Professional Documents
Culture Documents
1943 DW044-P02-MCC-CON-INR-A13745 2 10-Jun-21 Roads Other Prior to Open Road 3 790 Ch: 0+600 to 1+100. S S
3517 DW044-P02-MCC-CON-INR-A15935 2 10-Jun-21 Roads Other Prior to Open Road 2 632 Ch: 0+090 to 0+390, 0+000 to 0+053 S S
7431 DW044-P02-MCC-CON-INR-A20117 1 10-Jun-21 Roads Sub Base Laying 7 249 Ch: 0+050 to 0+300 (LHS) Cycle Track. S S
7836 DW044-P02-MCC-CON-INR-A20646 0 10-Jun-21 Structure SW Manhole Rebar for Wall 3 790 GW-2995 and GW-2994. S S
7837 DW044-P02-MCC-CON-INR-A20647 0 10-Jun-21 Structure SW Manhole Shuttering & Casting of Wall 3 790 GW-2995 and GW-2994 (1st & Final Stage). S S
TSE Ch: (0+000 to 0+040, 0+627 to 0+646) (Road
7854 DW044-P02-MCC-CON-INR-A20664 0 10-Jun-21 Drainage TSE Line Surround with geo-Textile 7 344 S S
Ch: 0+320 to 0+372).
45°B-044-056 (TSE Ch: 0+642.063), TEE-044-032
(TSE Ch: 0+000), 45°B-044-107 (TSE Ch:
0+033.884), 45°B-044-107-A (TSE Ch:
7856 DW044-P02-MCC-CON-INR-A20666 0 10-Jun-21 Drainage TSE Line Thrust Block 7 344 0+035.884), 45°B-044-108-A (TSE Ch: S S
0+041.884), 22.5°B-044-003-B (TSE Ch:
0+045.884) and 22.5°B-044-003-A (TSE Ch:
0+051.884).
7899 DW044-P02-MCC-CON-INR-A20709 0 10-Jun-21 Roads K3 Installation 7 249 Ch: 0+517 (Speed Table). S S
7900 DW044-P02-MCC-CON-INR-A20710 0 10-Jun-21 Roads K3 Backing Concrete 7 249 Ch: 0+517 (Speed Table). S S
QNBN CH17 (JRC 14), CH18 (JRC 14) and CH14 (JRC
7904 DW044-P02-MCC-CON-INR-A20714 0 10-Jun-21 Utilities Imported Treated Backfill 7 249 S S
Chamber 14).
QNBN
7905 DW044-P02-MCC-CON-INR-A20715 0 10-Jun-21 Utilities DI Cover Installation 7 249 CH18 (JRC 14). S S
Chamber
Ch: 0+050 (JRC14) to CH16 (JRC14) LHS
7911 DW044-P02-MCC-CON-INR-A20721 0 10-Jun-21 Utilities QNBN Line Imported Treated Backfill 7 249 S S
(Warning Tape).
Ch: 0+930 to 0+950, 0+640 to 378, 0+020 to
7919 DW044-P02-MCC-CON-INR-A20729 0 10-Jun-21 Roads K9 Installation 7 249 S S
0+310 (LHS) (Landscaping – for Planting Area).