You are on page 1of 28

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE X
BUKIDNON 3RD DISTRICT ENGINEERING OFFICE
DICKLUM, MANOLO FORTICH, BUKIDNON

C.Y. 2023 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION OF MULTI-PURPOSE BUILDING
BARANGAY LINDABAN, MANOLO FORTICH BUKIDNON

CHECKED/REVIEWED: SUBMITTED: RECOMMENDED: APPROVED:

MCKENLY B. HONG RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr.
ENGINEER II OIC - PLANNING AND DESIGN SECTION CHIEF ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE: DATE DATE


P E R S P E C T I V E
TABLE OF CONTENTS
ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL ELECTRONICS
A-1 PERSPECTIVE, TABLE OF CONTENTS S-1 STRUCTURAL NOTES P-1 LOCATION MAP E-1 GENERAL NOTES EO-1 LOCATION MAP
A-2 DISTRICT MAP S-2 SPLICING REQUIREMENTS OF REINFORCING BARS "Ls" OR "Ld" PLUMBING SPEC'S LEGEND AND SYMBOLS GROUND FLOOR FIRE ALARM SYSTEM PLAN
VICINITY MAP AND OTHER IMPORTANT NOTES WATERLINE PLUMBING LAYOUT POWER RISER DIAGRAM SECOND FLOOR FIRE ALARM SYSTEM PLAN
LOCATION PLAN S-3 TYPICAL MASONRY ELEVATION W/ LINTEL BEAMS & STIFFINER SANITARY PLUMBING LAYOUT E-2 LOCATION MAP FDAS SYSTEM LAY-OUT PLAN
A-3 LOCATION MAP COLUMNS REFLECTING REINF. STEEL BARS AND LEGENDS GROUND FLOOR LIGHTING LAYOUT FIRE ALARM RISER DIAGRAM
SITE DEVELOPMENT PLAN SECOND FLOOR LIGHTING LAYOUT FIRE ALARM ASSORTED DETAILS
OTHER IMPORTANT NOTES P-2 LOCATION MAP
A-4 GROUND FLOOR PLAN ASSORTED DETAILED DRAWINGS ELECTRICAL LEGEND & SYMBOLS
S-4 FOUNDATION PLAN S-11 RAMP DETAILS PLUMBING SPEC'S
SECOND FLOOR PLAN ELECTRICAL LEGEND & SYMBOLS
ELEVATIONS UPPER BEAM ISOMETRIC VIEW E-3 GROUND FLOOR POWER LAYOUT
FLOOR FINISHES LOWER BEAM LEGENDS SECOND FLOOR POWER LAYOUT
SCHEDULE OF FINISHES S-5 FOUNDATION PLAN P-3 LOCATION MAP GROUNDING DETAILED DRAWINGS
A-5 SECTIONS TYPICAL FOOTING PLAN PLUMBING SPEC'S ELECTRICAL LEGEND & SYMBOLS
SCHEDULE OF DOORS TYPICAL FOOTING SECTION SEPTIC TANK DETAIL, E-4 ELECTRICAL SCHEDULE OF LOADS MECHANICAL
SCHEDULE OF WINDOWS COLUMN SCHEDULE GREASE TRAP DETAIL SINGLE LINE DIAGRAM
SCHEDULE OF FINISHES FOOTING SCHEDULE E-5 ELECTRICAL ANALYSIS M-1 LOCATION MAP
CATCH BASIN DETAIL
A-6 REFLECTED CEILING PLANS ELECTRICAL ASSORTED DETAILED GROUND FLOOR AIR-CONDITION LAYOUT
CEILING DETAILS SECTION
S-6 FOUNDATION PLAN P-TRAP DETAIL
E-6 LIGHTNING PROTECTION SYSTEM PLAN SECOND FLOOR AIR-CONDITION LAYOUT
PERSPECTIVE(CEILING DETAILS) FOOTING TIE BEAM DETAILS AND LAY-OUT ELECTRICAL LEGEND & SYMBOLS
A-7 ROOF PLANS WALL FOOTING DETAILS LIGHTNING ARRESTER DETAILS AIR-CONDITION CALCULATION
ROOF SECTION DETAILS S-7 ROOF FRAMING PLAN
A-8 RAMP PLAN S-8 SECOND FLOOR BEAM PLAN
RAMP SECTION DETAILS
MAIN STAIR PLAN
SCHEDULE OF BEAM
MAIN STAIR SECTION DETAILS BEAM DETAILS
A-9 FIRE ESCAPE STAIR PLAN STEEL DECK FRAMING PLAN
FIRE ESCAPE ELEVATIONS S-9 MAIN STAIRS DETAILS
FIRE ESCAPE DETAILS
FIRE ESCAPE STAIR DETAILS
AUXILLIARY
A-10 BALCONY RAILING DETAILS
PWD/MALE TOILET PLAN DETAILS
S-10 ROOF DETAILS AUX-1 STANDARD PROJECT BILLBOARD
GIRT DETAILS SAFETY SIGNAGES
FASCIA FRAME DETAILS DESIGNED ARCHITECTURAL :
S-10 ROOF DETAILS
GIRT DETAILS JOVEL K. PANGAN
ARCHITECT II
FASCIA FRAME DETAILS DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PERSPECTIVE PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF TABLE OF CONTENTS
DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-1
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D
A
A B C D 3 2 1
2.43 11.50
1.20 1.23 2.50 3.50 5.50 11.50
9.95
4.65 9.50

W5 W4 W2 W2
1.00 1.00 1.00

ROOF APEX LINE ROOF APEX


1

0.92
ROOF APEX LINE ROOF APEX

1.30 0.30
1.60
2% FF-1
PWD/MALE SL +0.40m
2 OP
E
BRGY.

1.51
CR TO

1.44
F.D
1 FF-3
.
PANTRY

E
FF-3
D5
D 3 CAPTAIN
+0.40m
FF-1
OFFICE

N
W2
B 1.90 +0.40m TOP OF ROOF BEAM TOP OF ROOF BEAM
CEILING LINE CEILING LINE

I
D4 EXIT
D2 2.43 F F F F 1.15

L
WAITING

BOUNDARY LINE

BOUNDARY LINE

BOUNDARY LINE
3.00

3.00
7.00

F F F F
2 AREA W1
D6 1 W2 W2 W2 W2 W2

Y
1.00

8.45

8.45
FF-1 SECRETARY
U P
W5 2
+0.40m D 2
FF-1

R
2.30
4.90

3
PEBBLES FF-3
R A M P

1.00
+0.40m
-0.35m 4

6.40

6.40
FEMALE 5
W4 CR D1
6
W2 CEILING LINE

D
FF-4
RECORD CEILING LINE
FF-1 TREASURER IN ALUMINUM FINISH
KEEPER

N
+0.40m
1.20

3.00

3.00
3D LETTER SIGNAGE
IN ALUMINUM FINISH
STORAGE

U
D7 1.20
MINSURO
ADMINISTRATIVE D 1 W2 W2 W2 W2
3 PORCH

O
BUILDING
FF-2 W2 W2 BARANGAY MINDAGAT, MALITBOG, BUKIDNON

0.90
1.88

B
+0.40m

1.82

0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE

0.40
NATURAL GRADE LINE
1 NATURAL GRADE LINE

NATURAL GROUND LINE NATURAL GROUND LINE


2

3.75
2.50 3.50 5.50
11.50
15.00
FRONT ELEVATION RIGHT-SIDE ELEVATION
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.

GROUND FLOOR PLAN


SCALE: 1:100 MTRS. 1 2 3 D C B A

11.50

A B C D 4.65

A ROOF APEX
9.50

ROOF APEX LINE


1.00

1.13 11.50 ROOF APEX ROOF APEX LINE


2.50 3.50 5.50

1.44

1.44
1.25 1.25

E
N
TOP OF ROOF BEAM TOP OF ROOF BEAM

I
W5 W5 W2 W2 W2 CEILING LINE CEILING LINE

1 1.15

L
1.00
1.30 0.60

BOUNDARY LINE

BOUNDARY LINE

BOUNDARY LINE
MALE FEMALE

3.00

3.00
1.60

CR CR
W5 W5

Y
FT-3 FT-3 D 3 W2 W2 W2 1.00

8.45

8.45
-0.05m -0.05m

R
7.34
D6 D6
OFFICE W2
B

1.00

1.00
FT-2

A
FF-1

6.40

6.40
D 3 EXIT
1.90

-0.05m

0.30

0.30
17 DN CEILING LINE

D
16
CEILING LINE
15
7.00

N
3.00

3.00
14
2 13
16
D2 D2 D2 W3

U
15 1
12 D 4 W5
1.20

14 2 W2 W2
11
DN

O
2.30

W5
4.90

13 3
10
12 4
9

0.90
B
11 5
8
CONFERENCE OFFICE

0.40

0.40
10 6 FINISH FLOOR LINE FINISH FLOOR LINE
7 W2

0.40
NATURAL GRADE LINE NATURAL GRADE LINE
6 9 7 FF-1
5
NATURAL GROUND LINE NATURAL GROUND LINE
1.20

4
8 FF-1
3

3 1

W1 W2 W2 W2

LEFT-SIDE ELEVATION REAR ELEVATION


1.88

SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.

3.75
2.50 3.50 2.75 2.75
11.50
15.00

FLOOR FINISH LEGEND:


FF-1 GLAZED 0.60M X 0.60MFLOOR TILES

SECOND FLOOR PLAN FF-2 UNGLAZED 0.60M X 0.60M FLOOR TILES

SCALE: 1:100 MTRS. FF-3 UNGLAZED 0.40M X 0.40M FLOOR TILES DESIGNED ARCHITECTURAL :

FF-4 CONCRETE FLOOR W/ GROOVE


JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SECOND FLOOR PLAN DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING ELEVATIONS
FLOOR FINISHES
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-4
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
SCHEDULE OF FINISHES DATE: DATE: DATE: DATE:
1 2 3 A B C D

11.50
7.00 9.95
4.65
9.50
1.00 1.00 1.00

ROOF APEX ROOF APEX LINE

ROOF APEX ROOF APEX LINE

1.51
1.44

E
SEE TRUSS DETAILS

N
1.20
TOP OF ROOF BEAM TOP OF ROOF BEAM

I
CEILING LINE CEILING LINE

I
1.15

L
BOUNDARY LINE

BOUNDARY LINE
3.00

3.00
CEILING HT. 2.60

Y
W2 W2 D6 D6 W2 W2 W2

Y
1.00

8.45

8.45
R

R
1.00
OFFICE CONFERENCE ROOM OFFICE OFFICE

A
6.40

6.40

A
0.30
CEILING LINE

D
CEILING LINE

N
3.00

3.00
U
CEILING HT. 2.60

U
1.20

D2 D1 D5 D3 W2 W2

O
0.90
B

B
PANTRY WAITING AREA ENTRY WAITING AREA BRGY. CAPTAIN OFFICE

0.40

0.40
FINISH FLOOR LINE FINISH FLOOR LINE

0.40
NATURAL GRADE LINE NATURAL GRADE LINE

NATURAL GROUND LINE NATURAL GROUND LINE

CROSS SECTION(A) LONGITUDINAL SECTION(B)


SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.

