feb-2024 372+990 373+060 70 LHS RE Wall Repeated
TLP bottom level (GA-04) (A2, LHS)

FDD & level checking after ground improvement work RE Wall (GA-04)
1979 KHPL/TK/NH-66/HWY/1953 11-Feb-2024 12-Feb-2024 372+990 373+060 70 LHS RE Wall Repeated
(A2, LHS))

Pouring of PCC M-15 grade for levelling pad after ground improvement
1980 KHPL/TK/NH-66/HWY/1954 11-Feb-2024 12-Feb-2024 372+940 373+060 120 LHS RE Wall Repeated
work of RE Wall (GA-04) (A2, LHS)

Excavation for ground improvement by granular material (RE Wall) Below


1981 KHPL/TK/NH-66/HWY/1955 11-Feb-2024 12-Feb-2024 376+530 376+580 50 RHS RE Wall Repeated
TLP bottom level (GA-01) (A1, RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1982 KHPL/TK/NH-66/HWY/1956 11-Feb-2024 12-Feb-2024 376+530 376+580 50 RHS RE Wall Repeated
(A1, RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1983 KHPL/TK/NH-66/HWY/1957 12-Feb-2024 13-Feb-2024 371+000 371+100 100 RHS RE Wall Not Done
work of RE Wall (GA-01) (A1/RHS)

1984 KHPL/TK/NH-66/HWY/1958 12-Feb-2024 13-Feb-2024 FDD checking of Emb 1st layer (Reinforcement- zone) (GA-04) (A2, LHS) 376+970 377+070 100 LHS RE Wall Work Done

1985 KHPL/TK/NH-66/HWY/1959 12-Feb-2024 13-Feb-2024 FDD checking of Emb 3rd layer (Service Road) 371+960 372+290 330 LHS S/R Emb 3rd Work Done

1986 KHPL/TK/NH-66/HWY/1960 12-Feb-2024 13-Feb-2024 FDD checking of Emb 3rd layer (Service Road) 371+960 372+290 330 RHS S/R Emb 3rd Work Done

1987 KHPL/TK/NH-66/HWY/1961 12-Feb-2024 13-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 369+650 369+800 150 LHS MCW SG 1st Work Done
1988 KHPL/TK/NH-66/HWY/1962 12-Feb-2024 13-Feb-2024 FDD checking of Subgrade 1st layer (MCW) 369+820 370+000 180 RHS MCW SG 1st Work Done

1989 KHPL/TK/NH-66/HWY/1963 12-Feb-2024 13-Feb-2024 Spraying of tack coat, laying & level checking of DBM (MCW) 375+660 375+770 110 LHS MCW DBM Work Done

Excavation for ground improvement by granular material (RE Wall) Below


1990 KHPL/TK/NH-66/HWY/1964 13-Feb-2024 14-Feb-2024 371+100 371+230 130 RHS RE Wall Work Done
TLP bottom level (GA-01) (A1/RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
1991 KHPL/TK/NH-66/HWY/1965 13-Feb-2024 14-Feb-2024 371+100 371+230 130 RHS RE Wall Work Done
(A1/RHS)

Pouring of PCC M-15 grade for levelling pad after ground improvement
1992 KHPL/TK/NH-66/HWY/1966 13-Feb-2024 14-Feb-2024 371+100 371+230 130 RHS RE Wall Work Done
work of RE Wall (GA-01) (A1/RHS)

1993 KHPL/TK/NH-66/HWY/1967 13-Feb-2024 14-Feb-2024 FDD checking of Emb 3rd layer (Reinforcement- zone) (GA-04) (A2, LHS) 380+760 381+010 250 LHS RE Wall Work Done

1994 KHPL/TK/NH-66/HWY/1968 13-Feb-2024 14-Feb-2024 FDD checking of Emb 4th layer (Reinforcement- zone) (GA-04) (A2, LHS) 380+760 381+010 250 LHS RE Wall Work Done

1995 KHPL/TK/NH-66/HWY/1969 13-Feb-2024 14-Feb-2024 FDD checking of Emb 2nd layer (Reinforcement- zone) (GA-04) (A2, LHS) 376+970 377+070 100 LHS RE Wall Work Done

1996 KHPL/TK/NH-66/HWY/1970 13-Feb-2024 14-Feb-2024 Spraying of tack coat, laying & level checking of DBM (MCW) 371+970 372+060 90 LHS MCW DBM Work Done

