序号 管线名称 计/实际完成时 备注
间
1 Chilled water network
2 Potable water network 2023/5/26
3 Sewage water network 2023/5/19
4 TSE 2023/5/26
5 ICT
6 MV cable
管网名称 管道材质 管道口径 Pathway1A Pathway 1B Pathway2 Pathway3 Pathway4
Chember/manhole数量
TSE 250
TSE 200
TSE 180
TSE 160
TSE 140
TSE 110
TSE 80
TSE 75
Chember/manhole数量
Utility Corridor 3/Utility Utility Corridor 3/Utility
Pathway1A-
compound pathway(西侧 compound pathway(东侧靠近 branch1
段) 大桥段)
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage- Pressurised DN110 543 892 995 290 453 3173
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage- Pressurised DN125 543 543
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage- Pressurised DN140 540 500 1040
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage- Pressurised DN180 608 608
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage- Pressurised DN200 694 694
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage-Gravity DN200 1100 1000 800 1400 200 4500
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage-Gravity DN250 0
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Sewage-Gravity DN300 200 200
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 (Shura Bridge) DN350 0
Manholes 4 22 20 16 28 0 4 94
R13-I10B01-IDM-04-GNKXX-DWG-UT-10301 Pathway total 740 2686 1892 1795 1690 0 1955 10758
Due to the change of IP12C, the design has not been MV Cable 110KV
determined, and the layout has not been issued
MV Cable 33KV 0
MV Cable 0
MV Cable 0
MV Cable 0
Manholes 0
Pathway total 0 0 0 0 0 0 0 0
6-Aug-23
340
251
170
356
910
110
400
421
11000
1524
35332
Excavation Pipe laying Joint Testing Backfilling Chambers
25 CW 15% 15% 25% 30% 15%
Excavation Pipe Laying+joint Testing Backfilling Chambers
20 SW 25% 20% 10% 15% 30%
Excavation Pipe Laying Testing Backfilling Chambers
12 PW 30% 35% 10% 15% 10%
Excavation Pipe Laying Testing Backfilling Chambers Excavation EX
12 TSE 30% 35% 10% 15% 10%
Excavation Cable Laying Cable Testing Backfilling Material DeliverMD
21 MV 25% 50% 10% 15%
Excavation Duct Laying Backfilling Chambers Pipe laying PL
Total Networks 10 ICT 35% 40% 15% 10%
Hydro test HT
Backfilling BF
Manhole installaMH
Plan Actual
Excavation Pipe Laying Testing Backfilling Chambers/ Excavation Pipe Laying
% Progress
(Lm) (Lm) (Lm) (Lm) Valves (Nos) (Lm) (Lm)
CW Total 19,450 19,450 19,450 19,450 40
CW Cumu.Planned 17,500 13,965 8,363 8,463 25
25 Chilled Water
CW Cumu.Actual 12,821 12,000 10,670 8,300 0
CW Plan % 90% 72% 43% 44% 63% 66% 62%
SW Total 10,758 10,759 10,758 10,758 93
SW Cumu.Planned 10,388 8,522 5,425 5,772 55
20 Sewer
SW Cumu.Actual 3,535 2,497 1,183 1,418 0
SW Plan % 97% 79% 50% 54% 59% 33% 23%
PW Total 12,464 12,464 12,464 12,464 23
PW Cumu.Planned 3,410 2,836 2,220 2,046 9
12 Potable Water
PW Cumu.Actual 1,244 674 0 0 0
Total PW Plan % 27% 23% 18% 16% 37% 10% 5%
TSE Total 12,464 12,464 12,464 12,464 23
TSE Cumu.Planned 3,410 2,836 2,220 2,046 9
12 TSE
TSE Cumu.Actual 3,020 2,417 870 1,820 0
TSE Plan % 27% 23% 18% 16% 37% 24% 19%
MV Total 27,970 27,970 27,970 27,970 27,970
MV Cumu.Planned 24,460 22,610 20,610 22,310 19,600
21 MV Power
MV Cumu.Actual 0 0 0 0 0
MV Plan % 87% 81% 74% 80% 70% 0% 0%
ICT Total 1,935 1,935 0 1,935 16
ICT Cumu.Planned 0 0 0 0 0
10 ICT
ICT Cumu.Actual 0 0 0 0 0
ICT Plan % 0% 0% 0% 0% 0% 0% 0%
Excavation Pipe Laying Testing Backfilling Chambers/ Planned Planned
Pathway Name Loc Utility Quantity % Progress
(Lm) (Lm) (Lm) (Lm) Valves (Nos) Start Finish
P4/P7 PW Cumu.Planned 0 0 0 0 0 0%
Potable Water
P4/P7 PW Cumu.Actual 130 130 0 0 0 Actual
P8 PW Cumu.Planned 0 0 0 0 0 0%
Potable Water
P8 PW Cumu.Actual 80 0 0 0 0 Actual
P8 PW Variance 80 0 0 0 0 0%
Pathway2 B
P8 TSE Total 950 950 950 950 1 Plan
P8 TSE Cumu.Planned 0 0 0 0 0 0%
TSE
P8 TSE Cumu.Actual 0 0 0 0 0 Actual