2.15
2.00
0.50
1.80 1.80 0.60
F F F F

F F F F

FINISHED FLOOR LINE


SECOND FLOOR LINE

FIXED AND AWNING WINDOW - 1 SET SLIDING GLASS WINDOW - 14 SETS SLIDING GLASS WINDOW - 1 SET AWNING WINDOW - 1 SET

6mm THICK TINTED GLASS 6mm THICK TINTED GLASS 6mm THICK TINTED GLASS 6mm THICK TINTED GLASS
AWNING WINDOW ON POWDERED SLIDING WINDOW ON POWDERED SLIDING WINDOW ON POWDERED SLIDING WINDOW ON POWDERED
COATED ALUMINUM FRAMING COATED ALUMINUM FRAMING COATED ALUMINUM FRAMING COATED ALUMINUM FRAMING

1.80 0.80 0.90 0.90 0.60


0.90 0.90 0.80

0.60

STAINLESS STEEL STAINLESS STEEL


KICKING PLATE KICKING PLATE

FINISHED FLOOR LINE

MAIN DOOR- 1 SET OFFICE- 5 SETS PANTRY/EXIT DOOR - 2 SETS EXIT DOOR(GF) - 1 SET PWD/MALE CR - 1 SET MALE/FEMALE CR - 3 SETS STORAGE - 1 SET
6mm THICK TINTED GLASS HOLLOW CORE FLUSH TYPE
6mm THICK TINTED GLASS SOLID WOOD PANEL SWING DOOR ON SOLID WOOD PANEL SWING DOOR ON SOLID WOOD PANEL SWING DOOR ON FLUSH DOOR ON DOOR JAMB(COATED
DOUBLE SWING DOOR ON
SWING DOOR ON POWDERED SWING DOOR ON
POWDERED COATED ALUMINUM DOOR JAMB(COATED WITH PAINT) DOOR JAMB(COATED WITH PAINT) DOOR JAMB(COATED WITH PAINT) WITH PAINT)
COATED ALUMINUM FRAMING DOOR JAMB(COATED WITH PAINT)
FRAMING

SCHEDULE OF DOORS AND WINDOWS


SCALE: 1:50 MTRS. DESIGNED ARCHITECTURAL :

JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SECTIONS DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING SCHEDULE OF DOORS
AND WINDOWS
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-5
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D

A B C D
11.35 11.35
1.10 1.10 8.80
1.10 1.10 8.80
12MM X 38MM X 5MM X 0.80MM THK,
12MM X 38MM X 5MM X 0.80MM THK, METAL FURRING CHANNEL(CEILING JOIST)
METAL FURRING CHANNEL(CEILING JOIST) AT 1200MM ON CENTER
AT 1200MM ON CENTER (SEE BLOW-UP DETAIL)
(SEE BLOW-UP DETAIL)
1 1

1.45

1.45

2.79
3.35
1.75

1.75
17

16

15
6.85

6.85

6.85

6.85
14
2 13
16
15 1
2
12

U P
14 2
11
DN 13 3

2.10

R A M P
10
12 4

4.00
9
11 5

3.35
3.30

7
10 6
FT-4
6 9 7

4
8

1.25
3

3 1
3

2.35 6.10 2.60 2.35 3.35 5.35


11.35 11.35

NOT TO SCALE

GROUND FLOOR SECOND FLOOR


REFLECTED CEILING PLAN REFLECTED CEILING PLAN
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS. PERPECTIVE(CEILING)
SCALE: NTS

1.20
0.10

A B C D A B C D

4.65 9.95
1.00 2.65 1.00 PREFORMED PRE-PAINTED G.I. GUTTER 8.95 1.00
0.25

0.25
PREFORMED PRE-PAINTED G.I. GUTTER PREFORMED PRE-PAINTED G.I. GUTTER

CEILING VENT(SEE DETAILS)


0.90

0.90
1 1

CEILING VENT(SEE DETAILS)


PRE-PAINTED ROOFING G.I FLASHING
PRE-PAINTED ROOFING G.I FLASHING

17 12MM X 38MM X 5MM X 0.80MM THK, 17

16 METAL FURRING CHANNEL(CEILING JOIST) 16


12MM X 38MM X 5MM X 0.80MM THK,
0.10
15
AT 1200MM ON CENTER 15
METAL FURRING CHANNEL(CEILING JOIST)
7.15

7.15
9.50

9.50
2
14
(SEE BLOW-UP DETAIL) 2
14

13
16
15 1
13
16
15 1
AT 1200MM ON CENTER
(SEE BLOW-UP DETAIL)
0.30
12
14 2
12
14 2
ANGLE 20 X 20 X 2 ATTACHED TO

B
11

10
DN 13 3
11

10
DN 13 3 CHB WALL Q/ TOKS SCREWS @ 600mm
12 4 12 4
9 9

8
11 5
8
11 5 ROD SUSPENSION HANGER
10 6 10 6
7
9 7
7
9 7
WITH ADJUSTMENT SPRING
6 6
CEILING VENT(SEE DETAILS)
5

4
5

4
CEILING VENT(SEE DETAILS) METAL DOUBLE FURRING CHANNEL(NAILER)
8 8
3 3 12mm x 38mm x 5m x 0.8mm THK. AT 400mm O.C.
0.25 0.25
2 2

3 1
3 1 METAL CARRYING CHANNEL (CEILING JOIST)
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm
1.20

1.20
4.5MM THK. FIBER CEMENT BOARD
IN 38mm x 38mm x 6mm
TOP OF BEAM
ANGLE BAR FASCIA FRAME

4.5MM THK. FIBER CEMENT BOARD


IN 38mm x 38mm x 6mm
ANGLE BAR FASCIA FRAME
CEILING LINE
B-1
UPPER ROOF CEILING EAVES B-1
LOWER ROOF CEILING EAVES
CHB WALL
REFLECTED CEILING PLAN REFLECTED CEILING PLAN
4.5MM THK. FIBER CEMENT CEILING BOARD

SCALE: 1:100 MTRS.


SCALE: 1:100 MTRS.
CEILING DETAIL(SECTION)
DESIGNED ARCHITECTURAL :

JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
REFLECTED CEILING PLANS ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF CEILING DETAILS SECTION
DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING PERSPECTIVE(CEILING DETAILS) RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-6
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG
ENGINEER II
ENGINEER II
ENGINEER II
OIC - PLANNING AND DESIGN SECTION, CHIEF
ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
DATE: DATE: DATE: DATE:
A B C D 3 2 1
4.65
1.00 2.65 1.00

0.25
PREFORMED PRE-PAINTED G.I. GUTTER

4.5MM THK. FIBER CEMENT BOARD IN 38mm x


38mm x 6mm ANGLE BAR FASCIA FRAME Hi-Rib PRE-PAINTED ROOFING G.I SHEET

0.90
1 SEE TRUSS DETAILS
Hi-Rib PRE-PAINTED ROOFING G.I SHEET

PRE-PAINTED ROOFING G.I FLASHING


0.40mm x 2.44 mm
17
PRE PAINTED SPANISH GUTTER
16

15 0.25

7.15
9.50
14
2 13
16
15 1
12
14 2
11

10

9
SLOPE
DN 13
12
3
4

7
11
10
5
6
4.5MM THK. FIBER
6

5
9 7
CEMENT FACIA BOARD
4
8
3

2
TOP OF BEAM
3
RB RB
1

0.90
1.20

4.5MM THK. FIBER CEMENT CEILING BOARD IN UPPER ROOF


METAL CARRYING CHANNEL (CEILING JOIST) W/ NUTS and WASHERS ON
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE
UPPER ROOF
ROOF PLAN
SCALE: 1:100 MTRS. ROOF SECTION
SCALE: 1:30 MTRS.

A B C D
3 2 1
9.95
8.95 1.00

0.25
PREFORMED PRE-PAINTED G.I. GUTTER

0.90
1
Hi-Rib PRE-PAINTED ROOFING G.I SHEET
4.5MM THK. FIBER CEMENT BOARD IN 38mm x
38mm x 6mm ANGLE BAR FASCIA FRAME Hi-Rib PRE-PAINTED ROOFING G.I SHEET
PRE-PAINTED ROOFING G.I FLASHING
SEE TRUSS DETAILS
17

16

15

0.40mm x 2.44 mm
7.15
9.50

14
2 13
16
15 1
12
14 2 PRE PAINTED SPANISH GUTTER
SLOPE
11
DN 13 3
10
12 4
9 0.25
11 5
8

7
10 6

6 9 7

4
8 TOP OF BEAM
3

4.5MM THK. FIBER


3
2

1
RB RB CEMENT FACIA BOARD
1.20

1.20

0.90
4.5MM THK. FIBER CEMENT CEILING BOARD IN
METAL CARRYING CHANNEL (CEILING JOIST) W/ NUTS and WASHERS ON
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE
LOWER ROOF
ROOF PLAN LOWER ROOF
SCALE: 1:100 MTRS.
ROOF SECTION
DESIGNED ARCHITECTURAL : SCALE: 1:30 MTRS.

JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ROOF PLANS ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF ROOF SECTION DETAILS
DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-7
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
1.20 2.10
16 SECOND FLOOR LINE
1.20

14
15 2
13
12 8"X16" GLAZED GRANITE WALL TILES FINISHED
0.30 11 WITH PLASTIC TILES TRIM AT EDGE
10 2ND FLOOR
9
LANDING 8
7
6
LANDING 5
BEAM
4
STORAGE 3
A
2
1
FFL
PLAN
ELEVATION "A-A"
STAIR PLAN FFL
SCALE: 1:30 M FFL

SECTION "A-A"
50mm x 150mm x 6mm
RECTANGULAR TUBE

0.20
EXPANSION BOLT W/
NUTS AND WASHERS
2
12mm THK. BASE PLATE

2.15
0.28 0.28
1.16 4.48

5.64
0.30

PLAN
EXPANSION BOLT DETAIL
A
1.06

2-50mm x 150mm x 2mm


RECTANGULAR TUBE
0.83 0.64 0.68
50mm x 150mm x 2mm
0.20 RECTANGULAR TUBE
12mm THK. BASE PLATE
PLAN
ANCHOR BOLT 0.28
W/ NUTS and WASHERS
STEEL PIPE
STAIR RAILINGS
0.30

50mm x 150mm x 6mm


RECTANGULAR TUBE
TOILET DETAILS
SCALE: 1:30 MTRS.

BASE PLATE DETAIL SECTION

NGL

FIRE ESCAPE STAIRS DETAILS DESIGNED ARCHITECTURAL :


SCALE: 1:30 MTRS.
JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
MAIN STAIR PLAN ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF MAIN STAIR SECTION DETAILS
DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING FIRE ESCAPE STAIR DETAILS
FEMALE TOILET DETAILS(GROUND F.)
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-8
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
1 2 3

A
CONCRETE GROOVE
2
10mm DIA. RSB

GRAVEL BEDDING
2 3 MOVABLE GRAB BAR
2 1 NON-SKID CEMENT FLOOR
8"X16" GLAZED GRANITE WALL TILES
1.23

0.30 ROUGH FINISH W/ GROOVE LINE


0.30
FINISHED WITH PLASTIC TILES TRIM
AT EDGE
0.60 0.60 0.96 0.98 0.98 0.98 1.00
2ND FLOOR
FF-4 0.28
SECTION

SPOT DETAIL
NDTS
FFL
0.60
WARNING TACTILE BLOCKS NGL NGL
100mm CHB WITH PLAIN CEMENT

1.30 4.90 PLASTER(painted finish)

6.20 0.20
ELEVATION
PLAN
300mm

100mm x100mm
2 3
CONCRETE SKIRTING

BARS BOTHWAYS

FFL RAMP FINISH FLOOR LINE


FFL
NGL NGL
NGL
100mm THK. GRAVEL BEDDING

SECTION SECTION "A-A"


SECTION RAMP DETAILS PWD LOGO
SCALE: NDTS
SCALE: 1:50 MTRS.

0.90

300 A B
2.35

0.40 0.84 0.80 0.31

1
0.20

ELEVATION 61 mm

TACTILE DOTS DETAIL PLAN


18mm 18mm

FFL
26mm
TOILET DETAILS(MALE/PWD)
CLEAR WIDTH
SCALE: 1:30 MTRS.
0.90
(SWING DOOR FULLY
PLAN ELEVATION SWITHCES FOR PWD
SCALE: 1:20 MTRS.
PLAN WARNING TACTILE DETAILS
SCALE: 1:30 MTRS

DOOR DETAIL(PWD) DESIGNED ARCHITECTURAL :


SCALE: 1:30 MTRS.
JOVEL K. PANGAN
ARCHITECT II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RAMP DETAILS ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF PWD/MALE TOILET DATE:
CHECKED / REVIEWED : A
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING
PWD DOOR DETAIL
SWITCHES FOR PWD RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. A-9
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
WARNING TACTILE DETAIL ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
GENERAL NOTES: 3.3. BACK FILL SHALL BE PLACED IN LAYER AND EACH LAYER SHALL BE 200mm THK. AND
SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY.
1. STANDARDS AND REFERENCES 3.4. WHERE LOOSE / SOFT MATERIAL ID ENCOUNTERED AT DEPTH OF EMBEDMENT INDICATED, EXCAVATE TOOLED
50 mm
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE PROJECT. 1 EDGES
TO FIRM LAYER AND REPLACE LOOSE / MATERIALS UNDERNEATH THE FOOTING AREA PLUS 2 DEPTH
1.1. NATIONAL STRUCTURAL CODE OF THE PHILIPPINES ( NSCP ) VOL. 1, 6TH EDITION. 2010. OF SOFT MATERIAL ON ALL SIDES WITH SELECT GRANULAR BACKFILL. COMPACT SELECT GRANULAR

T/3 T/3 T/3


BACKFILL TO 95% OF MAXIMUM DRY DENSITY.

