Directory WBS Abbr.

Report caption

DS01 Excavation and surpport


DS Downstream surge
DS02 Surge shaft

Upstream surge US01 Excavation and surpport


US
US02 Surge shaft

HT01 Wet Tunnels – Drill & Blast - Report


HT Headrace tunnel
HT02 HT02-TT02 - Wet tunnels - Segmental lining

TT01
TT Trailrace tunnel
TT02

PT01
PT penstock
PT02 New manifold-Option study, Feasibility

IT inclined pressure tunnel IT01 SECONDARY LINING

DR01
DR Drainage tunnel
DR02 Drainage tunnel-Report

Frost resistance simulation

Carbonation simulation

Sulfate simulation

Environmental data
Person in charge Report address Drawing address

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DS-downstream P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DS-downstream


surge\DS01\S2-CIV-SS-TSS-REP-2101_B.pdf surge\DS01\S2-CIV-SS-TSS-DRG-2101_C.pdf
Forood
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DS-downstream P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DS-downstream
surge\DS02\S2-CIV-SS-TSS-REP-2301_C.pdf surge\DS02\S2-CIV-SS-TSS-DRG-2301_C.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\US-upstream P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\US-upstream


surge\US01\S2-CIV-SS-HSS-REP-2101_B.pdf surge\US01\S2-CIV-SS-HSS-DRG-2101_C.pdf
Forood
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\US-upstream P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\US-upstream
surge\US02\S2-CIV-SS-HSS-REP-2301_C.pdf surge\US02\S2-CIV-SS-HSS-DRG-2301_C.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\HT-headrace P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\HT-headrace


tunnel\HT01\S2-CIV-HT-HTU-REP-2101_C.pdf tunnel\HT01\S2-CIV-HT-HTU-DRG-2100_C.pdf
Iacopo
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\HT-headrace P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\HT-headrace
tunnel\HT02\S2-CIV-HT-HTU-REP-2201_C.pdf tunnel\HT02\S2-CIV-HT-HTU-DRG-2300_C.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\TT-tailrace
tunnel\TT01\S2-CIV-HT-TTU-DRG-2300_A.pdf
Iacopo
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\TT-tailrace
tunnel\TT02\S2-CIV-HT-TTU-DRG-2400_C.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\PT-
penstock\PT01\S2-CIV-PP-UPP-DRG-2100_A.pdf
Iacopo
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\PT- P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\PT-
penstock\PT02\S2-CIV-GN-GEN-REP-0005_new_manifold_option_study_A.2.pdf penstock\PT02\combined.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\IT-inclined P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\IT-inclined pressure


Forood pressure tunnel\IT01\S2-CIV-HT-IPT-REP-2301_C.pdf tunnel\IT01\S2-CIV-HT-IPT-DRG-2300_C.pdf

P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DR-drainage
tunnel\DR01\S2-CIV-AT-DRT-DRG-2200_C.pdf
Iacopo
P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DR-drainage P:\6000\6130.1\4-Elaborati\4.1-Lav\19-WET TUNNEL\FOROOD\DR-drainage
tunnel\DR02\S2-CIV-AT-DRT-REP-1010_A.pdf tunnel\DR02\S2-CIV-AT-DRT-DRG-2100_B.pdf

Forood

Forood

Forood/SIMCO

Iacopo
service Type of
Component Note life expsoure Degradation mechanism
shotcrete for 40 MPa fiber reinforced- above
100 Carbonation-mechanical loss-sulfate-leaching
chamber 35kg/m3 ground
Components in concrete
mass
service Type of
concrete/<7 Component Note life expsoure
50mm
shotcrete for shaft 40 MPa fiber
0.3 m 150 water
excavation reinforced-35kg/m3
Components in concrete
mass Type of
Degradation mechanism concrete/<750mm Component Note service life
expsoure

min 0.05-
leaching-sulfate
0.1m
mass
Type of
Degradation mechanism concrete/<7 Component Note service life
expsoure
50mm
Components in steel
mass
service
Degradation mechanism concrete/<7 Component life
Type of expsoure Component service life
50mm
omponents in steel Environmental analysis
service
Type of expsoure Component life
Type of expsoure Borehole ID