P8 TSE Variance 0 0 0 0 0 0%
P4/P6/P7 PW Cumu.Planned 0 0 0 0 0 0%
Potable Water
P4/P6/P7 PW Cumu.Actual 370 170 0 0 0 Actual
P6 PW Cumu.Planned 0 0 0 0 0 0%
Potable Water
P6 PW Cumu.Actual 60 110 0 0 0 Actual
P6 PW Variance 60 110 0 0 0 4%
Pathway4
P6 TSE Total 1,534 1,534 1,534 1,534 1 Plan
P6 TSE Cumu.Planned 0 0 0 0 0 0%
TSE
P6 TSE Cumu.Actual 60 60 0 0 0 Actual
P6 TSE Variance 60 60 0 0 0 3%
P6 MV Cumu.Planned 1,200 0 0 0 0 0%
MV Power
P6 MV Cumu.Actual 0 0 0 0 0 Actual
P6 MV Variance -1,200 0 0 0 0 0%
P6 CW Cumu.Planned 500 0 0 0 0 5%
Chilled Water
P6 CW Cumu.Actual 1,400 1,400 1,400 1,400 0 Actual
P6 SW Cumu.Planned 0 0 0 0 0 0%
Sewer
P6 SW Cumu.Actual 0 0 0 0 0 Actual
P6 SW Variance 0 0 0 0 0 0%
P6 PW Cumu.Planned 0 0 0 0 0 0%
Potable Water
P6 PW Cumu.Actual 0 0 0 0 0 Actual
P6 PW Variance 0 0 0 0 0 0%
UC3
P6 TSE Total 2,080 2,080 2,080 2,080 5 Plan
P6 TSE Cumu.Planned 0 0 0 0 0 0%
TSE
P6 TSE Cumu.Actual 0 0 0 0 0 Actual
P6 TSE Variance 0 0 0 0 0 0%
P6 MV Total 0 0 0 0 0 Plan
P6 MV Cumu.Planned 0 0 0 0 0 0%
MV Power
P6 MV Cumu.Actual 0 0 0 0 0 Actual
P6 MV Variance 0 0 0 0 0 0%
P4 PW Cumu.Planned 250 0 0 0 0 8%
Potable Water
P4 PW Cumu.Actual 250 0 0 0 0 Actual
P4 PW Variance 0 0 0 0 0 8%
UC-PPP
P4 TSE Total 990 990 990 990 1 Plan
P4 TSE Variance 0 0 0 0 0 8%
P4 ICT Cumu.Planned 0 0 0 0 0 0%
ICT
P4 ICT Cumu.Actual 0 0 0 0 0 Actual
P4 ICT Variance 0 0 0 0 0 0%
27 Apr 23
Progress till Plan Actual
19 Oct 23 25% CW 57% 46%
20% SW 71% 16%
12% PW 24% 5%
12% TSE 24% 17%
21% MV 82% 0%
10% ICT 0% 0%
Overall 51% 17%
55% 43% 0%
11% 13% 0%
0% 0% 0%
7% 15% 0%
0% 0% 0%
0% 0% 0%
Actual/ Actual/
Forecast Forecast Remaining Works Mitigation Measures Remarks
Start Finish
Actual/ Actual/
Forecast Forecast Remaining Works Mitigation Measures Remarks
Start Finish
Actual/ Actual/
Forecast Forecast Remaining Works Mitigation Measures Remarks
Start Finish
Actual/ Actual/
Forecast Forecast Remaining Works Mitigation Measures Remarks
Start Finish
Actual/ Actual/
Forecast Forecast Remaining Works Mitigation Measures Remarks
Start Finish
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway1 B EX Plan 3,052.0
Pathway1 B EX Actual 2,000.0
Pathway1 B MD Plan 3052 700 850 850 652
Pathway1 B MD Actual 2,200.0
Pathway1 B PL Plan 3,052.0
Pathway1 B PL Actual 2,000.0 150 312 100 400
Pathway1 B HT Plan 3,052.0
Pathway1 B HT Actual 2,000.0 300 1000 700
Pathway1 B BF Plan 3,052.0
Pathway1 B BF Actual 1,400.0 200 100 300 100
Pathway1 B MH Plan 4.0
Pathway1 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway2 A EX Plan 2,135.0 500 500 635
Pathway2 A EX Actual 1,050.0 100
Pathway2 A MD Plan 2,135.0
Pathway2 A MD Actual 1,524.0
Pathway2 A PL Plan 2,135.0 500 500 500 135
Pathway2 A PL Actual 870.0
Pathway2 A HT Plan 2,135.0 750
Pathway2 A HT Actual 870.0
Pathway2 A BF Plan 2,135.0 500 500 500
Pathway2 A BF Actual 850.0 200 50 300
Pathway2 A MH Plan 6.0 1 1 1 1 2
Pathway2 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway2 B EX Plan 2,135.0
Pathway2 B EX Actual 150.0
Pathway2 B MD Plan 2,135.0
Pathway2 B MD Actual 720.0
Pathway2 B PL Plan 2,135.0
Pathway2 B PL Actual 50.0
Pathway2 B HT Plan 2,135.0
Pathway2 B HT Actual 0.0
Pathway2 B BF Plan 2,135.0
Pathway2 B BF Actual 0.0
Pathway2 B MH Plan 6.0
Pathway2 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway3 A EX Plan 2,450.0 550 650 650 600
Pathway3 A EX Actual 2,004.0
Pathway3 A MD Plan 2,450.0
Pathway3 A MD Actual 2,450.0
Pathway3 A PL Plan 2,450.0 550 650
Pathway3 A PL Actual 1,850.0
Pathway3 A HT Plan 2,450.0
Pathway3 A HT Actual 1,500.0 300 200
Pathway3 A BF Plan 2,450.0
Pathway3 A BF Actual 1,750.0 300 200 250
Pathway3 A MH Plan 6.0 1 1
Pathway3 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway3 B EX Plan 2,100.0
Pathway3 B EX Actual 1,624.0
Pathway3 B MD Plan 2,100.0 500 550