T
2. DESIGN CRITERIA Bukidnon
2.1. LOADINGS 4. MATERIALS
A. DEAD LOAD 4.1. CONCRETE CONSTRUCTION
CONCRETE - 23.56 KN/M 4.1.1. CONCRETE COVER OVER REINFORCING BARS SHALL BE AS FOLLOWS JOINT
STEEL - 76.93 KN/M A. FOOTINGS, FOOTING-TIE BEAMS ( CAST AGAINST EARTH ) 75mm 3 mm SAWED JOINT W/
150MM THK. CHB WALL - 2.73 KPA SEALANT
B. BEAMS AND COLUMNS ( TO STIRRUPS AND TIES ) 40mm
100MM THK. CHB WALL - 2.11 KPA C. WALLS, SIDE OF FOOTING-TIE BEAMS ( CAST AGAINST FORMS ) 40mm

T/2
B. LIVE LOAD D. SUSPENDED SLAB 20mm

T
ROOF - 1.00 kPa 4.1.2. BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER PLACEMENT OF ALL OPENINGS,
CLASSROOMS, LABORATORY - 1.90 kPa SLEEVES, CURBS, CONDUITS, ETC. RELATING TO THE WORK
TOILETS - 2.40 kPA 4.2. REINFORCING BARS WEAKEND PLANE
CORRIDORS ABOVE, STAIRS - 3.80 KPA 4.2.1. ALL REINFORCING BARS SHALL BE CLEAN OR RUST, GREASE OR OTHER MATERIALS THAT WILL IMPAIR BOND. NOTE : JOINT
CORRIDORS ON GROUND - 4.80 KPA 4.2.2. ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING CONCRETE OR APPLYING CONTROL JOINT CAN BE EITHER
CONSTRUCTION JOINT OR WEAKENED
C. WIND LOAD (NSCP 2010) MORTAR OR GROUT. PLANE JOINT.
BASIC WIND VELOCITY, V = 250 KPH 4.2.3. LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE.
P = qh [ (GCpf) - (GCpi) ] ( DESIGN WIND PRESSURE ) 4.2.4. UNLESS OTHERWISE INDICATED. SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH ACI-318M. EXCEPT
WHERE :qh = VELOCITY PRESSURE, kPa
GCpf = EXTERNAL PRESSURE COEFFICIENT 4.2.5.
THAT THE MINIMUM LAP SPLICE SHALL BE 40 BAR DIAMETER BUT NOT LESS THAN 600mm.
UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS:
CONSTRUCTION JOINT FOR SLAB
GCpi = INTERNAL PRESSURE COEFFICIENT
D. SEISMIC LOAD (NSCP 2010)
A.
B.
INTERMEDIATE BEAMS; TOP BARS SHALL BE SPLICED AT MID-SPAN, AND BOTTOM BARS AT THE SUPPORT.
BEAMS FRAMING TO COLUMNS; TOP BARS SHALL BE SPLICED AT MID-SPAN AND BOTTOM BARS SHALL NOT BE
ON-FILL
V = ( CVL / RT ) W ( DESIGN BASE SHEAR ) d
SPLICED W/IN A DISTANCE OF TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. THE SPLICED
12d
VMAX = ( 2.50 CAL / R ) W VMIN = 0.11 CALW LENGTH SHALL NOT BE LESS THAN 1.4 TIMES THE DEVELOPMENT LENGTH ( Ld ) IN 4.2.8 BELOW BUT NOT LESS 4d - 60mm Min.
D
VMIN = (0.80 ZNVL / R) W (ZONE 4) THAN 600mm.
WHERE : C. COLUMNS; LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF HEIGHT AND THE SPLICE SHALL NOT BE
D
W = TOTAL DEAD LOAD LESS THAN 30 BAR DIAMETER. WELDING OR THE USE OF APPROVED MECHANICAL DEVICES MAY BE PERMITTED 6
1
T = NATURAL PERIOD = CT ( HN ) 23 ; PROVIDED NOT MORE THAN ALTERNATE BARS ARE WELDED OR SPLICED AT ANY LEVEL AND THE MINIMUM
WHERE : VERTICAL DISTANCE BETWEEN TWO ADJACENT BAR SPLICES SHALL BE 600mm. 10d Min.
C = NUMERICAL COEFFICEINT D. CHB WALLS; VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTINGS OR FOOTING-TIE BEAMS AND d d OFFSET
H = BUILDING HEIGHT AT THE BOTTOM OF REINFORCED CONCRETE LINTEL BEAMS OR BEAMS.
4.0.1. UNLESS OTHERWISE INDICATED: ALL BEAMS TERMINATING AT A COLUMN SHALL HAVE TOP AND BOTTOM BARS
I = IMPORTANCE FACTOR = 1.50 EXTENDING TO THE FAR FACE OF THE COLUMN. TERMINATING IN A STANDARD 90 HOOK LENGTH OF ANCHORAGE SHALL
R = NUMERICAL FACTOR = 8.50 NOT BE LESS THAN 600mm.
WIRE TIGHTLY TOGETHER
SEISMIC COEFFICIENT CV = 0.44NV 4.0.2. SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF THE ENGINEER PRIOR TO FABRICATION TIE HOOK
4d - 600mm Minimum
CA = 0.64N & INSTALLATION.
NEAR SOURCE FACTOR ( 10KM ) NV = 1.2 4.0.3. DEVELOPMENT LEGTH ( Ld ) OF REINFORCING BARS SHALL BE AS FOLLOWS:
NA = 1.0 SIZE OF REBARS DEVELOPMENT LENGTH
d
Z = SEISMIC ZONE = 0.40 ( ZONE 4 ) 10 mm 170 mm NOTE :
S = SOIL TYPE = D 12 mm 220 mm 1. ALL BENDS SHOWN IN DETAILS / SCHEDULES SHALL LAP
BE SPLICE
18 mm 270 mm
STANDARD HOOK OTHERWISE NOTED.
2.1. DESIGN STRESSES 20 mm 360 mm
A. CONCRETE 25 mm 600 mm 2.
COMPRESSIVE STRENGTH @ 28 DAYS fc' = 20.7 MPa ( 3,000 psi ) 4.1. STRUCTURAL STEEL
B. REINFORCING BARS 4.1.1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 AND SHALL HAVE A MINIMUM YIELD STRESS, Fy = 248 MPa (
a. fy = 275 MPa ( 40,000 psi ) 36,000 psi ) TYPICAL REINFORCEMENT DETAIL
b. fy = 230 MPa ( 33,000 psi ) 4.1.2. ALL STRUCTURAL STEEL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC SPECIFICATIONS AND CODE OF
C. STRUCTURAL STEEL, ASTM-A36 STANDARD PRACTICE AS AMMENDED TO DATE.
CONSTRUCTION
FOR TRUSSES, BRACINGS, & STRUTS fy = 248 MPa ( 36,000 psi ) 4.1.3. ALL BOLTS SHALL CONFORM TO ASTM A-307 UNLESS OTHERWISE INDICATED.
30mm JOINT
D. PURLINS 4.1.4. SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D1.1 AND PERFORMED BY QUALIFIED 3 EXTRA STIRRUPS @ 75mm ON
CENTER
COLD FORMED LIGHT CAGE SHAPES fy = 248 MPa ( 36,000 psi ) 4.1.5. UNLESS OTHERWISE INDICATED, WELDING ELECTRODES SHALL BE E60.
E. MASONRY UNIT ( CHB ) 4.1.6. NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWINGS HAVE BEEN APPROVED BY THE STRUCTURAL

H/3
NON-LOAD BEARING CHB WALLS fm' = 3.45 MPa ( 500 psi ) ENGINEER.
F. WELDS-USED E-60xx ELECTRODE 4.1.7. WELDS / ( CONFORM WITH AMERICAN WELDING STANDARDS ) USING E 60xx ELECTRODES. Fy = 93.77 MPa.
G. STRUCTURAL BOLTS, ASTM-A307 4.1.8. ANCHOR BOLTS ( CONFORM WITH ASTM A - 307 ) ft. = 96.60 MPa. fv = 69 MPa.
a. Ft = 96.60 MPa ( 14,000 psi ) b. Fv = 69 MPa ( 10,000 psi ) 4.2. CONCRETE HOLLOW BLOCKS ( CHB ):

H/3
4.2.1. UNLESS OTHERWISE INDICATED, CHB USED IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH

H
f' m = 3.45 MPa ( 500 psi )
3. FOUNDATION
4.2.2. ALL CHB CELL SHALL BE FILLED SOLIDLY WITH GROUT.
3.1. ASSUMED SOIL BEARING CAPACITY SHALL BE 96 kPa ( 2000 PSF )
3.1.1. IN CASE THE ACTUAL LOCATION OF THE STRUCTURE IS LESS THAN THE ASSUMED DISTANCE FROM THE SEISMIC

H/3
SOURCE OF 40 km; NOTIFY THE DIRECTOR, BUREAU OF DESIGN FOR PROPER REVISION OF THE DESIGN. REFER TO THE
5. CONSTRUCTION JOINT
SEISMIC SOURCE MAP PROVIDED IN THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES OR PHIVOLCS SEISMIC 5.1. CONSTRUCTION JOINT NOT INDICATED ON THE PLANS SHALL BE MADE SO AS TO LEAST IMPAIR THE STRENGTH OF THE
SOURCE MAP. STRUCTURE AND SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER EXCEPT SLAB ON GRADE.
5.2. UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS SPACED AT 600mm MAXIMUM CENTER TO BEAM 75mm
3.1.2. SOIL TEST SHALL BE CONDUCTED PRIOR TO START OF CONSTRUCTION. 3 EXTRA STIRRUPS @ 75mm ON
REINFORCEMENT
CENTER. 75mm 75mm
3.1.3. IN CASE THE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS THAN THE ASSUMED, 96 kPa; NOTIFY THE DIRECTOR, DO NOT INTERRUPT CENTER
5.3. BEAMS CONSTRUCTION JOINTS SHALL BE LOCATED WITH IN THE MIDDLE THIRD OF THE SPAN, IT SHALL BE PROVIDED WITH 3 50mm
BUREAU OF DESIGN FOR PROPER REVISION OF FOUNDATION. 3 EXTRA STIRRUPS @ 75mm ON 75mm

3.1.4. NO FOOTING SHALL REST ON FILL. EXTRA STIRRUPS @ 75mm O.C. ON EACH SIDE OF THE JOINT. CENTER 50mm

3.1.5. BOTTOM OF FOOTING SHALL BE AT LEAST 1.00m. BELOW NATURAL GRADE LINE.
3.1.6. SOIL BEARING CAPACITY SHALL BE INCREASED BY 33% WHEN IN COMBINATION WITH SEISMIC OR WIND LOAD
3.2. ALL COLUMN FOOTINGS AND TIE BEAMS SHALL REST ON 100mm THK. WELL COMPACTED GRAVEL BASE COURSE. DESIGNED STRUCTURAL :

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
STRUCTURAL NOTES ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-1 10 28
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
NOTE :
SINGLE & TWO (2) BAR BUNDLE THREE (3) BAR BUNDLE VERTICAL REINFORCEMENT Ld = DEVELOPMENT LENGTH OF
SINGLE & TWO (2)
BAR SIZE BAR SIZE BAR SIZE RE-BARS ABOVE VALUES SHALL BE THE
BOTTOM BOTTOM TOP SINGLE & TWO (2) BAR THREE (3) BAR BUNDLE BAR BUNDLE
TOP BARS MINIMUM SPLICE OR DEVELOPMENT LENGTH.
BARS BARS BARS BUNDLE ADDITIONAL MODIFICATION FACTORS OF ACI
600 mm 750 mm 800 mm 925 mm 1000 mm 400 mm ( CHAPTER 12 ) SHALL BE USED WHEREVER

750 mm 950 mm 900 mm 1200 mm 1500 mm 500 mm SHALL NOT BE BUNDLED.

925 mm 1200 mm 1100 mm 1450 mm

STRUCTURAL ELEMENTS CLEAR SPAN BET. SUPPORTS MINIMUM TIME PERIOD DAYS ELEMENT MINIMUM CAMBER

WALLS, COLUMNS, BEAMS,


GIRDER SIDES & SLAB ON - 1 REINFORCED CONCRETE BEAMS 6 mm FOR EVERY 4.50 m SPAN
GRADE
UNDER 3.00 m 7
JOIST, BEAMS, & GIRDER CANTILEVER REINFORCED CONCRETE BEAMS 18 mm FOR EVERY 3.00 m SPAN
3.00 m TO 6.00 m 14
SOFFIT
OVER 6.00 m 21
REINFORCED CONCRETE SLAB 3 mm FOR EVERY 3.00 m SHORTER SPAN
UNDER 3.00 m 4
ONE-WAY FLOOR SLABS 3.00 m TO 6.00 m 7
OVER 6.00 m 10

SPLICING REQUIREMENTS OF REINFORCING BARS


"Ls" OR "Ld"

TRANSVERSE BEAM NOTE :


SPACING - S SPACING - S
REBARS COLUMN CONFINEMENT TIES AS PER COLUMN CLEAR DISTANCE BETWEEN
RE-BARS ARE TO BE STRICTLY INTERIOR
SCHEDULE
STIRRUPS ( TYPICAL ) COLUMN
500 mm (MINIMUM) TERMINATION BEND 500 mm ( MINIMUM) TERMINATION BEND MAINTAINED
GIRDER TOP BARS ARE
LAID OVER OF BEAM
TOP BARS

h/3
BEAM DEPTH - h
h/3
100 mm MIN.

