You are on page 1of 15

M/S.

K J S CEMENT LIMITED
FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTION-

DATE : 18.03.12

M/S. GAGAN ENGINEERING


R.A. BILL-383 (PIPE LINE CONNECTIONS AT C.F. SILO )

SL.
NO.

DESCRIPTION

RATE
(Rs.)/NOS

CLAIMED
QTY. (NOS)

THIS BILL
QTY. (NOS)

DIFF.
(NOS)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

3/2'' Connection (Bend,


Union, BF-Valve & Flange)

75

378.00

378.00

0.00

28350.00

28350.00

0.00

5/2'' Connection (Bend, BFValve & Flange )

125

639.00

639.00

0.00

79875.00

79875.00

0.00

3'' Connection ( Flange &


BF- Valve)

150

2.00

2.00

0.00

300.00

300.00

0.00

5'' Connection (Bend &


Flange)

250

7.00

7.00

0.00

1750.00

1750.00

0.00

6'' Connection (Bend,


Flange & BF-Valve)

300

6.00

6.00

0.00

1800.00

1800.00

0.00

6 15/2'' Connection (Bend)

325

5.00

5.00

0.00

1625.00

1625.00

0.00

REMARKS

8'' Connection (Bend, BFValve & Hose Pipe)

8 10'' Connection (Bend)

400

29.00

29.00

0.00

11600.00

11600.00

0.00

500

3.00

3.00

0.00

1500.00

1500.00

0.00

0.00

126800.00

126800.00

0.00

ABOVE SUM
NOTE:- Above Rates are converted as per size of Fittings.

Net Payable Amount = Rs. 126800.00


Net Payable Amount -- Rs.One Lac Twenty Six Thousand Eight Hundred Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTION-

SL.
NO.

DATE : 18.03.12

M/S. GAGAN ENGINEERING


R.A. BILL-382 (PIPE LINE CONNECTIONS AT C.F. SILO )

DESCRIPTION

RATE
(Rs.)/MTR

CLAIMED QTY.
(MTR)

THIS BILL
QTY. (MTR)

DIFF.
(MTR)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

REMARKS

Cancelled

MS-Pipe 1/2'' Erection


Work at CF Silo

37.50

50.40

0.00

50.40

0.00

0.00

0.00

Erection of MS-Pipe 3/4''


at CF Silo

56.25

57.40

57.40

0.00

3228.75

3228.75

0.00

Erection of MS-Pipe 3/2''


at CF Silo

112.50

12.05

12.05

0.00

1355.85

1355.85

0.00

Erection of MS-Pipe 5/2''


at CF Silo

187.50

364.92

364.60

0.32

68422.50

68362.50

60.00

Excess

Erection of MS-Pipe 3'' at


CF Silo

225.00

0.60

0.52

0.08

135.00

117.00

18.00

Excess

Erection of MS-Pipe 4'' at


CF Silo

300.00

0.54

0.54

0.00

162.00

162.00

0.00

Erection of MS-Pipe 5'' at


CF Silo

375.00

16.55

16.55

0.00

6206.25

6206.25

0.00

Erection of MS-Pipe 6'' at


CF Silo

450.00

192.27

192.25

0.02

86521.50

86512.50

9.00

Erection of MS-Pipe 13/2''


at CF Silo

487.50

15.80

15.80

0.00

7702.50

7702.50

0.00

Erection of MS-Pipe 8'' at


CF Silo

600.00

23.10

23.10

0.00

13860.00

13860.00

0.00

Erection of MS-Pipe 10'' at


CF Silo

750.00

16.22

16.22

0.00

12165.00

12165.00

0.00

749.85

699.03

50.82

199759.35

199672.35

87.00

10

ABOVE SUM

Excess

NOTE:- Above Rates are converted as per size of pipes.


Net Excess Amount = Rs. 87.00
Net Payable Amount = Rs. 199672.35
Net Payable Amount -- Rs.One Lac Ninety Nine Thousand Six Hundred Seventy Two & Thirty Five Paisa Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

DATE : 18.03.12

M/S. GAGAN ENGINEERING


R.A. BILL-381 (FABRICATION & ERECTION AT C.F. SILO )

DESCRIPTION

RATE
(Rs.)/MT

CLAIMED
QTY. (MT)

THIS BILL
QTY. (MT)

DIFF.
(MT)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

REMARKS

Structural Fabrication
Work at CF Silo

6500.00

56.746

36.933

19.813

368849.00

240064.50

128784.50

Excess Amount

Structural Erection Work


at CF Silo

5500.00

70.088

50.275

19.813

385484.00

276512.50

108971.50

Excess Amount

Erection of Equipment
(Load Cell )

7900.00

0.570

0.570

0.000

4503.00

4503.00

0.00

Erection of Equipment (
Blower Fan )

6500.00

1.760

1.760

0.000

11440.00

11440.00

0.00

Hand Railing Work at CF


Silo

140.00

225.340

225.340

0.000

31547.60

31547.60

0.00

354.50

314.88

39.63

801823.60

564067.60

237756.00

ABOVE SUM

Net Excess Amount = Rs. 237756.00


Net Payable Amount = Rs. 564067.60
Net Payable Amount -- Rs.Five Lac Sixty Four Thousand Sixty Seven & Sixty Paisa Only
TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTOR-

16.03.12

M/S. GAGAN ENGINEERING

DESCRIPTION-

R.A. BILL-380 ( MAN POWER SUPPLY-- WORK AT C.F. SILO )

SL. NO.

DESCRIPTION

RATE
(Rs.)/MT

CLAIMED QTY.
(Mandays)

AMOUNT
CLAIMED (Rs.)

Millwright Fitter

450.00

36.620

16479.00

Welder

250.00

36.620

9155.00

Rigger

250.00

36.620

9155.00

Khalashis

200.00

146.000

29200.00

REMARKS

63989.00

ABOVE SUM

Net Payable Amount = Rs.

63989.00

Net Payable Amount -- Rs. Sixty Three Thousand Nine Hundred Eighty Nine Only

Note:- As per Mechanical Department, the Above Amount Rs. 63989.00/- will be debited by M/s. FLS

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

DATE : 11.04.12

M/S. GAGAN ENGINEERING


R.A. BILL-386 (FABRICATION & ERECTION AT C.F. SILO )

DESCRIPTION

RATE
(Rs.)/MT

CLAIMED
QTY. (MT)

THIS BILL
QTY. (MT)

DIFF.
(MT)

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

Erection of Air Slide


Blower's Fan & Motor

0.00

0.00

Erection of Bag Filter's


Fan & Motor

0.00

0.00

Erection of Root Blower's


Motor

0.00

0.00

Equipment Erection Work


at CF Silo

5 Erection of Ventury Bags

0.00

0.00

Erection & Fabrication of


Air Slide Parts

0.00

0.00

0.00

0.00

ABOVE SUM

0.00

0.00

0.00

0.00

Net Excess Amount = Rs. 0.00


Net Payable Amount = Rs. 0.00
Net Payable Amount -- Rs.Five Lac Sixty Four Thousand Sixty Seven & Sixty Paisa Only

REMARKS

TRUSST ENGINEERS