Pathway3 B MD Actual 1,600.0
Pathway3 B PL Plan 2,100.0
Pathway3 B PL Actual 1,426.0
Pathway3 B HT Plan 2,100.0
Pathway3 B HT Actual 1,500.0
Pathway3 B BF Plan 2,100.0
Pathway3 B BF Actual 600.0
Pathway3 B MH Plan 6.0
Pathway3 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway4 EX Plan 3,810.0
Pathway4 EX Actual 2,413.0 200
Pathway4 MD Plan 3,810.0
Pathway4 MD Actual 3,810.0
Pathway4 PL Plan 3,810.0
Pathway4 PL Actual 2,300.0 200 120 25
Pathway4 HT Plan 3,810.0
Pathway4 HT Actual 1,700.0 300
Pathway4 BF Plan 3,810.0
Pathway4 BF Actual 1,500.0 300 100 50 150
Pathway4 MH Plan 7.0
Pathway4 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
UC3 EX Plan 1,490.0
UC3 EX Actual 1,400.0
UC3 MD Plan 1,490.0
UC3 MD Actual 1,490.0
UC3 PL Plan 1,490.0
UC3 PL Actual 1,400.0 200
UC3 HT Plan 1,490.0
UC3 HT Actual 1,400.0 300 300 200 300
UC3 BF Plan 1,490.0
UC3 BF Actual 1,400.0 300 200
UC3 MH Plan 3.0
UC3 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
UCP EX Plan 1,200.0 200 400 400
UCP EX Actual 1,150.0 200
UCP MD Plan 1,200.0 600
UCP MD Actual 1,200.0
UCP PL Plan 1,200.0 150 350
UCP PL Actual 1,104.0 200 100 100
UCP HT Plan 1,200.0
UCP HT Actual 900.0
UCP BF Plan 1,200.0
UCP BF Actual 300.0
UCP MH Plan 1.0
UCP MH Actual 0.0
100
400
178
100
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
700 850 850 652
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
20
750 635
500 135
50 50
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
500 500 500 635
50 100
500 500 500 635
720
500 500 500 500 135
50
750
500 500
1 1 1 1 2
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
50
650 600
100
450 550 550 550 350
1 1 1 1
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
500 550 550 500
20 20 30 50
550 500
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
950 950 950 960
200 100
950 950 950 960
200
500
1 1 1 2
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
500 500 490
100
1
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
200
50
100
350 350
100 30 50 24
300 450 450
900
300 300 300 300
300
1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
750 635
500 635
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
350
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
1 1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
300 290
1 1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24 07 Mar 24 14 Mar 24 21 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway1 A EX Plan 740.0 300 300 140
Pathway1 A EX Actual 270.0
Pathway1 A MD Plan 740.0
Pathway1 A MD Actual 300.0
Pathway1 A PL Plan 740.0 100 160 160 160
Pathway1 A PL Actual 252.0
Pathway1 A HT Plan 740.0
Pathway1 A HT Actual 0.0
Pathway1 A BF Plan 740.0 200
Pathway1 A BF Actual 200.0
Pathway1 A MH Plan 4.0 1 1 1
Pathway1 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway1 B EX Plan 2,686.0
Pathway1 B EX Actual 1,317.0 107
Pathway1 B MD Plan 2,686.0
Pathway1 B MD Actual 1,700.0 200
Pathway1 B PL Plan 2,686.0
Pathway1 B PL Actual 847.0 107
Pathway1 B HT Plan 2,686.0
Pathway1 B HT Actual 370.0
Pathway1 B BF Plan 2,686.0
Pathway1 B BF Actual 370.0
Pathway1 B MH Plan 22.0
Pathway1 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway2 A EX Plan 946.0 300 300
Pathway2 A EX Actual 500.0
Pathway2 A MD Plan 946.0 300 300 346
Pathway2 MD Actual 0.0
Pathway2 A PL Plan 946.0 300
Pathway2 A PL Actual 0.0
Pathway2 A HT Plan 946.0
Pathway2 A HT Actual 0.0
Pathway2 A BF Plan 946.0
Pathway2 A BF Actual 0.0
Pathway2 A MH Plan 9.0 1.5
Pathway2 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway2 B EX Plan 946.0
Pathway2 B EX Actual 0.0
Pathway2 B MD Plan 946.0
Pathway2 MD Actual 0.0
Pathway2 B PL Plan 946.0
Pathway2 B PL Actual 0.0
Pathway2 B HT Plan 946.0
Pathway2 B HT Actual 0.0
Pathway2 B BF Plan 946.0
Pathway2 B BF Actual 0.0