Ldh

h/3
BEAM

NOTE : OUTSIDE DIMENSION THAN 1


3 THE OVERALL
DEPTH OF THE BEAM.
50 mm
1. CENTER TO CENTER SPACING OF PIPE
SLEEVES SHALL IN NO CASE BE LESS THAN 3 4. PIPE SLEEVES SHALL BE LOCATED WITHIN THE
TIMES THE SLEEVE DIAMETER MIDDLE THIRD OF THE BEAM DEPTH..

2. PIPE SLEEVES OF ALUMINUM SHALL NOT BE 5. PIPE SLEEVES SHALL BE LOCATED WITHIN THE
INTERIOR COLUMN MIDDLE THIRD OF BEAM CLEAR SPAN.
EMBEDED IN STRUCTURAL CONCRETE.
REBARS
50 mm 50 mm
3. PIPE SLEEVES SHALL NOT BE LARGER IN

GIRDER

TYPICAL BEAM PENETRATION


INTERIOR COLUMN TERMINATION BEND TYPICAL PLAN OF BEAM / GIRDER COLUMN JOINT
DETAIL
Ldh INTERIOR COLUMN REBARS COLUMN CONFINEMENT
Ldh INTERIOR COLUMN AS PER COLUMN COLUMN REBARS TO BE
REBARS COLUMN CONFINEMENT BEAM SCHEDULE EXTENDED AS PART OF BEAM
TRANSVERSE BEAM AS PER COLUMN REINFORCEMENTS
CLEAR SPAN " L " EXTRA TOP BARS
REBARS SCHEDULE BEAM REBARS ( TOP BARS
BEAM TOP BARS Ld
COLUMN CONFINEMENT ) LAID OVER ON GIRDER L/4 ROOF BEAM
AS PER COLUMN GIRDER Ldh CONT. TOP &
500 mm (MINIMUM) TERMINATION BEND

TOP BARS
SCHEDULE 50 mm REINFORCEMENTS GIRDER TOP BOTTOM BARS

500 mm (MINIMUM) TERMINATION BEND


BEAM
REBARS BARS
500 mm (MINIMUM) TERMINATION BEND

50 mm

GIRDER
BEAM
50 mm
50 mm

50 mm
BEAM BOTTOM
BARS

COLUMN
COLUMN 50 mm
50 mm GIRDER 50 mm
GIRDER BOTTOM REBARS
BARS 50 mm

COLUMN 50 mm AT COLUMN INTERSECTION AT GIRDER SPAN


CORNER END COLUMN

TYPICAL BEAM AND GIRDER CORNER / EXTERIOR


BEAM RE-BAR TERMINATION BEND DESIGNED STRUCTURAL :

RUBEN A. ABA-A JR.


RE-BAR LAY-OUT COLUMN TERMINATION BEND
ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SPLICING REQUIREMENTS OF ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X REINFORCING BARS "Ls" OR PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING "Ld" AND OTHER IMPORTANT
NOTES
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-2 11 28
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
REQUIRED BEAM
ADDITIONAL STIRRUPS
LINTEL BEAMS MASONRY
REQUIRED BEAM CHB STIFFENER COLUMN REBARS
TOP & BOTTOM WALL B ( mm ) H ( mm ) HORZ.
STIRRUPS HORIZONTAL BARS VERTICAL BARS
BARS BARS
SPACED AT 300 mm SLAB t ( mm )
REBARS FLOOR DEPRESSION ( VER. ARCH'L PLANS ) 100 100 200 100 mm THK. MORTAR FILLER W/
O.C.
150 150 200

300 mm
TOILET & 200 200 200
BATH NOTE : 12mm THK. STYROPHOR
6. STRUCTURAL GAPS SHALL

BEAM DEPTH - h
FILLER ( NON-TOXIC )
300 mm 1. REFER TO ARCHITECTURAL PLANS TO VERIFY LOCATIONS OF IN NO CASE BE COVERED
ALL CHB WALLS. W/ PLASTER.
12 mm

h/2
2. REFER TO THICKNESS OF FINISHES TO ARCHITECTURAL
BEAM DEPTH

PLANS.

300 mm
3. 12mm THICK GAP SHALL BE PROVIDED IN BETWEEN WALLS & 100 mm
COLUMNS, WALLS & BEAMS, WALLS & SLABS ON TOP.

4. SILICONE SEALANT SHALL BE PROVIDED FOR ALL EXTERNAL


WALL ( CHB ). FOR INTERNAL WALLS, SEALANT NEED NOT BE
PROVIDED.

5. STRUCTURAL R.C. WALLS ( i.e. WATER TANK, ETC. ) SHALL


2 BLOW-UP DETAIL
BEAM DEPTH - h ( VER. ARCH'L PLANS )
NOT BE PROVIDED W/ 12mm THICK GAPS ALL AROUND.
S 3 SCALE 1:20 M

1
S 3
TOP ANCHORAGE OF LINTEL ACTING AS
REQUIRED SLAB 300 mm O.C.
STIFFENER COLUMN
BARS
SLAB THICKNESS

BARS
B
SEE 2 50 mm VERT. BARS ( TYPICAL )
TOP OF ROOF DETAIL S 3 300 mm TOP OF ROOF LINTEL BEAM REINF. STEEL BAR LINTEL BEAM REINF. STEEL
BEAM 400mm O.C. ( TYPICAL ) BEAM ON TOP OF WALL OPENING ( BAR ON TOP OF WALL
300 mm

200mm VERIFY REBARS ) OPENING ( VERIFY REBARS,


HOR. BARS & STIRRUPS )

H
300mm TYPICAL ) CHB WALL

H
REBARS
FLOOOR BEAM DEPTH - D

H
BEAM DEPTH - h 2ND FL.
REQUIRED BEAM
REINFORCING BARS 2ND FL. FFL
FFL

LINTEL BEAM DEPTH - d

300 mm
AT EVERY 3RD LAYER

1 DETAILED SECTION OF CHB


AT EVERY 3 LAYERS OF CHB OR BAR. PER SIDE OF
CHB THICKNESS ( t )

H
S 3 SCALE 1:10 M 0.60m O.C. OPENING
H

HEIGHT - h
AT 400 mm O.C. (
WALL B
400mm O.C. ( TYPICAL )
BEAM DETAIL FOR T & B DEPRESSION OPENING

TYPICAL )
LINTEL BEAM REINF. STEEL
BAR ON TOP OF WALL
OPENING ( VERIFY REBARS,
ANCHOR TO WALL
HOR. BARS & STIRRUPS )

H
FOOTING (WF) CHB WALL
REQUIRED
TOP & REBARS
GR. FL.
SLAB TOP BARS WHEN BOTTOM FFL
Ld DEPRESSION - d ( VER. ARCH'L PLANS ) GR. FL.
CALLED FOR IN THE BARS
SCHEDULE FFL
SLAB THICKNESS - t

300 mm

WF
WF WF 200 mm WIDTH - w 200 mm
C/F CHB THICKNESS ( t )
Ld

t
Ld C/F C/F

TYPICAL SLAB DEPRESSION DETAIL TYPICAL MASONRY ELEVATION W/ LINTEL TYPICAL CHB WALL OPENING ELEVATION
BEAMS & STIFFINER COLUMNS TYPICAL LINTEL BEAM DETAIL
SHOWING STEEL REINFORCEMENTS
REFLECTING REINF. STEEL BARS
300 mm NOTE :
100 mm INTERSECTION
12 mm O.C. CHB
FINISHED SURFACE
300 mm OF CHB 300 mm PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING
INTERIOR CHB REBARS FINISHED mm O.C. RULES AND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH
COLUMN

SURFACE
OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY
RC

CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE


300 mm

TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF
FINISHED
SURFACE
THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.
INTERSECTION
THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE
FAILURE OF THE FACILITY / IES STRUCTURES DUE TO FAULTY DESIGN EXCEPT FOR
THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