1997 KHPL/TK/NH-66/HWY/1971 13-Feb-2024 14-Feb-2024 FDD checking of Emb 4th layer (Service Road) 371+960 372+290 330 LHS S/R Emb 4th Work Done

1998 KHPL/TK/NH-66/HWY/1972 13-Feb-2024 14-Feb-2024 FDD checking of Emb 4th layer (Service Road) 371+960 372+290 330 RHS S/R Emb 4th Work Done

1999 KHPL/TK/NH-66/HWY/1973 13-Feb-2024 14-Feb-2024 FDD and level checking of Emb Top layer (Service Road) 373+540 374+000 460 LHS S/R Emb Top Work Done

2000 KHPL/TK/NH-66/HWY/1974 13-Feb-2024 14-Feb-2024 FDD and level checking of SubgradeTop layer (MCW) 369+800 370+000 200 RHS MCW SG Top Work Done

Pouring of PCC M-15 grade for levelling pad after ground improvement
2001 KHPL/TK/NH-66/HWY/1975 14-Feb-2024 15-Feb-2024 371+000 371+100 100 RHS RE Wall Repeated
work of RE Wall (GA-01) (A1/RHS)

FDD checking of Emb 7th layer (Reinforcement- zone, RE Wall) (A2/RHS) Status not
2002 KHPL/TK/NH-66/HWY/1976 14-Feb-2024 15-Feb-2024 376+875 376+960 85 RHS RE Wall
(GA-3) Received

FDD checking of Emb 1st layer (Reinforcement- zone, RE Wall) (A2/LHS) Status not
2003 KHPL/TK/NH-66/HWY/1977 14-Feb-2024 15-Feb-2024 376+875 376+970 95 LHS RE Wall
(GA-4) Received

FDD checking of Emb 2nd layer (Reinforcement- zone, RE Wall) Status not
2004 KHPL/TK/NH-66/HWY/1978 14-Feb-2024 15-Feb-2024 376+875 376+970 95 LHS RE Wall
(A2/LHS) (GA-4) Received

Status not
2005 KHPL/TK/NH-66/HWY/1979 14-Feb-2024 15-Feb-2024 Paraweb fixing of RE Wall 1st lift (GA-04) (A2, LHS) 376+970 377+070 100 LHS RE Wall
Received

Status not
2006 KHPL/TK/NH-66/HWY/1980 14-Feb-2024 15-Feb-2024 FDD checking of Emb 5th layer (Service Road) 371+960 372+290 330 LHS S/R Emb 4th
Received

Status not
2007 KHPL/TK/NH-66/HWY/1981 14-Feb-2024 15-Feb-2024 FDD checking of Emb 5th layer (Service Road) 371+960 372+290 330 RHS S/R Emb 4th
Received

Status not
2008 KHPL/TK/NH-66/HWY/1982 14-Feb-2024 15-Feb-2024 FDD checking of Subgrade 1st layer (Service Road) 373+540 374+000 460 LHS S/R SG 1st
Received
Excavation for ground improvement by granular material (RE Wall) Below
2009 KHPL/TK/NH-66/HWY/1983 14-Feb-2024 15-Feb-2024 372+990 373+060 70 LHS RE Wall Repeated
TLP bottom level (GA-04) (A2, LHS)

FDD & level checking after ground improvement work RE Wall (GA-04)
2010 KHPL/TK/NH-66/HWY/1984 14-Feb-2024 15-Feb-2024 372+990 373+060 70 LHS RE Wall Repeated
(A2, LHS))

Pouring of PCC M-15 grade for levelling pad after ground improvement
2011 KHPL/TK/NH-66/HWY/1985 14-Feb-2024 15-Feb-2024 372+940 373+060 120 LHS RE Wall Repeated
work of RE Wall (GA-04) (A2, LHS)

Excavation for ground improvement by granular material (RE Wall) Below


2012 KHPL/TK/NH-66/HWY/1986 14-Feb-2024 15-Feb-2024 376+530 376+580 50 RHS RE Wall Repeated
TLP bottom level (GA-01) (A1, RHS)

FDD & level checking after ground improvement work RE Wall (GA-01)
2013 KHPL/TK/NH-66/HWY/1987 14-Feb-2024 15-Feb-2024 376+530 376+580 50 RHS RE Wall Repeated
(A1, RHS)