Pathway2 B MH Plan 10.0
Pathway2 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway3 A EX Plan 897.5 147.5
Pathway3 A EX Actual 848.0
Pathway3 A MD Plan 897.5 247.5
Pathway3 A MD Actual 850.0
Pathway3 A PL Plan 897.5
Pathway3 A PL Actual 848.0
Pathway3 A HT Plan 897.5
Pathway3 A HT Actual 813.0
Pathway3 A BF Plan 897.5
Pathway3 A BF Actual 848.0
Pathway3 A MH Plan 8.0
Pathway3 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway3 B EX Plan 897.5
Pathway3 B EX Actual 340.0 80 80
Pathway3 B MD Plan 897.5
Pathway2 MD Actual 380.0
Pathway3 B PL Plan 897.5
Pathway3 B PL Actual 340.0 80 80
Pathway3 B HT Plan 897.5
Pathway3 B HT Actual 0.0
Pathway3 B BF Plan 897.5
Pathway3 B BF Actual 0.0
Pathway3 B MH Plan 8.0
Pathway3 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
Pathway4 EX Plan 1,690.0
Pathway4 EX Actual 60.0
Pathway4 MD Plan 1,690.0
Pathway2 MD Actual 100.0 100
Pathway4 PL Plan 1,690.0
Pathway4 PL Actual 60.0
Pathway4 HT Plan 1,690.0
Pathway4 HT Actual 0.0
Pathway4 BF Plan 1,690.0
Pathway4 BF Actual 0.0
Pathway4 MH Plan 28.0
Pathway4 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
UC3 EX Plan 0.0
UC3 EX Actual 0.0
PathwayUC3 MD Plan 0.0
PathwayUC3 MD Actual 0.0
UC3 PL Plan 0.0
UC3 PL Actual 0.0
UC3 HT Plan 0.0
UC3 HT Actual 0.0
UC3 BF Plan 0.0
UC3 BF Actual 0.0
UC3 MH Plan 0.0
UC3 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
UCP EX Plan 1,955.0
UCP EX Actual 200.0
Pathway UCP MD Plan 1,955.0 700
Pathway UCP MD Actual 300.0
UCP PL Plan 1,955.0
UCP PL Actual 150.0
UCP HT Plan 1,955.0
UCP HT Actual 0.0
UCP BF Plan 1,955.0
UCP BF Actual 0.0
UCP MH Plan 4.0
UCP MH Actual 0.0
270
300
160
252
250 250 240
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
511 725 725 725
80 400 60 370 300
900 900 886
400 300 400 400
486 600 600 600 400
80 130 60 320 100 50
370
486
300 70
4 4 4 4
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 14 Dec 23
346
300 346
446 500
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
250 250 250 196
200
1.5
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
200 200 200 150
238 150 300
325 325
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
197.5 250 250 200
100 80
300 300 297.5
1 1
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
280 560
60
600 600 490
60
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
300 600 600 455
200
700 555
300
500 500 500 455
150
650 650
1 1 1 0.5 0.5
1025 880 900 900 1186 300 597.5 900 946 490
3658.5 4538.5 5438.5 6338.5 7524.5 7824.5 8422 9322 10268 10758
34.0% 42.2% 50.6% 58.9% 69.9% 72.7% 78.3% 86.7% 95.4% 100.0%
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
3 3
21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24
500
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
200 200
2 2 1 1
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
480 370
800 890
4 5 5 5 5 4
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23
655
405
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24 22 Feb 24 29 Feb 24
07 Mar 24 14 Mar 24 21 Mar 24 28 Mar 24
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway1 B EX Plan 2,486.0
Pathway1 B EX Actual 130.0
Pathway1 B MD Plan 2,486.0
Pathway1 B MD Actual 130.0
Pathway1 B PL Plan 2,486.0
Pathway1 B PL Actual 130.0
Pathway1 B HT Plan 2,486.0
Pathway1 B HT Actual 0.0
Pathway1 B BF Plan 2,486.0
Pathway1 B BF Actual 0.0
Pathway1 B MH Plan 4.0
Pathway1 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway2 A EX Plan 950.0
Pathway2 A EX Actual 80.0
Pathway2 A MD Plan 950.0
Pathway2 A MD Actual 100.0
Pathway2 A PL Plan 950.0
Pathway2 A PL Actual 0.0
Pathway2 A HT Plan 950.0
Pathway2 A HT Actual 0.0
Pathway2 A BF Plan 950.0
Pathway2 A BF Actual 0.0
Pathway2 A MH Plan 1.0
Pathway2 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway2 B EX Plan 950.0