CHB EXTERIOR WALL SIDE ANCHORAGE CORNER WALL DETAIL DESIGNED STRUCTURAL : WALL INTERSECTION
DETAIL RUBEN A. ABA-A JR.
ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL MASONRY ELEVATION ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X W/ LINTEL BEAMS & STIFFINER PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING COLUMNS REFLECTING REINF.
STEEL BARS AND
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-3 12 28
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II
OTHER IMPORTANT NOTES DATE:
OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE:
STRUCTURAL NOTES 3. BASIC DESIGN LOADS
General Notes : 4.1.2 WORKING DRAWINGS - NO STEEL SHALL BE FABRICATED OR ERECTED UNTIL SHOP DRAWINGS HAVE BEEN
DESIGN LOADINGS: APPROVED BY THE STRUCTURAL ENGINEER AND SHALL CONFORM TO THE CODE OF
1. GENERAL - PROVIDE ADEQUATE TIES FOR ALL STEEL BARS AND STIRRUPS IN SLABS AND BEAMS.
STANDARD PRACTICE AS AMENDED TO DATE.
DEADLOAD (DL)
1.1 REFERENCE TO OTHER DRAWINGS ALL REINFORCING STEEL IN SLABS AND BEAMS SHALL BE PLACED AT CORRECT
ROOFING: - ALL SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D.1.1 AND
SEE ARCHITECTURAL DRAWING AND OTHER RELEVANT DRAWINGS FOR KINDS OF
550 Pa = Wt. of Roof Covering of Roof Surface DISTANCE FROM THE FORMS BY ADEQUATE CONCRETE BLOCKS, STEEL CHAIRS, OR PERFORMED BY QUALIFIED WELDERS.
FLOOR FINISHES, OPENINGS IN WALLS AND SLABS, INTRERIOR PARTITIONS, LOCATION
OF CHB WALLS, ETC. 35 Pa = Wt. of Bracing System of Roof Surface TIES IN ACCORDANCE WITH THE LATEST ACI CODE. - UNLESS INDICATED OTHERWISE, WELDING ELECTRODES SHALL BE E60xx. MINIMUM
240 Pa = Wt. of Ceiling of Horizontal Surface THICKNESS OF WELD SHALL BE 4mm.
1.2 DIMENSIONS 80 Pa = Wt. of EE/ME Utilities of Horizontal Surface - PROVIDE HEADER BARS IN BOTTOM OF SLAB IN FRONT OF ALL OPENINGS AND
- BOLTS FOR STRUCTURAL STEEL MEMBER CONNECTION SHALL CONFORM TO ASTM
-DIMENSIONS SHOWN ARE IN MILLIMETERS UNLESS OTHERWISE NOTED BEAMS/COLUMNS: CASES FOR ALL BEARING WALLS UNLESS OTHERWISE NOTED ON THE PLAN. A325 SPECIFICATIONS.
-IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONS SHALL
GOVERN AND DISTANCES OR SIZE SHALL NOT BE SCALED FOR CONSTRUCTION 23.60 kN/cu.m. = Selfweight
- PROVIDE LONGITUDINAL OR TEMPERATURE REINFORCEMENT IN SOLID SLABS IN 4.3 CONCRETE MASONRY UNITS
PURPOSES. 2.36 kPa = Reinforced Concrete
ACCORDANCE WITH THE ACI CODE.
3.30 kPa = 150mm CHB Wall 2 faces plastered - CMU USED IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE
1.3 DISCREPANCIES 2.44 kPa = 100mm CHB Wall 2 faces plastered STRENGTH OF 500 psi.
- THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS TO THE 0.15 kPa = Ceiling Wt. 4.1.3 REINFORCING BARS
ARCHITECTURAL DRAWINGS IN REFERENCE TO THE LAYOUT. DIMENSIONS AND 0.10 kPa = EE/ME/PLUMBING Utilities - UNLESS OTHERWISE INDICATED, ONLY CELLS CONTAINING REINFORCING BARS SHALL
ELEVATIONS SHALL BE CONSULTED TO THE DESIGN ENGINEER IN CASE OF - UNLESS OTHERWISE SPECIFIED ON PLANS, ALL REINFORCING BARS SHALL BE BE FILLED WITH GROUT. ALL CELLS BELOW GROUND LINE SHALL BE SOLIDLY FILLED
LIVE LOADS (LL)
DISCREPANSIES IN THE ISSUED DRAWINGS. DEFORMED WITH A MINIMUM YIELD STRENGTH OF Fy = 414 MPa FOR 28mm DIA above WITH GROUT. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 17.20
750 Pa = Roofing Load MPa (2500psi) AT 28 DAYS.
- THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AND 2040 Pa = Typical Floor Load AND Fy = 275 MPa FOR 16mm - 25mm (UNLESS OTHERWISE SPECIFIED ON PLANS)
SHALL NOTIFY THE ENGINEER OF DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND - OPENING FOR DOORS, WINDOWS AND OTHER GAPS ON CMU WALLS SHALL BE
WIND LOAD (WL) - ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER DELETERIOUS
OTHER INFORMATIONS SHOWN ON THE DRAWINGS BEFORE PROCEEDING WITH THE PROVIDED WITH REINFORCED CONCRETE LINTEL BEAM AT EVERY 10 LAYERS OF CHB.
p = q [(GCpf) - (GC )] MATERIALS WHICH TEND TO IMPAIR BOND.
WORK. THIS SHALL INCLUDE THE LOCATION AND DIMENSIONS OF GROOVES, pi
- ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE 5. GRANULAR BASE
REGLETS, SLEEVES, CURVES, OPENINGS, EMBEDDED OR ATTACHED ITEMS, ETC. P = BASIC DESIGN WIND PRESSURE
GC = Product of equivalent external pressure coefficient and gust effect factor POURING CONCRETE OR APLLYING MORTAR OR GROUT. - THE GRANULAR BASE MATERIAL SHALL CONFORM TO AASHTO M147 GRADING A.
GC = Product of internal pressure coefficient and gust effect factor
1.4 CONSTRUCTION DRAWINGS q = velocity pressure - LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE AT 30 % OF THE TOTAL - GRANULAR BASE SHALL BE PLACED IN THE POSITIONS OF THE REQUIRED THICKNESS
- ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, NUMBER OF VERTICAL BARS ON EVERY COLUMN. AS SHOWN ON THE DRAWINGS.
200 kph = Wind Velocity
SECTION OR DETAILS. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE Exposure Category B - UNLESS INDICATED OTHERWISE, SPLICING OF THE REINFORCEMENTS SHALL BE IN - WHEN THE REQUIRED THICKNESS IS MORE THAN 150mm, THE BASE MATERIAL SHALL BE
OVER GENERAL NOTES AND TYPICAL DETAILS. 366m = Gradient Height ACCORDANCE WITH ACI 318. MINIMUM LAP SPLICE SHALL BE 40 BAR DIAMETER BUT SPREADED AND COMPACTED INTO TWO OR MORE LAYERS OF APPROXIMATELY
7 m = Width of Exposure NOT LESS THAN 1000mm. EQUAL THICKNESS AND THE MAXIMUM COMPACTED THICKNESS OF ANY ONE LAYER
- TYPICAL DETAILS AND GENERAL NOTES ON S - 1 APPLY TO ALL PARTS OF THE JOB SHALL NOT EXCEED 150mm.
UNLESS OTHERWISE SHOWN ON THE DRAWINGS. EARTHQUAKE LOAD - PROVIDE 100% CONTINUITY OVER SUPPORTS FOR ALL CONTINUOSSLABS, BEAMS AND - COMPACTED DRY DENSITY OF EACH LAYER SHALL NOT BE LESS THAN 100 % OF THE
- THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE DESIGN BASE SHEAR, V = Cv I (W) JOISTS UNLESS OTHERWISE NOTED. MAXIMUM DRY DENSITY DETERMINED ACCORDING TO ASTM D1557.
FINISHED STRUCTURES. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION RT - UNLESS OTHERWISE SHOWN ON PLANS, SPLICES SHALL BE AS FOLLOWS:
UNLESS SO STATED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO Where: 6. FOUNDATIONS
- BEAMS AND FOOTING TIE BEAMS
PROTECT THE PERSONS DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR z = SEISMIC ZONE FACTOR TOP AND BOTTOM BARS SHALL NOT BE SPLICED WITHIN A DISTANCE OF TWICE THE - FOUNDATIONS ARE DESIGNED USING AN ASSUMED ALLOWABLE SOIL BEARING
SHALL IMMEDIATELY NOTIFY THE OWNER AND/OR THE ENGINEER OF ANY CONDITION I - IMPORTANCE FACTOR, 1.00 CAPACITY OF _190_ KPa AT DEPTHS INDICATED IN THE DRAWINGS. SOIL
MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST TWO EXTRA STIRRUPS-TIES
WHICH IN HIS OPINION MIGHT DISTRESS THE STRUCTURE. R = numerical coefficient representative of the INVESTIGATION SHALL BE CARRIED PRIOR TO CONSTRUCTION AND THE STRUCTURAL
inherent overstrength and global ductility SHALL BE PROVIDED AT ALL SPLICES. THE SPLICE LENGTH SHALL NOT BE LESS THAN 1.3 x ENGINEER SHALL BE FURNISHED A COPY OF THE SOIL'S REPORT. FOOTINGS SHALL BE
1.5 OTHERS W = TOTAL SEISMIC DEAD LOAD THE DEVELOPMENT LENGTH (LD) IN ITEM NO. 4.1.4 BELOW, BUT NOT LESS THAN 300mm. REDESIGNED IF ACTUAL ALLOWABLE SOIL BEARING CAPACITY IS LESS THAN THE
- CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED FLOORS. IT IS THE C = SEISMIC COEFFICIENT - COLUMNS ASSUMED VALUE.
GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE SUB-CONTRACTORS S = Soil profile type SPLICES WHEN PERMITTED SHALL BE MADE JUST ABOVE EACH FLOOR OF THE COLUMN - SOIL BEARING CAPACITY SHALL BE INCREASED BY 33 % FOR COMPACTED (D+L+N)
ARE INFORMED AND DO NOT VIOLATE THIS IMPORTANT REQUIREMENT. T = elastic fundamental period of vibration HEIGHT AND THE LAP SPLICE SHALL NOT BE LESS THAN 40 BAR DIAMETER OR 1000mm OR (D+L+W).
WHICHEVER IS GREATER. THE USE OF APPROVED MECHANICAL DEVICES MAY BE - BACKFILL SHALL BE PLACED IN 200mm LAYERS AND EACH LAYER SHALL BE
4. MATERIALS
PERMITTED PROVIDED THAT NOT MORE THAN ALTERNATE BARS ARE SPLICED AT ANY COMPACTED TO 95 % MAXIMUM DRY DENSITY BEFORE SUBSEQUENT LAYERS ARE LAID.
- IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TEMPORARY ERECTION
4.1 CONCRETE LEVEL AND THE MINIMUM VERTICAL DISTANCE BETWEEN TWO ADJACENT BAR SPLICES - WHERE SOFT/LOOSE MATERIALS ARE ENCOUNTERED AT DEPTH OF FOOTING
BRACINGS AND SHORINGS FOR ALL THE STRUCTURAL MEMBERS AS REQUIRED FOR
4.1.1 DESIGN DRAWINGS SHALL BE 600mm. BUNDLED BARS CUT OFF POINTS MUST BE STAGGERED AT LEAST 40 db. EMBEDMENT INDICATED, EXCAVATE TO FIRM LAYER AND REPLACE LOOSE,SOFT
STABILITY DURING ALL PHASES OF THE CONSTRUCTION.
- CONCRETE SHALL DEVELOP A MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 - CONCRETE MASONRY WALLS MATERIAL UNDERNEATH THE FOOTING. COMPACT SELECTED BACKFILL TO 95 % OF
DAYS FOR:
VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTING OR FOOTING TIE MAXIMUM DRY DENSITY (ASTM D1557).
2. STANDARDS AND REFERENCES a. SLAB ON FILL = 21 MPa (3000 psi) BEAM AND THE BOTTOM OF RC LINTEL BEAM OR BEAMS. UNLESS INDICATE
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF b. FOOTING, COLUMNS, SHEAR WALLS = 20.7 Mpa (3000psi) - NO FOOTING SHALL REST ON FILL. FOOTING FOR CHB WALLS AND OTHER MINOR
OTHERWISE, ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE TOP AND BOTTOM STRUCTURES SHALL BE EMBEDDED AT LEAST 700mm FROM NATURAL GROUND.
THE PROJECT. c. FLOOR SLABS, BEAMS & GIRDERS = 20.7 Mpa (3000 psi)
AMERICAN CONCRETE INSTITUTE (ACI) d. CANOPIES, GUTTERS, PARAPET WALLS & OTHER STRUC'L ELEM. = 20.7 MPa (3000 psi) LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600mm. SHOP DRAWINGS FOR
2.1 7. CONSTRUCTION NOTES
PUBLICATION A318-89 BUILDING CODE e. LEAN CONCRETE = 1500 psi REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL TO THE ENGINEER PRIOR TO 7.1 NOTES ON CONCRETE WALLS
REQUIREMENTS FOR REINFORCED CONCRETE f. PARTITIONS, BEDDED SLAB SIDEWALKS, CURB, GUTTERS & NON STRUC'L ELEMENTS FABRICATION. - ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
= 28 MPa (4000 psi) REINFORCEMENTS, UNLESS OTHERWISE INDICATED IN THE PLANS.
2.2 AMERICAN INSTITUTE OF STEEL CONSTRUCTION 4.1.4 DEVELOPMENT LENGTH OF REINFORCING STEEL BARS ARE AS FOLLOWS: REINFORCEMENT
(AISC PUBLICATION) MANUAL OF STEEL CONSTRUCTION
- PLACE SHORT SPAN BARS IN BOTTOM LAYER FOR TWO WAY SLABS. STEEL BARS DEVELOPMENT LENGTH (LD)
EIGHT EDITION
- ALL CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH 10mm DIA. 150mm WALL
2.3 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES ACI 318-89. 12mm DIA. 200mm THICKNESS HORIZONTAL VERTICAL REMARKS
@ 300mm HOR. BARS AT CENTER, VERT.
(NSCP) VOL. 2, 2010 EDITION - FIRE PROOFING THICKNESS SHALL BE AT LEAST 20MM FOR SLABS AND JOISTS, 38MM 16mm DIA. 250mm
100 10mm @ 250mm O.C. 10mm O.C.
BARS ARE STAGGERED OUTSIDE
HOR. BARS AT CENTER, VERT.
450mm 125 10mm @ 200mm O.C. O.C.
2.4 UNIFORM BUILDING CODE FOR BEAMS, GIRDERS AND COLUMNS. 20mm DIA. 10mm @ 250mm BARS ARE STAGGERED OUTSIDE
HOR. BARS AT CENTER, VERT.
- BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER 25mm DIA. 600mm 150 12mm @ 225mm O.C. 12mm @ 250mm O.C.
BARS ARE STAGGERED OUTSIDE
650mm HOR. BARS AT CENTER, VERT.
SPECIAL PROVISION: PLACEMENT OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC., RELATING TO THE 28mm DIA. 175 12mm @ 200mm O.C.E.F. 12mm @ 250mm O.C. BARS ARE STAGGERED OUTSIDE
30mm DIA. 700mm 200 @ 250mm BOTH FACES, HORIZONTAL SHALL
WORKS AT LEAST 4 DAYS BEFORE THE POURING OF CONCRETE. 10mm @ 225mm O.C.E.F. 10mm O.C.E.F.
BE OUTSIDE
ALL STRUCTURAL ELEMENT MUST BE CHECKED BY THE STRUCTURAL DESIGN ENGINEER 32mm DIA. 750mm O.C.E.F. BOTH FACES, HORIZONTAL SHALL
300 16mm @ 200mm O.C.E.F. 16mm @ 250mm
THE CONTRACTOR MUST SECURE POURING REQUEST PERMIT PRIOR TO THE POURING ACTIVITY - CONCRETE POURING PERMIT SHOULD BE SECURED AT LEAST 4 DAYS BEFORE 36mm DIA. 850mm BE OUTSIDE
BOTH FACES, HORIZONTAL SHALL
THE POURING ACTIVITY 350 16mm @ 180mm O.C.E.F. 16mm @ 200mm O.C.E.F
BE OUTSIDE
ONLY THE APPROVED QUANTITY BY THE DESIGNER WILL BE PERMITTED FOR CONCRETE POURING - CONCRETE COVER REINFORCING BARS SHALL BE AS FOLLOWS: 4.2 STRUCTURAL STEEL/BOLTS/WELDS BOTH FACES, HORIZONTAL SHALL
400 16mm @ 300mm O.C.E.F. 16mm @ 350mm O.C.E.F.
ALL CONCRETE ACTIVITIES MUST CONFORM WITH THE CONCRETE CONSTRUCTION HANDBOOK a. FOOTING & BOTTOM OF FOOTING TIE BEAMS = 70mm (CAST AGAINST EARTH) BE OUTSIDE
- ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRENGTH Fy = 275 MPa
DESIGNED STRUCTURAL : (40,000psi) AND SHALL CONFORM TO ASTM A36 SPECIFICATIONS

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL NOTES & ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X SPECIFICATIONS PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-4
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
SCHEDULE OF COLUMN
SCHEDULE OF FOOTING LEVEL C1 C2
A B C D

TO ROOF TRUSS LEVEL


FOOTING FOOTING DIMENSIONS (MM) REINFORCEMENT REMARKS 350

ROOF BEAM LEVEL


2.50 3.50 5.50

LOC: GRID 1,2,3,


F1C1 F1C1 F1C1 F1C1 MARK LENGTH WIDTH DEPTH THICKNESS SPACING
REBARS

250
(L) (W) (D) (T) (BOTHWAYS)
BAR-X BAR-Y
1
F1 1500 1500 1200 300 180 B.W. ISOLATED FOOTING
3.50

3.50
F2 1150 1000 800 200 180 B.W. ISOLATED FOOTING

TO ROOF BEAM LEVEL


350

2ND FLR. LEVEL


F1C1 ELEV.- 1.50M F1C1 F1C1
SF-1

250
ELEV.-0 .60M

F1C1 ELEV.- 1.50M


3.50

3.50
F2C2 ELEV.-1M
350
F1C1 F1C1 F1C1 F1C1

GROUND FLR. LEVEL


TO 2ND FLR. LEVEL
ELEV.- 1.50M

250
SF-2ELEV.-0 .25M

TO GROUND FLR. LEVEL


350
2.50 3.50 5.50 300

FOUNDATION LEVEL

250

200
TYPICAL FOOTING
FOUNDATION PLAN
SCALE: 1:100 MTRS.
ROOF BEAM

A B C D
2.50 3.50 5.50 1.50
0.10m THK CONC. 0.55 0.40 0.55 1.00
RSB REBAR AT EVERY 0.35 0.30 0.35
0.40m O.C. B.W. ON
50mm THK GRAVEL FILL

1 WF2
FTB
EXTRA TIES

FTB FTB
WF2 2%
SL
OP
E TO
F.D
WF1 +0.40m
2ND FLR. LN.

