This is to certify that the following tasks related to Work Order # 161/13026876 Dated: 28.09.2019 has
been successfully completed by M/s kaliyangi construction pvt. ltd. NLDLM-CHAMBA SALUNI
S.
Description Activity UOM Qty Remarks
No
1 T&D Mtr. 3873 3873*2=7746 MTR (Blue-Green)
2 DIT Mtr. 3873
3 CHARGES FOR CIR POLE 7.5M SB NOS 25
4 BLOWING 24F UG Mtr. 4.114 4.114 INCL. Loop
5 24F STRINGING DONE Mtr. 0.655 0.655 INCL. Loop
6 CLOSURE,JOINT,OFC,24F(6LT X 8F) Nos. 2
7 PANEL,DISTRIBUTION,FIBRE,24T,MLT Nos 1
8 NP 2 MANHOLE NOS 7
9 BLOCK TYPE MANHOLE NOS 1
10 EARTHING NOS 25
11 GI Mtr. 18
12 CLAMP,POLE,(50/65/400);PN:PC/H150/65-400 Nos 25
13 CLAMP,LOOP;PN:LC/H150/65-400 Nos 1
14 D-SHACKLE, CS, 0.75T SWL-VK Nos 50
15 THIMBLE, CS, 0.75T SWL-ERT Nos 100
16 TURN BUCKLE,0.75T SWL-VK Nos 50
17 TERMINATING HELIX FOR 11.5MM OFC-ERT Nos 50
18 PROTECTIVE HELIX FOR 11.5MM OFC-ERT Nos 50
TERMINATION ASSEMBLY =4.769
The total continuous Aerial Cable length to be invoiced in for aerial route is 4.828 as detail given below:
(NLDLM-CHAMBA SALUNI) Aerial Cable length 0.655 KM OFC ARM.= 4.114 KM
TOTAL 4.769 METERS
HOTO Done. FAT submitted.
There is no 3rd Party Claim pending on the route
There is no deduction on 3rd party claim which is settled by HFCL
All labor law compliances and other statutory compliances fulfilled
The above route is successfully handover to RJIL and no work is pending on the route.
The above route is successfully handover to RJIL and no work is pending on the route.
(Name of Area Manager/EIC): (Name of CPH):
Signature: Signature:
Date: Date:
Certified By:-
Name of CCM/NLD CM: Name of SCH:
Signature Signature
(Name & Contact No.)
*Additional details or line items can be added by adding additional rows in the above table, if required
Final Completion Certificate NLD LM - BLOWING
TOTAL 4.769
____________________________ _________________________________
(Name of Area Manager/EIC): (Name of CPH):
Signature: Signature:
Data: Date
Final Completion Certificate- DIT
This is to certify that the DIT related to Work Order # Work Order #
161/13026876 Dated: 28.09.2019 has been successfully completed by
M/s kaliyangi construction pvt. ltd. (NLDLM-CHAMBA SALUNI)
The total continuous route length of 2 ducts- DIT to be invoiced is 3.873
MTR (K.M. as per MB Sheets) from under mention chain-age:
Length
Chain age Invoiced
Sr. No From To (Meter) Remark
1 0 66 66
2 66 326 260
3 326 1176 850
4 1176 1917 741
5 1917 2975 1058
6 2975 3870 895
7 3870 3873 3
TOTAL 3873
Above mentioned gap has been excluded from invoice quantity.
_________________________________ _________________________________
(Name of Area Manager/EIC): (Name of CPH):
Signature: Signature:
Data: Date
Final Completion Certificate
This is to certify that OFC Splicing pertaining to Work Order
#161/13026876 Dated: 28.09.201 has been successfully completed by M/s
kaliyangi construction pvt. Ltd.(NLDLM-CHAMBA SALUNI)
Splicing
Splicing /
Termination Nos. of Earthling
Sr.No Chain age splice OFC Chain age Remarks
1 1 24 24 F NR FDP
2 2 24 24 F NR JC
3 3 24 24 F NR JC
FDP: 01 Nos.
_______________________ _______________
(Name of Area Manager/EIC): (Name of CPH):
Signature: Signature:
Data: Date
Final Completion Certificate NLD Last Mile (Supply of NON FIM Material)
________________________ ______________________
(Name of Area Manager/EIC): (Name of CPH):
Signature: Signature:
Date: Date:
Signature:
Circle commercial lead
Date:-
Final Acceptance Certificate for OTDR NLD
Signature: Signature:
Date : Date :
FINAL ACCEPTANCE TEST CERTIFICATE
_________________________________ _________________________________
(Name of Area Manager / EIC): (Name of CPH):
Signature: Signature:
Date: Date:
_________________________________
(Name of Spread Construction Head):
Signature:
Date:
Final Completion Certificate NLD LM – STRINGING
This is to certify that the OFC STRINGING pertaining to Work Order # 161/13026876
Dated: 28.09.2019 has been successfully completed by M/s kaliyangi construction pvt.
ltd. (NLDLM-CHAMBA SALUNI)
POLE AERIAL
MB STRINGING NO OF
INSTALLATION LOOP
S. No. Sheet DISTANCE AERIAL REMARKS
LENGTH
No. FROM TO (MTR) LOOPS
(MTR)
1 HP1 MH P1 0 24F
2 HP1 P1 P2 27 24F
3 HP1 P2 P3 23.3 24F
4 HP1 P3 P4 22.5 24F
5 HP1 P4 P5 20.5 24F
6 HP1 P5 P6 22.3 24F
7 HP1 P6 P7 34.4 24F
8 HP1 P7 P8 20.5 24F
9 HP1 P8 P9 16 24F
10 HP1 P9 P10 21.3 24F
11 HP1 P10 P11 21.6 24F
12 HP1 P11 P12 18.8 24F
13 HP1 P12 P13 19.6 24F
14 HP1 P13 P14 14.3 24F
15 HP1 P14 P15 34.3 24F
16 HP1 P15 P16 20.5 47 47 24F
17 HP1 P16 P17 19.1 24F
18 HP1 P17 P18 22.3 24F
19 HP1 P18 P19 32 24F
20 HP1 P19 P20 16.4 24F
21 HP1 P20 P21 17 24F
22 HP1 P21 P22 28.3 24F
23 HP1 P22 P23 19 24F
24 HP1 P23 P24 30.5 24F
25 HP1 P24 P25 21.3 24F
26 HP1 P25 MH 65 24F
TOTAL 608 47 47
OFC Stringing
The total route length of 48 F ADSS STRINGING to be invoiced 0.655 KM. as per MB Sheets against under
mentioned chain-age:-
SIGNATURE: SIGNATUR