Construction Billing Summary

This document is an invoice from M/S. JK Engineering to M/S. K J S Cement Limited for various construction works at a 6000 TPD cement plant. It includes details of pipe laying and installation work done across different areas of the plant at various floor levels. The total claimed amount is Rs. 72093.71 while the total checked amount is Rs. 70745.71, resulting in an excess amount of Rs. 1348.00 to be held from payment.

Uploaded by

vinod_eics
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views8 pages

Construction Billing Summary

This document is an invoice from M/S. JK Engineering to M/S. K J S Cement Limited for various construction works at a 6000 TPD cement plant. It includes details of pipe laying and installation work done across different areas of the plant at various floor levels. The total claimed amount is Rs. 72093.71 while the total checked amount is Rs. 70745.71, resulting in an excess amount of Rs. 1348.00 to be held from payment.

Uploaded by

vinod_eics
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

M/S.

K J S CEMENT LIMITED
FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

DATE : 28.03.12

M/S. JK ENGINEERING
R.A. BILL-07 Dated: 10.02.12 (PIPE LINE WORK AT PH BLDG. & COAL MILL AREA)

DESCRIPTION

UNIT

RATE
(Rs.)/UNIT

CLAIMED
QTY.

THIS BILL
QTY.

DIFF.

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

MS-Pipe Erection-1''

MTR

48.50

MS-Pipe Erection-3/4''

MTR

48.50

MS-Pipe Erection-2''

MTR

97.00

GI-Pipe Erection-3/2''

MTR

72.75

GI-Pipe Erection-5/2''

MTR

121.25

MS-Bend Erection-3/4''

NOS

110.00

MS-Tee Erection-3/4''

NOS

120.00

MS-Bend Erection-1''

NOS

110.00

MS-Tee Erection-1''

NOS

120.00

Bend Erection-3/2''

NOS

165.00

MS-Tee Erection-3/2''

NOS

180.00

MS-Bend Erection-2''

NOS

220.00

MS-Bend Erection-5/2''

NOS

275.00

MS-Tee Erection-2''

NOS

240.00

Gate Valve Erection-1''

NOS

250.00

Gate Valve Erection-5/2''

NOS

250.00

17 Gate Valve Erection-3/2''

NOS

250.00

361.500
100.000
115.500
122.500
72.500
23.000
7.000
54.000
10.000
10.000
14.000
14.000
5.000
1.000
13.000
8.000
2.000

361.500
100.000
115.500
122.500
72.500
23.000
7.000
54.000
10.000
10.000
14.000
14.000
5.000
1.000
13.000
8.000
2.000

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

17532.75
4850.00
11203.50
8911.88
8790.63
2530.00
840.00
5940.00
1200.00
1650.00
2520.00
3080.00
1375.00
240.00
3250.00
2000.00
500.00

17532.75
4850.00
11203.50
8911.88
8790.63
2530.00
840.00
5940.00
1200.00
1650.00
2520.00
3080.00
1375.00
240.00
3250.00
2000.00
500.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18 Gate Valve Erection-1/2''

NOS

250.00

19 Hose Pipe Erection

NOS

31.00

20 Erection of Reducer 2''-1''

NOS

140.00

8.000
17.000
1.000

8.000
17.000
1.000

0.00
0.00
0.00

2000.00
527.00
140.00

2000.00
527.00
140.00

0.00
0.00
0.00

Erection of Reducer 5/2''3/2''

NOS

210.00

1.000

1.000

0.00

210.00

210.00

0.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

21

REMARKS

Erection of Reducer 3/2''3/4''

NOS

140.00

3.000

3.000

0.00

420.00

420.00

0.00

Union Flange Erection-1''

NOS

30.00

Erection of Flange-3/2''

NOS

30.00

Erection of Flange-3/4''

NOS

30.00

Fixing of Insert Plate

NOS

275.00

11.000
10.000
13.000
52.000

11.000
10.000
13.000
52.000

0.00
0.00
0.00
0.00

330.00
300.00
390.00
14300.00

330.00
300.00
390.00
14300.00

0.00
0.00
0.00
0.00

27 Fixing of Anchor Fastners

NOS

80.00

156.000

156.000

0.00

12480.00

12480.00

0.00

28
29
30
31
32

Fabrication of Bag Filter

KGS

5800.00

Erection of Bag Filter

KGS

6000.00

Fabrication of Hopper

KGS

7000.00

Erection of Hopper

KGS

7000.00

Hold Release R.A. Bill-06

..

..

62.600
62.60
4607.50
4607.50
.

62.600
62.600
4607.500
4607.500
.

0.00
0.00
0.00
0.00
.

363.08
375.60
32252.50
32252.50
92000.81

363.08
375.60
32252.50
32252.50
92000.81

0.00
0.00
0.00
0.00
0.00

264755.24

264755.24

0.00

22
23
24
25
26

ABOVE SUM

Net Payable Amount = Rs. 264755.24

Net Payable Amount -- Rs.Two Lac Sixty Four Thousand Seven Hundred Fifty Five and Twenty Four Paisa Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTION-

DATE: 05.05.12

M/S. JK ENGINEERING
R.A. BILL-08 DATED : 16.03.12 ( MAN POWER SUPPLY WORK )

SL.
NO.

DESCRIPTION

RATE
(Rs.)

CLAIMED
QUANTITY

CHECKED
QUANTITY

DIFF.
(Excess)

AMOUNT
CLAIMED (Rs.)

AMOUNT
CHECKED (Rs.)

EXCESS
/ HOLD

Fitter

450.00

18.750

18.750

0.000

8437.50

8437.50

0.00

Welder

250.00

21.500

21.500

0.000

5375.00

5375.00

0.00

Rigger

250.00

27.120

27.120

0.000

6780.00

6780.00

0.00

Grinder Man

225.00

1.370

1.370

0.000

308.25

308.25

0.00

Khalashi

200.00

29.870

29.870

0.000

5974.00

5974.00

0.00

Helper

200.00

14.250

14.250

0.000

2850.00

2850.00

0.00

29724.75

29724.75

0.00

ABOVE SUM

Net Payable Amount = Rs.

REMARKS

29724.75

Net Payable Amount -- Rs. Twenty Nine Thousand Seven Hundred Twenty Four & Seventy Five Paisa Only

TRUSST ENGINEERS

M/S. K J S CEMENT LIMITED


FOR- 6000 TPD CEMENT PLANT
CONTRACTORDESCRIPTIONSL.
NO.

DATE: 04.05.12

M/S. JK ENGINEERING
R.A. BILL-09 DATED : 06.03.12 ( MISCELLANEOUS AIR PIPE LINE WORK )

DESCRIPTION

Air Pipe Line Work from Clinker Cooler to


Un-burnt Silo

Water Line Work in Clinker Cooler Area

Bag Filter Air Pipe Line Work at GF

Air Pipe Line Work from Un-burnt Silo to


Clinker Silo

Nitrogen Pipe Line Work at 36.00 MTR Floor


Level in Coal Mill Area

Inserts & Anchor Fixing at Burner Platform

ABOVE SUM

AMOUNT
CLAIMED (Rs.)

AMOUNT
CHECKED (Rs.)

EXCESS
AMOUNT (Rs.)

REMARKS

72093.71

70745.71

1348.00

Excess Amount

72093.71

70745.71

1348.00

Net Excess Amount = Rs.

1348.00

Net Payable Amount = Rs.

70745.71

Net Payable Amount -- Rs. Seventy Thousand Seven Hundred Forty Five & Seventy One Paisa Only