.
WF1
3.50

3.50

WF2 WF1 WF1


FTB FTB
+0.40m
WF2
WF1
2
WF2
+0.40m
WF2 FTB WF1 +0.40m
FTB
3.50

3.50

-0.35m

WF1 WF1
8-0.075 AND THE REST IS 0.15M UP
TO MIDDLE LENGTH.
WF1
WF1
+0.40m WF1 4"THK. CONCRETE FLOORING WITH

3 STB-1 F.F.L./TIE BEAM LEVEL AT EVERY 0.60M. O.C. BOTH WAYS

FTB FTB FTB


WF2
+0.40m
0.18 0.04
WF2 WF2
COMPACTED COMPACTED

0.55 0.40 0.55 GRANULAR


MATERIALS
GRANULAR
MATERIALS

NATURAL GROUND LINE

WF2

2.50 3.50 5.50 FOOTING ON GRADE(F2C2)


SCALE: 1:20 MTRS.

FOOTING TIE BEAM/ WALL FOOTING/STAIR FOOTING

FOUNDATION PLAN FOOTING (F1C1)


SCALE: 1:20 MTRS.

SCALE: 1:100 MTRS. FOOTING SECTION (FIC1)


DESIGNED STRUCTURAL :
SCALE: NDTS

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOUNDATION PLAN ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF TYPICAL FOOTING PLAN DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING TYPICAL FOOTING SECTION
COLUMN SCHEDULE
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-5
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
FOOTING SCHEDULE DATE: DATE: DATE: DATE:
SCHEDULE OF FOOTING
FOOTING FOOTING DIMENSIONS (MM) REINFORCEMENT REMARKS
MARK LENGTH WIDTH DEPTH THICKNESS SPACING
REBARS

(L) (W) (D) (T) (BOTHWAYS)


BAR-X BAR-Y
SF-1 1200 1000 400 200 180 O.C FOOTING ON FFL
SF-2 1100 1000 250 240 B.W. FOOTING ON GRADE
WF-1 500 250 100 O.C WF ON FFL
WF-2 400 400 200 300 O.C WF ON GRADE

1.00

1.00

0.15 0.20m 0.15 SECTION

WALL FOOTING (WF2) 1.00


SCALE: NTS
0.20

PLAN

FOOTING ON FFL (STF-1)


SCALE: 1:20 MTRS.
0.40

FOOTING ON GRADE (STF-2)


1.00
WALL FOOTING (WF1) DESIGNED STRUCTURAL : SCALE: 1:15 MTRS.
SCALE: NTS

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
FOUNDATION PLAN ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF FOOTING TIE BEAM DETAILS
DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING WALL FOOTING DETAILS RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-6
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
BEAM SCHEDULE
A B C D
2.50 3.50 5.50 BEAM S T E E L R E I N F O R C E M E N T S
DIMENSIONS
SEE STEEL DECK FLOOR BEAM
IN/MM LEFT MIDSPAN RIGTH
STIRRUPS
DETAIL LEVEL MARK REBAR WEB BAR
B2
1 (UNLESS NOTED OTHERWISE)
B1 B1 B H TOP BOTTOM TOP BOTTOM TOP BOTTOM

CB1
2ND FLOOR LEVEL B1 250 350 16 4 3 3 4 4 3 5@50, 10@100, REST@175

3.50

3.50
B1 B1 B1 B1 B1
CB1 2ND FLOOR LEVEL B2 300 400 16 5 4 4 5 5 4 5@50, 10@100, REST@200
CB1
B1 B1 B2 B2 CANTILEVER BEAM CB-1 250 350 16 5 3 5 3 5 3 5@50, 10@100, REST@175
2
DN
ROOF LEVEL RB 200 300 16 2 2 2 2 2 2 3@50, 10@100, REST@150
STAIR LANDING
SLB-1 150 200 16 2 2 2 2 2 2 3@50, 10@100, REST@150
3.50

3.50
B1
OPEN
TO B1 B1 B1 B1 BEAM
BELOW
FOOTING TIE BEAM FTB 300 200 16 4 2 2 4 4 2 5@50, 4@100,3@150, REST@200
B1 B1
3 200 200 250 250
B2
150 250 250 200
B1 B1
0.075m. THICK SLAB W/ 0.075m. THICK SLAB W/
B1
DISTANCE @ 0.15m. BW OC DISTANCE @ 0.15m. BW OC

300

300

350

350

350

350
200

300
2.50 3.50 5.50

FTB FTB STAIRBEAM CB-1 CB-1


TYPICAL FLOOR BEAM/STEEL DECK/CONCRETE CANOPY
BEAM(B1) BEAM(B1) ROOF BEAM(RB)
(LEFT/RIGHT) MIDSPAN (LEFT/RIGHT) MIDSPAN (STB-1) (LEFT/RIGHT) MIDSPAN
SECOND FLOOR FRAMING PLAN L

SCALE: 1:100 MTRS. L/4 L/2 L/4

A B C D
0.05M, 10 @ 0.10M, REST @
0.15M O.C.

2.50 3.50 5.50 0.15

0.20
RB RB RB
3.50

3.50

SUPPORT MIDSPAN SUPPORT


RB RB RB RB

LANDING BEAM(LB) DETAIL


2 SCALE: NTS
RB RB RB
DN
FFL L
3.50

3.50

RB RB RB RB L/4 L/2 L/4


0.30

RB RB RB
3

NGL 5 @0.05M,
0.075m. THICK SLAB W/
SECTION 4 @ 0.10M,
DISTANCE @ 0.15m. BW OC
3 @ 0.15M REST
0.20 @ 0.20M O.C.
2.50 3.50 5.50 0.20
SECTION

FOOTING TIE BEAM (FTB) DETAIL

0.30
TYPICAL ROOF BEAM/ CONCRETE CANOPY
SCALE 1:15M
ROOF BEAM PLAN SUPPORT MIDSPAN SUPPORT
SCALE: 1:100 MTRS. FOOTING TIE BEAM

FOOTING TIE BEAM(FTB) DETAIL


DESIGNED STRUCTURAL : SCALE: 1:20 MTRS.

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ROOF FRAMING PLAN ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-7
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D

SEE STEEL DECK


DETAIL
2.50 3.50 5.50

B2
1
B1 B1

CB1 B C .25

3.50

3.50
B1 B1 B1 B1 B1
CB1

CB1 3.50 2ND FLOOR LINE

.10
B1 B1 B2 B2

.15
2
DN
BEAM-1
3.50

3.50
OPEN
B1 TO B1 B1 B1 B1
BELOW
1 BLOW-UP SECTION
B1 B1
3
B2
STEELDECK
CB1 B1 B1 B1 B1 B1
0.075m. THICK SLAB W/ 0.075m. THICK SLAB W/
B1 150mm THICK STEELDECK
DISTANCE @ 0.15m. BW OC DISTANCE @ 0.15m. BW OC

3.50 3.50 1.88


2.50 3.50 5.50

TYPICAL FLOOR BEAM/STEEL DECK/CONCRETE CANOPY


SECTION
SECOND FLOOR FRAMING PLAN 2
SCALE: 1:100 MTRS.

SPACED @ 0.30M. O.C. B.W.

16 SECOND FLOOR LINE


15 CONCRETE SLAB H: 0.15M.

14
BEAM
13
1.20
12
11 3
10 SPACED @ 0.20m. OC
9
LANDING 8 TOP AND BOTTOM
STEELDECK
SPACED @ 0.10m. OC
7 0.30 CANOPY BEAM-1
GAUGE 22
SEE BEAM DETAIL
6 SPACED AS SHOWN
5 TYPICAL STEEL DECK
4
3 3.50
ISOMETRIC
SCALE: NTS
2
1
TYPICAL STEEL DECK
STEEL DECK FRAMING PLAN
SCALE: 1:50MTRS.

LONGITUDINAL SECTION
1.00

MAIN STAIR DETAILS


SCALE: 1:25 MTRS. DESIGNED STRUCTURAL :

RUBEN A. ABA-A JR.


ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROSANNO GABRIEL D. SANICO
ROOF FRAMING PLAN ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF GIRT DETAILS
DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING FASCIA FRAME DETAILS RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-8
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D A B C D
TOP CHORD, BOTTOM CHORD AND WEB MEMBER
PREFORMED PRE-PAINTED G.I. GUTTER PREFORMED PRE-PAINTED G.I. GUTTER 38mm x 38mm x 6mm ANGLE BAR
4.65 9.95 4.65
1.00 2.65 1.00 8.95 1.00

0.25

0.25
G U T T E R L I N E
FASCIA FRAME-2 @GUTTER LINE FASCIA FRAME-2 @GUTTER LINE
G U T T E R L I N E 0.55 0.55 0.55 0.55 0.55 0.55

8
TOP AND BOTTOM CHORD & TOP AND BOTTOM CHORD &

7
0.
WEB 38mm x 38mm x WEB 38mm x 38mm x

0.90

0.90
6mm ANGLE BAR 6mm ANGLE BAR
GIRT GIRT GIRT GIRT
1 1
12mm x .30 m. TURN BUCKLE 12mm x .30 m. TURN BUCKLE

0.55
FASCIA FRAME-2 @ SIDE FLASHING FASCIA FRAME-2 @ SIDE FLASHING
TOP AND BOTTOM CHORD & TOP AND BOTTOM CHORD &
WEB 38mm x 38mm x WEB 38mm x 38mm x
6mm ANGLE BAR 6mm ANGLE BAR

17
SWAY BRACE SWAY BRACE 17

16 16

TRUSS-1

TRUSS-1

TRUSS-1

TRUSS-1

TRUSS-1

TRUSS-1
15 2"x4"x2mm C-PURLINS NUT AND WASHER SAG ROD 15
7.15

7.15
9.50

9.50
14 14
2 13
16
2 13
16
UPPER AND LOWER ROOF
15 1 2"x4"x2mm 15 1
12 12
C-PURLINS
FASCIA FRAME-1 DETAIL
14 2 14 2
11 11
DN 13 3 DN 13 3 FASCIA FRAME-2 @ SIDE FLASHING
10 10

9
12 4
9
12 4 TOP AND BOTTOM CHORD &
11 5 11 5 WEB 38mm x 38mm x
8

7
10 6
8

7
10 6 6mm ANGLE BAR SCALE: 1:25 MTRS.
6 9 7 6 9 7
TOP AND BOTTOM CHORD &
5 TOP AND BOTTOM CHORD & 5
WEB 38mm x 38mm x
4 WEB 38mm x 38mm x 4
8 6mm ANGLE BAR 8
3 6mm ANGLE BAR @ FRONT FASCIA FRAME-1 3
@ FRONT FASCIA FRAME-1
2 2 TOP AND BOTTOM CHORD & WEB
3 1
GIRT 3 1
GIRT GIRT GIRT 0.30 MEMBER 38mm x 38mm x 6mm ANGLE
BAR
1.20

1.20

0.30
UPPER AND LOWER ROOF
UPPER ROOF LOWER ROOF
ROOF FRAMING PLAN ROOF FRAMING PLAN FASCIA FRAME-2 DETAIL
SCALE: 1:25 MTRS.
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.