Pathway2 B EX Actual 80.0
Pathway2 B MD Plan 950.0
Pathway2 B MD Actual 100.0
Pathway2 B PL Plan 950.0
Pathway2 B PL Actual 0.0
Pathway2 B HT Plan 950.0
Pathway2 B HT Actual 0.0
Pathway2 B BF Plan 950.0
Pathway2 B BF Actual 0.0
Pathway2 B MH Plan 1.0
Pathway2 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway3 A EX Plan 1,264.0
Pathway3 A EX Actual 274.0 150 100
Pathway3 A MD Plan 1,264.0
Pathway3 A MD Actual 300.0
Pathway3 A PL Plan 1,264.0
Pathway3 A PL Actual 264.0 140 100
Pathway3 A HT Plan 1,264.0
Pathway3 A HT Actual 0.0
Pathway3 A BF Plan 1,264.0
Pathway3 A BF Actual 0.0
Pathway3 A MH Plan 2.0
Pathway3 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway3 B EX Plan 1,264.0
Pathway3 B EX Actual 370.0 260 110
Pathway3 B MD Plan 1,214.0
Pathway3 B MD Actual 500.0 300 200
Pathway3 B PL Plan 1,264.0
Pathway3 B PL Actual 170.0 60 110
Pathway3 B HT Plan 1,264.0
Pathway3 B HT Actual 0.0
Pathway3 B BF Plan 1,264.0
Pathway3 B BF Actual 0.0
Pathway3 B MH Plan 2.0
Pathway3 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
Pathway4 EX Plan 1,533.7
Pathway4 EX Actual 60.0 60
Pathway4 MD Plan 1,533.7
Pathway4 MD Actual 130.0 70
Pathway4 PL Plan 1,533.7
Pathway4 PL Actual 110.0 60
Pathway4 HT Plan 1,533.7
Pathway4 HT Actual 0.0
Pathway4 BF Plan 1,533.7
Pathway4 BF Actual 0.0
Pathway4 MH Plan 1.0
Pathway4 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
UC3 EX Plan 2,080.1
UC3 EX Actual 0.0
UC3 MD Plan 2,080.1
UC3 MD Actual 0.0
UC3 PL Plan 2,080.1
UC3 PL Actual 0.0
UC3 HT Plan 2,080.1
UC3 HT Actual 0.0
UC3 BF Plan 2,080.1
UC3 BF Actual 0.0
UC3 MH Plan 5.0
UC3 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23
UCP EX Plan 990.0
UCP EX Actual 250.0
UCP MD Plan 990.0
UCP MD Actual 0.0
UCP PL Plan 990.0
UCP PL Actual 0.0
UCP HT Plan 990.0
UCP HT Actual 0.0
UCP BF Plan 990.0
UCP BF Actual 0.0
UCP MH Plan 1.0
UCP MH Actual 0.0
1 2 2 1
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
130
1000 1486
130
130
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
210 320 320 100
400 550
0.5 0.5
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
630 634
630 634
0.5 1 0.5
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
564
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
50
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23
250 300 300
250
400 590
300 300
0.5
10.8% 15.3% 15.3% 20.3% 25.5% 28.7% 33.4% 33.4% 41.5% 58.0%
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
786 850 850
1 1 1 1
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
50 320 320 260
400 550
0.5 0.5
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
314
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
450 450 364
650
0.5 0.5 1
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
600 600 333.7
700 833.7
0.5 0.5
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
600 780.1 700
1000 1080.1
850
700
1 2 1 1
09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24
140
390
440 550
0.5
850 380.1
780.1 600
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
21 Mar 24 28 Mar 24
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway1 A EX Plan 946.0 200 280
Pathway1 A EX Actual 850.0
Pathway1 A MD Plan 946.0 446 500
Pathway1 A MD Actual 1,000.0
Pathway1 A PL Plan 946.0 226
Pathway1 A PL Actual 800.0
Pathway1 A HT Plan 946.0
Pathway1 A HT Actual 0.0
Pathway1 A BF Plan 946.0
Pathway1 A BF Actual 800.0
Pathway1 A MH Plan 6.0
Pathway1 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway1 B EX Plan 2,486.0
Pathway1 B EX Actual 710.0 180
Pathway1 B MD Plan 2,486.0
Pathway1 B MD Actual 900.0
Pathway1 B PL Plan 2,486.0
Pathway1 B PL Actual 407.0 107 70
Pathway1 B HT Plan 2,486.0
Pathway1 B HT Actual 0.0
Pathway1 B BF Plan 2,486.0
Pathway1 B BF Actual 200.0
Pathway1 B MH Plan 4.0
