Professional Documents
Culture Documents
Learning objectives:
Page | 2
4. In the GROUND FLOOR – Overall view,
create a revision cloud around ENTRY
1508.
Page | 3
6. Use the Tag by Category tool to tag the
revision cloud.
Page | 4
8. In the Revisions on Sheet dialog, select
the Shown in Revision Schedule
checkbox for Issued for Construction.
Click OK to close the dialog.
Page | 5