3 2 1 0.40mm x 2.44 mm
TOP AND BOTTOM CHORD
38mm x 38mm x 6mm ANGLE BAR
2-38mm x 38 mm x 6mm,
PRE PAINTED SPANISH GUTTER 0.30 42
4.5MM THK. FIBER CEMENT BOARD IN
TOP CHORD, BOTTOM CHORD 0. 38mm x 38mm x 6mm
& WEB MEMBER DISTANCE @ 0.60 BW. OC.
38mm x 38mm x 6mm ANGLE BAR FASCIA FRAME 0.25 ANGLE BAR WEB MEMBER
2" x 4" x 2mm C-PURLINS
Hi-Rib PRE-PAINTED ROOFING G.I SHEET

0.30
4.5MM THK. FIBER
SEE BLOW-UP DETAILS CEMENT FACIA BOARD
0.25 UPPER AND LOWER ROOF

TOP OF BEAM GIRT DETAIL


RB RB SCALE: 1:25 MTRS.
1.20

UPPER AND LOWER ROOF


0.90
4.5MM THK. FIBER CEMENT CEILING BOARD IN
METAL CARRYING CHANNEL (CEILING JOIST)
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm
W/ NUTS and WASHERS ON
12mm THK. BASE PLATE(SEE SPOT DETAILS)
LOWER ROOF
ROOF GUTTER DETAIL .35
5mm THICK STEEL PLATE
SCALE: 1:30 MTRS. .25
TRUSS-2 DETAIL
38mm x 38mm x 6mm ANGLE BAR
SCALE: 1:50 MTRS.

.20
.25
Hi-Rib PRE-PAINTED ROOFING
G.I SHEET 0.40 m x 1090mm x LS
FULL WELDED TO
STEEL PLATE 2.5" STEEL TEKSREW
3 2 1 W/ NUTS AND WASHERS

2-38mm x 38 mm x 6mm,
4.5MM THK. FIBER CEMENT BOARD IN
38mm x 38mm x 6mm ANGLE BAR FASCIA FRAME TOP CHORD, BOTTOM CHORD
0.25 2 mm. X 12 mm. X 50mm. X 100 mm. CEE- PURLINS
12mm THK. BASE PLATE
& WEB MEMBER DISTANCE @ 0.60 BW. OC.
SLOPE >
2" x 4" x 2mm C-PURLINS ANCHOR BOLT 38mm x 38mm x 6mm ANGLE BAR
Hi-Rib PRE-PAINTED ROOFING G.I SHEET W/ NUTS and WASHERS STANDARD NUT AND WASHER
0.35

SEE BLOW-UP DETAILS 5mm THICK STEEL PLATE


0.25 ROOF BEAM 50mm. X 50 mm. CLIP ANGLE WELDED TO
PURLINS & TOP CHORD
RB COLUMN

CONNECTION OF G.I SHEET ROOFING TO PURLINS


TOP OF BEAM BASE PLATE DETAIL
SCALE: NTS
RB RB 0.90

STEEL RAFTER TO ROOF BEAM


4.5MM THK. FIBER CEMENT CEILING BOARD IN
METAL CARRYING CHANNEL (CEILING JOIST) W/ NUTS and WASHERS ON UPPER ROOF CONNECTION DETAIL
12mm x 38mm x 5m x 0.8mm THK. @ 1200mm 12mm THK. BASE PLATE(SEE SPOT DETAILS)
TRUSS-1 DETAIL DESIGNED STRUCTURAL : SCALE: NDS.
SCALE: 1:50 MTRS.
RUBEN A. ABA-A JR.
ENGINEER II
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR BEAM PLAN ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SCHEDULE OF BEAM DATE:
CHECKED / REVIEWED : S
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING BEAM DETAILS
STEEL DECK FRAMING PLAN RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. S-9
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE 9. ROOF DRAIN
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL - RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
SOIL PIPE
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL VENT PIPES
VTR TO SECOND FLOOR
AUTHORITY. - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
TO SECOND FLOOR 2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2% EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
CB CB CB CB
F 1
2
c.o. SOIL PIPE SOIL PIPE
MINIMUM UNLESS OTHERWISE SPECIFIED. THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN
D.S.
D.S. D.S. D.S.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
W.C.
W.C. URI.
2%
SL
LAV. F.D. 2URI.
%
SL
LAV. CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING WASTE - SOIL PIPE LINE
OP OP
ET
OF
.D.
PANTRY
ET
OF
.D.
PANTRY
MATERIALS.
F F
ST 4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE

SOIL PIPE
PROPERLY JOINTED WITH PVC SOLVENT CEMENT

2
1
D 4 EXIT D 4 EXIT 5.

DRAIN WATER SUPPY LINE


U P

U P
F LAV. 6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
R A M P

R A M P
-0.35m LAV. -0.35m

F F.D. 7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS 1
2
W.C W.C
8. CHANGES IN DIRECTION:
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK

TO PUBLIC SEWER
c.o.
45 OR 60 WYE BRANCHES LEGEND:
COMBINATION OF WYE AND 1/8 BEND BRANCHES
SANITARY TEE

TO PUBLIC SEWER
SOIL PIPE LINE

G.V.
HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
WASTE PIPE LINE

WATER SOURCE
LINES

POTABLE
TAP TO
- 45 WYE BRANCHES WATER SUPPLY PIPE LINE
- COMBINATION WYE AND 1/8 BEND BRANCHES
GATE VALVE
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE F FAUCET
- 45 BRANCHES W.C. WATER CLOSET
FD FLOOR DRAIN
LAV. FLOOR DRAIN
PIPE LINE PLUMBING LAYOUT PIPELINE PLUMBING LAYOUT C.O. CLEAN OUT
GROUND FLOOR WATER LINE GROUND FLOOR SANITARY LINE VTR VENT TRU ROOF
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS. CB CATCH BASIN
ST SEPTIC TANK

SOIL PIPE
VTR TO SECOND FLOOR
FROM GROUND FLOOR

c.o.

W.C. W.C. FD FD
W.C W.C.
F F
F LAV.-0.05m -0.05mLAV. F LAV.
-0.05m LAV.
-0.05m

DN DN

PIPE LINE PLUMBING LAYOUT PIPE LINE PLUMBING LAYOUT


SECOND FLOOR WATER LINE SECOND FLOOR SANITARY LINE
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.

DESIGNED :

JUSTIN JOSEPH R. ADRALES


REG. MASTER PLUMBER
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOCATION MAP ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PLUMBING SPEC'S PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF WATERLINE PLUMBING LAYOUT
DATE:
CHECKED / REVIEWED : P
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING SANITARY PLUMBING LAYOUT RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. P-1
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON
LEGENDS MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
PLUMBING SPECIFICATIONS:
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL
BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
MATERIALS.
4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
PROPERLY JOINTED WITH PVC SOLVENT CEMENT
5.

DRAIN
6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
8. CHANGES IN DIRECTION:
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
45 OR 60 WYE BRANCHES
COMBINATION OF WYE AND 1/8 BEND BRANCHES
SANITARY TEE
HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
LINES
- 45 WYE BRANCHES
- COMBINATION WYE AND 1/8 BEND BRANCHES
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
LINE
- 45 BRANCHES
9. ROOF DRAIN
- RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
VENT PIPES
- ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN

WASTE - SOIL PIPE LINE

WATER SUPPY LINE

1
DISTRIBUTION PIPE - 2

WATER LINE PLUMBING LAYOUT SANITARY LINE PLUMBING LAYOUT


ISOMETRIC VIEW ISOMETRIC VIEW LEGEND:
SCALE: 1:100 MTRS. SCALE: 1:100 MTRS.
SOIL PIPE LINE
WASTE PIPE LINE

WATER SUPPLY PIPE LINE


GATE VALVE
F FAUCET
W.C. WATER CLOSET
FD FLOOR DRAIN
LAV. FLOOR DRAIN
C.O. CLEAN OUT
VTR VENT TRU ROOF
CB CATCH BASIN
DESIGNED :
ST SEPTIC TANK

JUSTIN JOSEPH R. ADRALES


REG. MASTER PLUMBER
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOCATION MAP ROSANNO GABRIEL D. SANICO
ARCHITECT I
REGIONAL OFFICE X PLUMBING SPEC'S PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF ISOMETRIC VIEW
DATE:
CHECKED / REVIEWED : P
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING LEGENDS RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. P-2
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
0.60
0.10

2ND FLOOR LINE FLOOR DRAIN

0.60
0.40
TO CANAL
SEAL
HORIZONTAL - HORIZONTAL
50MMDIA. VENT
AT 45-degree WYE
HORIZONTAL - HORIZONTAL
VERTICAL - HORIZONTAL
WYE 1/8 BEND
WYE 1/8 BEND
PIPE TOP VIEW
HORIZONTAL - VERTICAL PIPE HANGER 0.25
SANITARY TEE P - TRAP
SECTION 0.10
REMOVABLE CONC. COVER

NAT. GROUND LINE

TO CANAL
TO CANAL

4" THK. CHB

0.10
0.40
SPACED @ 0.25M O.C.

SECTION
10mm THK. CONC. SLAB w/

PROVIDED BOTHWAYS

CATCH BASIN DETAILS


SCALE: 1:25 MTS.
4.00
2.00 1.00 1.00

OUTLET
PLUMBING SPECIFICATIONS:
0.60 M. x 0.60 M.
MANHOLE
0.60 M. x 0.60 M. 1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL CONFORMED TO THE
MANHOLE
1.30

LATEST EDITION OF 'THE PHILIPPINE PLUMBING CODE". "NATIONAL


BUILDING CODE", AND THE RULES AND REGULATIONS OF THE LOCAL
AUTHORITY.
2. ALL SLOPE FOR ALL HORIZONTAL WASTE LINE SHALL MOUNTAIN 2%
MINIMUM UNLESS OTHERWISE SPECIFIED.
3. ALL SEWER PIPELINES EMBEDDED ON GROUND AND BELOW
CONCRETE SLAB HAD BEEN PROVIDED WITH SAND BEDDING
MATERIALS.
4. ALL SOIL PIPE & WASTE PIPE LINES SHALL BE PVC PIPE AND SHALL BE
PROPERLY JOINTED WITH PVC SOLVENT CEMENT
5.
INLET

PLAN
DRAIN
6. VENT THRU ROOF SHALL BE 0.30M FROM ANY OPENNING
7. ALL FLOOR DRAIN & SINK SHALL BE WITH ITS RESPECTIVE P-TRAPS
4.00 8. CHANGES IN DIRECTION:
HORIZONTAL DRAINAGE LINES TO VERTICAL STACK
2.00 1.00 1.00 45 OR 60 WYE BRANCHES
COMBINATION OF WYE AND 1/8 BEND BRANCHES
SANITARY TEE
HORIZONTAL DRAINAGE LINES TO ANOTHER HORIZONTAL DRAINAGE
LINES
- 45 WYE BRANCHES
0.30

- COMBINATION WYE AND 1/8 BEND BRANCHES


AIR SPACE
VERTICAL DRAINAGE LINES CONNECTING TO HORIZONTAL DRAINAGE
OUTLET LINE
0.30

0.30

- 45 BRANCHES
0.30

0.30

9. ROOF DRAIN
- RAINWATER PIPING SHALL NOT BE USED AS SOIL, WASTE &
DIGESTIVE
1.20

LEACHING VENT PIPES


CHAMBER LEACHING - ROOF DRAINS SHALL BE EQUIPPED WITH STRAINERS
CHAMBER CHAMBER EXTENDING NOT LESS THAN 102MM ABOVE THE SURFACE OF
THE ROOF IMMEDIATELY ADJACENT TO THE DRAIN

10% SLOPE WASTE - SOIL PIPE LINE

0.10 M. THK. SLAB w/ WATER PROOFING

AT 0.40 M. O.C. BOTHWAYS


SECTION
4" THK. CHB WALL w/ INSIDE PLASTER FIN.
WATER SUPPY LINE
HOR. BAR@ EVERY 3RD LAYER OF CHB
w/ WATER PROOFING COMPOUND
1
DISTRIBUTION PIPE - 2

SEPTIC TANK DETAIL DESIGNED :

SCALE: 1:80 MTRS.


