RATE ANALY

ITEM NAME : SAND FILLING IN F


(B) Material Cost Analysis

SR.NO MATERIAL QUANTITY

1 SAND 10 CUBIC METER


2 SUNDRIES -
3
4
5
T

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 MALE COOLIE 1
2 FEMALE COOLIE 1
3 BHISTI 0.5
4 SUNDRIES -

(B) Equipment Cost Analysis


SR.NO Equipment Name

1 -
2 -
3 -
TOTAL COST

NOTES
- Sand Price is change as per location and time
- Material and equiment requirement is as per your wish.
- This is most common Rate Analysis Sheet which is majorly used for sand
filling in foundation.
RATE ANALYSIS SHEET
ITEM NAME : SAND FILLING IN FOUNDATION COST ANALYSIS

RATE PER AMOUNT


RS/- RS/-
800 CUBIC METER 8000
- - 50

TOTAL COST RS/- 8050

RATE PER AMOUNT


RS/- RS/-

200 Day 200


180 Day 180
200 100
- - 50

Total Cost 530

(A) MATERIAL COST 8050


HIRE CHARGES (B) LABOUR COST 530
e
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 8580
TOTAL COST 0 2 1.5% WATER CHARGE 128.7
3 10% CONTRACTOR'S PROFIT 858
TOTAL COST RS/- 9566.7
FOR 10 CUBIC METER RS/- 9566.7
our wish. FOR 1 CUBIC METER RS/- 956.67
h is majorly used for sand