Pathway1 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway2 A EX Plan 950.0
Pathway2 A EX Actual 0.0
Pathway2 A MD Plan 950.0 400
Pathway2 A MD Actual 0.0
Pathway2 A PL Plan 950.0
Pathway2 A PL Actual 0.0
Pathway2 A HT Plan 950.0
Pathway2 A HT Actual 0.0
Pathway2 A BF Plan 950.0
Pathway2 A BF Actual 0.0
Pathway2 A MH Plan 1.0
Pathway2 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway2 B EX Plan 950.0
Pathway2 B EX Actual 0.0
Pathway2 B MD Plan 950.0
Pathway2 B MD Actual 0.0
Pathway2 B PL Plan 950.0
Pathway2 B PL Actual 0.0
Pathway2 B HT Plan 950.0
Pathway2 B HT Actual 0.0
Pathway2 B BF Plan 950.0
Pathway2 B BF Actual 0.0
Pathway2 B MH Plan 1.0
Pathway2 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway3 A EX Plan 1,264.0
Pathway3 A EX Actual 820.0 240 60
Pathway3 A MD Plan 1,264.0
Pathway3 A MD Actual 900.0
Pathway3 A PL Plan 1,264.0
Pathway3 A PL Actual 820.0 240 60
Pathway3 A HT Plan 1,264.0
Pathway3 A HT Actual 870.0
Pathway3 A BF Plan 1,264.0
Pathway3 A BF Actual 820.0
Pathway3 A MH Plan 2.0
Pathway3 A MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway3 B EX Plan 1,264.0
Pathway3 B EX Actual 330.0 100 80
Pathway3 B MD Plan 1,214.0
Pathway3 B MD Actual 330.0
Pathway3 B PL Plan 1,264.0
Pathway3 B PL Actual 330.0 100 80
Pathway3 B HT Plan 1,264.0
Pathway3 B HT Actual 0.0
Pathway3 B BF Plan 1,264.0
Pathway3 B BF Actual 0.0
Pathway3 B MH Plan 2.0
Pathway3 B MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
Pathway4 EX Plan 1,533.7
Pathway4 EX Actual 60.0 60
Pathway4 MD Plan 1,533.7
Pathway4 MD Actual 60.0
Pathway4 PL Plan 1,533.7
Pathway4 PL Actual 60.0 60
Pathway4 HT Plan 1,533.7
Pathway4 HT Actual 0.0
Pathway4 BF Plan 1,533.7
Pathway4 BF Actual 0.0
Pathway4 MH Plan 1.0
Pathway4 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
UC3 EX Plan 2,080.1
UC3 EX Actual 0.0
UC3 MD Plan 2,080.1
UC3 MD Actual 0.0
UC3 PL Plan 2,080.1
UC3 PL Actual 0.0
UC3 HT Plan 2,080.1
UC3 HT Actual 0.0
UC3 BF Plan 2,080.1
UC3 BF Actual 0.0
UC3 MH Plan 5.0
UC3 MH Actual 0.0
Pathway Name Activity Metrics Total Qty. 03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23
UC-PPP EX Plan 990.0
UC-PPP EX Actual 250.0
UC-PPP MD Plan 990.0
UC-PPP MD Actual 0.0
UC-PPP PL Plan 990.0
UC-PPP PL Actual 0.0
UC-PPP HT Plan 990.0
UC-PPP HT Actual 0.0
UC-PPP BF Plan 990.0
UC-PPP BF Actual 0.0
UC-PPP MH Plan 1.0
UC-PPP MH Actual 0.0
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
786
130 400
1000 1486
200 400 300
400
130 100
200
1
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
210 320 320 100
550
0.5 0.5
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
630 634
70 150 100
600 664
300
300 320 320 324
70 290
324 470 470
240 130 100 250 150
150 400 400 314
240 130 100 200 150
0.5 1 0.5
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
564 650
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23
250 300 300 140
250
400 590
440
250
0.5 0.5
Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
850 850
1 1 1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
50 320 320 260
400 550
0.5 0.5
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
450 450 364
0.5 0.5 1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
600 600 333.7
700 833.7
0.5 0.5
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
600 780.1 700
1000 1080.1
850 850
700 780.1
1 2 1 1
16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24
550
380.1
600
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
28 Mar 24
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway1 A EX Actual 0
Pathway1 A MD Plan 5,700 500 2000
Pathway1 A MD Actual 0
Pathway1 A CL Plan 5,700 500
Pathway1 A CL Actual 0
Pathway1 A CT Plan 5,700
Pathway1 A CT Actual 0
Pathway1 A Duct & HHI Plan 5,700
Pathway1 A Duct & HHI Actual 0
Pathway1 A Backfilling Plan 5,700
