20mm THICK CEMENT PLASTERING C

MATERIAL REQUIREMENT ANALYSIS FOR 10M3 VOLUME


12mm thick plaster (1:3)= 100 m2
Thickness 0.020 m
Qty of mortar required= 2.000 m3
After adding additional mortar for, joints, uneven surface

Qty of mortar required= 2.800 m3

>Cement
Quantity of Cement = 0.70 m3
Nos of Cement Bag= 20 bag

>Sand
Quantity of sand = 2.10 m3

RATE ANAL
ITEM NAME : 12mm THICK CEMENT PLASTERING IN C
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY

1 SAND 2.10 m3
2 CEMENT 20.00 bag
3 SUNDRIES -
4
5
6
7
8
9

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 MISTRI 0.25
2 MASON 10
3 MALE COOLIE 10.00
4 FEMALE COOLIE 10
5 BHISTI 2
6 SUNDRIES -
(B) Equipment Cost Analysis
SR.NO Equipment Name

1
2 -
3 -
TOTAL COST

NOTES
EMENT PLASTERING COST ANALYSIS

UME

ortar for, joints, uneven surface, dry wet conversion. etc

0.70 m3

RATE ANALYSIS SHEET


HICK CEMENT PLASTERING IN CEMENT MORTAR (1;3), QUANTITY (100 SQURE METER)

RATE PER AMOUNT


RS/- RS/-
800 CUBIC METER 1680
320 bag 6400
- - 50

TOTAL COST RS/- 8130

RATE PER AMOUNT


RS/- RS/-
400 day 100
300 day 3000
200 day 2000
180 day 1800
200 day 400
- - 50
Total Cost 7350

(A) MATERIAL COST 8130


HIRE CHARGES (B) LABOUR COST 7350
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 15480
TOTAL COST 0 2 1.5% WATER CHARGE 232.2
3 10% CONTRACTOR'S PROFIT 1548
TOTAL COST RS/- 17260.2
- Material, Labour,and Equipment price FOR 100 SQUARE
is change METER and
as per location RS/-time 17260.2
- Material and equiment requirement is as
FORper1 your uses.METER RS/-
SQUARE 172.602
- This is most common Rate Analysis Sheet which is majorly used
construction.
Download More Construction Templates & Excel sheets
15+ Project Management Excel sheets for Construction Download Now
30+ Bar Bending Schedule Advanced Spreadsheets (EXCEL) Download Now
Complete Building Estimation and Quantity-Excel Spreadsheet Download Now
Construction Estimate Template – Project Management Download Now
Quantity & Rate Analysis Excel Sheets for Construction Download Now
Interview Questions and Answer for Civil & Architectural Engineers Download Now

You might also like