COURSED RUBBLE STONE MASONRY IN SUPERS

RATE ANALY
ITEM NAME : BRICK BATS CEMENT CONCR
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY

1 STONE 12.50 m3
2 CEMENT 0.60 m3
3 SAND 3.60 m3
4 SUNDRIES -
5
6
7

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 MISTRI 0.5
2 MASON 16
1 MALE COOLIE 16
2 FEMALE COOLIE 8
3 BHISTI 1.5
4 SUNDRIES -

(B) Equipment Cost Analysis


SR.NO Equipment Name

1 -
2 -
3 -
TOTAL COST

NOTES
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
NE MASONRY IN SUPERSTRUCTURE (1:6) CEMENT SAND

RATE ANALYSIS SHEET


ME : BRICK BATS CEMENT CONCRETE (1:4:8), QUANTITY (10 CUBIC METER)

RATE PER AMOUNT


RS/- RS/-
2500 CUBIC METER 31250
9700 CUBIC METER 5820
1500 CUBIC METER 5400
- - 100

TOTAL COST RS/- 42570

RATE PER AMOUNT


RS/- RS/-
425 Day 212.5
400 Day 6400
250 Day 4000
230 Day 1840
230 Day 345
- - 100

Total Cost 12897.5

(A) MATERIAL COST 42570


HIRE CHARGES (B) LABOUR COST 12897.5
e
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 55467.5
TOTAL COST 0 2 1.5% WATER CHARGE 832.0125
3 10% CONTRACTOR'S PROFIT 5546.75
TOTAL COST RS/- 61846.26
e as per location and time FOR 10 CUBIC METER RS/- 61846.26
our uses. FOR 1 CUBIC METER RS/- 6184.626