Pathway1 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway Name Activity Metrics Total Qty. 20 Aug 21 27 Aug 21 03 Sep 21 10 Sep 21
Pathway2 A EX Plan 2,430
Pathway2 A EX Actual 0
Pathway2 A MD Plan 2,430
Pathway2 A MD Actual 0
Pathway2 A CL Plan 2,430
Pathway2 A CL Actual 0
Pathway2 A CT Plan 2,430
Pathway2 A CT Actual 0
Pathway2 A Duct & HHI Plan 2,430
Pathway2 A Duct & HHI Actual 0
Pathway2 A Backfilling Plan 2,430
Pathway2 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway2 B EX Plan 1,200
Pathway2 B EX Actual 0
Pathway2 B MD Plan 1,200
Pathway2 B MD Actual 0
Pathway2 B CL Plan 1,200
Pathway2 B CL Actual 0
Pathway2 B CT Plan 1,200
Pathway2 B CT Actual 0
Pathway2 B Duct & HHI Plan 1,200
Pathway2 B Duct & HHI Actual 0
Pathway2 B Backfilling Plan 1,200
Pathway2 B Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway3 A EX Plan 5,710
Pathway3 A EX Actual 0
Pathway3 A MD Plan 5,710
Pathway3 A MD Actual 0
Pathway3 A CL Plan 5,710
Pathway3 A CL Actual 0
Pathway3 A CT Plan 5,710
Pathway3 A CT Actual 0
Pathway3 A Duct & HHI Plan 5,710
Pathway3 A Duct & HHI Actual 0
Pathway3 A Backfilling Plan 5,710
Pathway3 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway3 B EX Plan 2,750
Pathway3 B EX Actual 0
Pathway3 B MD Plan 2,750
Pathway3 B MD Actual 0
Pathway3 B CL Plan 2,750
Pathway3 B CL Actual 0
Pathway3 B CT Plan 2,750
Pathway3 B CT Actual 0
Pathway3 B Duct & HHI Plan 2,750
Pathway3 B Duct & HHI Actual 0
Pathway3 B Backfilling Plan 2,750
Pathway3 B Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
Pathway4 EX Actual 0
Pathway4 MD Plan 4,310
Pathway4 MD Actual 0
Pathway4 CL Plan 4,310
Pathway4 CL Actual 0
Pathway4 CT Plan 4,310
Pathway4 CT Actual 0
Pathway4 Duct & HHI Plan 4,310
Pathway4 Duct & HHI Actual 0
Pathway4 Backfilling Plan 4,310
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
UC3 EX Plan 0
UC3 EX Actual 0
UC3 MD Plan 0
UC3 MD Actual 0
UC3 CL Plan 0
UC3 CL Actual 0
UC3 CT Plan 0
UC3 CT Actual 0
UC3 Duct & HHI Plan 0
UC3 Duct & HHI Actual 0
UC3 Backfilling Plan 0
UC3 Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23
UC-PPP EX Plan 2,260
UC-PPP EX Actual 0
UC-PPP MD Plan 2,260
UC-PPP MD Actual 0
UC-PPP CL Plan 2,260
UC-PPP CL Actual 0
UC-PPP CT Plan 2,260
UC-PPP CT Actual 0
UC-PPP Duct & HHI Plan 2,260
UC-PPP Duct & HHI Actual 0
UC-PPP Backfilling Plan 2,260
UC-PPP Backfilling Actual 0
2700 800
2000 1200
2500 3200
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
1400 2210
800 1410
500
800 1200
17 Sep 21 24 Sep 21 01 Oct 21 08 Oct 21 15 Oct 21 22 Oct 21 29 Oct 21 05 Nov 21 12 Nov 21 19 Nov 21
400 800 1230
800 1630
100
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
1500 2500 1710
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
600 800
600 900
600
400
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
03 Aug 23 10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23
500 960 800
660 800
2600 2000 2630 1910 2500 700 1260 800 2100 2310
5100 7100 9730 11640 14140 14840 16100 16900 19000 21310
18.2% 25.4% 34.8% 41.6% 50.6% 53.1% 57.6% 60.4% 67.9% 76.2%
12 Oct 23 19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23
1400
1200 410
400 700
1250
800
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
21 Jan 22 28 Jan 22 04 Feb 22 11 Feb 22 18 Feb 22 25 Feb 22 04 Mar 22 11 Mar 22 18 Mar 22 25 Mar 22
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
07 Dec 23 14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24
15 Feb 24 22 Feb 24 29 Feb 24 07 Mar 24 14 Mar 24 21 Mar 24 28 Mar 24
Pathway1 A EX Plan 0
Pathway1 A EX Actual 0
Pathway1 A MD Plan 0
Pathway1 A MD Actual 0
Pathway1 A PL Plan 0
Pathway1 A PL Actual 0
Pathway1 A BK Plan 0
Pathway1 A BK Actual 0
Pathway1 A MH Plan 0
Pathway1 A MH Actual 0
Pathway1 A Backfilling Plan 0
Pathway1 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
Pathway1 B EX Plan 0
Pathway1 B EX Actual 0
Pathway1 B MD Plan 0
Pathway1 B MD Actual 0
Pathway1 B PL Plan 0
Pathway1 B PL Actual 0
Pathway1 B BK Plan 0
Pathway1 B BK Actual 0
Pathway1 B MH Plan 0
Pathway1 B MH Actual 0
Pathway1 B Backfilling Plan 0
Pathway1 B Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 18 Jun 21 25 Jun 21 02 Jul 21 09 Jul 21
Pathway2 A EX Plan 0
Pathway2 A EX Actual 0
Pathway2 A MD Plan 0
Pathway2 A MD Actual 0
Pathway2 A PL Plan 0
Pathway2 A PL Actual 0
Pathway2 A BK Plan 0
Pathway2 A BK Actual 0
Pathway2 A MH Plan 0
Pathway2 A MH Actual 0
Pathway2 A Backfilling Plan 0
Pathway2 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
Pathway2 B EX Plan 0
Pathway2 B EX Actual 0
Pathway2 B MD Plan 0
Pathway2 B MD Actual 0
Pathway2 B PL Plan 0
Pathway2 B PL Actual 0
Pathway2 B BK Plan 0
Pathway2 B BK Actual 0
Pathway2 B MH Plan 0
Pathway2 B MH Actual 0
Pathway2 B Backfilling Plan 0
Pathway2 B Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
Pathway3 A EX Plan 0
Pathway3 A EX Actual 0
Pathway3 A MD Plan 0
Pathway3 A MD Actual 0
Pathway3 A PL Plan 0
Pathway3 A PL Actual 0
Pathway3 A BK Plan 0
Pathway3 A BK Actual 0
Pathway3 A MH Plan 0
Pathway3 A MH Actual 0
Pathway3 A Backfilling Plan 0
Pathway3 A Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
Pathway3 B EX Plan 0
Pathway3 B EX Actual 0
Pathway3 B MD Plan 0
Pathway3 B MD Actual 0
Pathway3 B PL Plan 0
Pathway3 B PL Actual 0
Pathway3 B BK Plan 0
Pathway3 B BK Actual 0
Pathway3 B MH Plan 0
Pathway3 B MH Actual 0
Pathway3 B Backfilling Plan 0
Pathway3 B Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
Pathway4 EX Plan 0
Pathway4 EX Actual 0
Pathway4 MD Plan 0
Pathway4 MD Actual 0
Pathway4 PL Plan 0
Pathway4 PL Actual 0
Pathway4 BK Plan 0
Pathway4 BK Actual 0
Pathway4 MH Plan 0
Pathway4 MH Actual 0
Pathway4 Backfilling Plan 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
UC3 EX Plan 0
UC3 EX Actual 0
UC3 MD Plan 0
UC3 MD Actual 0
UC3 PL Plan 0
UC3 PL Actual 0
UC3 BK Plan 0
UC3 BK Actual 0
UC3 MH Plan 0
UC3 MH Actual 0
UC3 Backfilling Plan 0
UC3 Backfilling Actual 0
Pathway Name Activity Metrics Total Qty. 04 May 23 11 May 23 18 May 23 25 May 23
UC-PPP EX Plan 1,935
UC-PPP EX Actual 0
UC-PPP MD Plan 1,935
UC-PPP MD Actual 0
UC-PPP PL Plan 1,935
UC-PPP PL Actual 0
UC-PPP BK Plan 1,935
UC-PPP BK Actual 0
UC-PPP MH Plan 16
UC-PPP MH Actual 0
UC-PPP Backfilling Plan 0
UC-PPP Backfilling Actual 0
total 0 0 0
0 0
Plan %
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
16 Jul 21 23 Jul 21 30 Jul 21 06 Aug 21 13 Aug 21 20 Aug 21 27 Aug 21 03 Sep 21 10 Sep 21 17 Sep 21
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
01 Jun 23 08 Jun 23 15 Jun 23 22 Jun 23 29 Jun 23 06 Jul 23 13 Jul 23 20 Jul 23 27 Jul 23 03 Aug 23
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
24 Sep 21 01 Oct 21 08 Oct 21 15 Oct 21 22 Oct 21 29 Oct 21 05 Nov 21 12 Nov 21 19 Nov 21 26 Nov 21
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
10 Aug 23 17 Aug 23 24 Aug 23 31 Aug 23 07 Sep 23 14 Sep 23 21 Sep 23 28 Sep 23 05 Oct 23 12 Oct 23
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
19 Oct 23 26 Oct 23 02 Nov 23 09 Nov 23 16 Nov 23 23 Nov 23 30 Nov 23 07 Dec 23
2 3 2 4 4
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
28 Jan 22 04 Feb 22 11 Feb 22 18 Feb 22 25 Feb 22 04 Mar 22 11 Mar 22 18 Mar 22 25 Mar 22 01 Apr 22
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
14 Dec 23 21 Dec 23 28 Dec 23 04 Jan 24 11 Jan 24 18 Jan 24 25 Jan 24 01 Feb 24 08 Feb 24 15 Feb 24
185
185
185
0
1935
100.0%
22 Feb 24 29 Feb 24 07 Mar 24 14 Mar 24 21 Mar 24 28 Mar 24
CW 25.00%
SW 20.00%
PW 12.00%
TSE 12.00%
ICT 10.00%
MV 21.00%
100%
Excavation
Excavation Pipe LayingTesting Backfilling Chambers 35%
30% 30% 5% 10% 25% 100%