JUSTIN JOSEPH R. ADRALES
REG. MASTER PLUMBER
DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOCATION MAP ROSANNO GABRIEL D. SANICO
ARCHITECT I
PLUMBING SPEC'S
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SEPTIC TANK DETAIL,
DATE:
CHECKED / REVIEWED : P
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING GREASE TRAP DETAIL
CATCH BASIN DETAIL RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. P-3
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON P-TRAP DETAIL MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
LEGEND:
S 3W THREE WAY SWITCH CEILING MOUNTED EXHAUST FAN
14 WATTS LED BULB W/ 6" DIA. PORCELAIN HOLDER
RACEWAY CONDUIT CONCEALED IN CEILING
14W LED DAYLIGHT 4" DIA. W/ OUTDOOR LIGHTING FIXTURE EMERGENCY LIGHT OUTLET
EO
GENERAL NOTES 2 X 16 WATTS LED TUBE DAYLIGHT W/ REFLECTOR
RACEWAY CONDUIT CONCEALED UNDER FLOOR
CALL POINT/MANUAL PULL STATION
HOUSING BOX TYPE. PANELBOARD, MARKED AS DP & LPP
1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE W/
THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE,
S SINGLE POLE SWITCH
CKT. BREAKER, RATINGS AS INDICATED CONVENTIONAL SMOKE DETECTOR
REQUIREMENTS OF THE LOCAL POWER COMPANIES, RULES AND REGULATIONS S2 DOUBLE SWITCH, 2 SINGLE POLE SWITCHES
OF THE LOCAL ENFORCING AUTHORITIES. ON ONE-GANG PLATE DUPLEX CONVENIENCE OUTLET, 3-PRONG OR CON
THREE SINGLE POLE SWITCHES ON GROUNDING TYPE 15AMPS, 240 VOLT
2. ALL ELECTRICAL WORKS HEREIN INCLUDED SHALL BE EXECUTED BY A S3 CONVENTIONAL HEAT DETECTOR
ONE-GANG SWITCH PLATE EMERGENCY LAMP, SIMPLEX CONVENIENCE OUTLET, CON
PERSONNEL W/ ELECTRICAL EXPERIENCE UNDER THE DIRECT SUPERVISION OF A EL
FULL TIME LICENSED ELECTRICAL ENGINEER. WORKS SHALL BE NEATLY PLACED, GROUNDING TYPE IS 15AMPS, 240 V
SPEAKER
SECURELY FASTENED AND PROPERLY FINISHED.

3. THE TYPE OF POWER SERVICE SHALL BE 220 VAC, SINGLE PHASE, 60Hz, B 4X4 JUNCTION BOX
2-WIRE PLUS GROUND. SD
FIRE ALARM BELL/SOUNDER STROBE
4. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION
2-1.25 mm2 THHN
OF SERVICE ENTRANCE FOR CONNECTION TO POWER SUPPLY AND MANUAL PUSH BOTTON
COMMUNICATION.

5. ALL MATERIALS SHALL BE BRAND NEW AND SHALL CONFORM W/ THE


PROVISIONS UNDER WRITERS LABORATORIES INC., IN EVERY CASE WHERE SUCH A
DP-2 POWER SOURCE
STANDARD HAS BEEN ESTABLISHED. 40 AT
6. UNLESS OTHERWISE SPECIFIED, ALL ELECTRICAL WIRING INSTALLATION 2P
FOR LIGHTING AND POWER SHALL USE PVC, FOR AUXILIARY SYSTEM USE PVC. THE
2-1.25 mm2 THHN

7. ALL WIRE SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE 2-5.5 mm2 THHN 2-8mm2 THHN
"THHN". THE MINIMUM SIZE FOR LIGHTING AND POWER SHALL BE 3.5 sq.mm. AND 1-3.5 mm2 THHN (G) 1-5.5mm2 THHN
1-25KVA
MANUFACTURED BY PHILFLEX. DISTRIBUTION-TYPE
POLE MOUNTED
8. COLOR CODING OF WIRES AND CABLES SHALL BE AS FOLLOWS; 23KV-138Y/240V
PHASES- BLACK, GROUND- GREEN. 125KV BIL
2ND FLOOR FFL 60CYCLES PER SECOND
9. PROVIDE ADEQUATE AND EFFECTIVE GROUNDING SYSTEM TO ALL
LIGHTING AND POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE
REQUIREMENT.
B SD
10. CONVINIENCE OUTLET FOR GENERAL USE SHALL BE DUPLEX 20AT, 230
VOLTS, GROUNDING TYPE, LIGHT SWITCHES SHALL BE 15AT, 230 VOLTS.

11. ALL OUTLET BOXES SHALL BE GALVANIZE GAUGE NO. 16, DEEP TYPE W/
FACTORY KNOCKOUTS. 2-1.25 mm2 THHN

12. FIRE ALARM DEVICES SHALL COMPLY WITH THE NFPA PROVISIONS AND SHALL DP-1 MDP
BEAR THE "UL" STANDARD MARK.

13. ALL ELECTRICAL PANEL BOARD AND CIRCUIT BREAKERS SHALL BE


60 AT 110 AT FACP
"SQUARE D", BOLT-ON TYPE. 2P 2P
14. ALL ELECTRICAL CIRCUITS SHALL BE WIRED ACCORDING TO THE PANEL 3-5.5 mm2 THHN ALL BREAKERS AND DEVICES ARE NEMA-3R ENCLOSED
2-5.5 mm2 THHN
BOARD LOAD SCHEDULE. 1-2.0 mm2 THHN
1-3.5 mm2 THHN (G)
Monitoring Devices
15. ALL MOUNTING HEIGHTS OF DEVICES SHALL BE AS FOLLOWS:
( SUBJECTS TO ARCHITECT'S APPROVAL PRIOR TO INSTALLATION) ATS Standby Generator Set
A. PANEL BOARD - 1.40 M CENTER OF THE FINISHED FLOOR Main Loads DIESEL DRIVEN
B. SWITCH - 1.40 M ABOVE FINISHED FLOOR TO CENTER OF THE DEVICE Distribution MCB
C. CONVINIENCE OUTLET - 0.30 M ABOVE FINISHED FLOOR TO CENTER OF THE DEVICE Panel
D. INTERCOM OUTLETS. - 1.40 M FROM FINISHED FLOOR TO CENTER OF THE DEVICE. 2-38mm2 THHN
E. CONTROL CABINETS
F. MANUAL STATION
- 1500 MM ABOVE FINISHED FLOOR TO TOP OF ENCLOSURE (VERTICAL)
- 1400 MM ABOVE FINISHED FLOOR TO CENTER OF DEVICE
2-14 mm2 THHN
1-5.5 mm2 THHN (G)
1-8.0 mm2 THHN
3P
3P Normal
Power
Supply
Gen.
G
G. BELL - 200 MM BELOW BEAM OR FINISHED CEILING
ATS BREAKER FLUSHED TYPE
H. EMERGENCY LIGHT - 300 MM BELOW BEAM OR FINISHED CEILING
I. EXIT LIGHT - 150 MM ABOVE DOOR JAMB GND FLOOR FFL
16. THE PLANS AS DRAWN ARE BASED UPON THE ARCHITECTURAL PLANS
AND DETAILS AND SHOWN CONDITION AS ACCURATELY AS POSSIBLE TO
INDICATE THEM IN SCALE. THE PLANS ARE DIAGRAMMATICAL AND DOES NOT
NECESSARILY SHOW ALL FITTINGS NECESSARY TO FIT TO THE BUILDING
CONDITIONS. THE LOCATION OF OUTLETS, APPARATUS AND APPLIANCES SHOWN
ON THE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL BE HELD
RESPONSIBLE FOR THEIR PROPER LOCATION IN ORDER TO MAKE THEM FIT W/ THE
ARCHITECTURAL DETAILS AND INSTRUCTIONS FROM THE ENGINEER'S
REPRESENTATIVE AT THE SITE. POWER
SCALE NTS.
RISER DIAGRAM
DESIGNED :
17. COVER ALL JUNCTION BOXES ( STRICTLY NO EXPOSED WIRE).

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
GENERAL NOTES ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF LEGEND AND SYMBOLS
POWER RISER DIAGRAM
DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-1
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A
LEGEND:
B C D
A B C D 11.50
14 WATTS LED BULB W/ 6" DIA. PORCELAIN HOLDER
1.13 2 X 16 WATTS LED TUBE DAYLIGHT W/ REFLECTOR
2.43 11.50
2.50 3.50 5.50 HOUSING BOX TYPE.
1.20 1.23 2.50 3.50 5.50
14W LED DAYLIGHT 4" DIA. W/ OUTDOOR LIGHTING FIXTURE

1 1 Sa SINGLE POLE SWITCH

1.60
EL

0.60
1

1.60
DP2
Sab DOUBLE SWITCH, 2 SINGLE POLE SWITCHES

3.50
Sa Sa ON ONE-GANG PLATE

3.50
2
DP2
EL THREE SINGLE POLE SWITCHES ON

1.90
Sa Sabc
1.90

ONE-GANG SWITCH PLATE

7.00
EL

7.00
2 S 3W

7.00
THREE WAY SWITCH
7.00

2 S3W Sa
Sab
to
downstair
6.08

switch

5.64
U P

DN
EL RACEWAY CONDUIT CONCEALED IN CEILING
2.30

PEBBLES to
R A M P

3.50
upstair

3.50
switch
Sab
RACEWAY CONDUIT CONCEALED UNDER FLOOR

3.50
Sa 1
DP2 PANELBOARD, MARKED AS DP & LPP
1.20

Sa
EL EL EL
3 3 CKT. BREAKER, RATINGS AS INDICATED

1.88
0.50 1.30

2
1.88

DP2
DUPLEX CONVENIENCE OUTLET, 3-PRONG OR
GROUNDING TYPE 15AMPS, 240 VOLT

EL EMERGENCY LAMP, SIMPLEX CONVENIENCE OUTLET,


3.75 GROUNDING TYPE IS 15AMPS, 240 V
3.75
2.50 3.50 5.50 2.50 6.25 2.75 CEILING MOUNTED EXHAUST FAN
11.50 11.50
EMERGENCY LIGHT OUTLET
EO

GROUND FLOOR LIGHTING PLAN SECOND FLOOR LIGHTING PLAN


N D S N D S

LOCKNUT AND BUSHING

SEE BLOW-UP DETAIL PVC ADAPTER


PVC CONDUIT EMBEDDED

TO NEXT FIXTURE TO NEXT FIXTURE


CEILING SLAB
BOX EXTENSION SADDLE

LIGHTING FIXTURE SUPPORT METALLIC FLEXIBLE CONDUIT

LIGHTING FIXTURE

INSTALLATION DRAWING FOR


EXIT LIGHT DETAIL LIGHTING FIXTURE IN DROP CEILING PINLIGHT SUPPORTS & HANGER DETAIL

ASSORTED DETAILED DRAWINGS


N D S

DESIGNED :

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
LOCATION MAP ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING ASSORTED DETAILED DRAWINGS
ELECTRICAL LEGEND & SYMBOLS
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-2
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D
A B C D 11.50
2.43 11.50
1.13
2.50 3.50 5.50
LEGEND:
1.20 1.23 2.50 3.50 5.50
14 WATTS LED BULB W/ 6" DIA. PORCELAIN HOLDER

1 1 2 X 16 WATTS LED TUBE DAYLIGHT W/ REFLECTOR


HOUSING BOX TYPE.

1.60
0.60
1.60
EO 14W LED DAYLIGHT 4" DIA. W/ OUTDOOR LIGHTING FIXTURE

3.50
3.50
Sa

1.90
SINGLE POLE SWITCH
1.90

EO
0.92 Sab DOUBLE SWITCH, 2 SINGLE POLE SWITCHES

7.00
EO

7.00
2 EO

7.00
ON ONE-GANG PLATE
7.00

2
6.08

5.64
4 THREE SINGLE POLE SWITCHES ON
Sabc
U P

DN
DP1
EO
2.30

PEBBLES ONE-GANG SWITCH PLATE


R A M P

3.50

3.50
S 3W

3.50
THREE WAY SWITCH
3
DP1 EO
EO
1.20

EO RACEWAY CONDUIT CONCEALED IN CEILING

3 3 RACEWAY CONDUIT CONCEALED UNDER FLOOR

1.88
0.50 1.30
1.88

3 4
DP2 DP2
PANELBOARD, MARKED AS DP & LPP

CKT. BREAKER, RATINGS AS INDICATED

3.75 DUPLEX CONVENIENCE OUTLET, 3-PRONG OR


3.75
2.50 3.50 5.50 GROUNDING TYPE 15AMPS, 240 VOLT
2.50 6.25 2.75
11.50 11.50 EMERGENCY LAMP, SIMPLEX CONVENIENCE OUTLET,
EL
GROUNDING TYPE IS 15AMPS, 240 V
CEILING MOUNTED EXHAUST FAN
GROUND FLOOR POWER PLAN SECOND FLOOR POWER PLAN
N D S N D S
EO EMERGENCY LIGHT OUTLET

5/ 16" Hot Dip


Galvanized Steel
1" Dia. Lift Hole at Cover
Center of Cover LEGEND:
Grade
40cm x 40cm x 60m w/ COVER
HAND HOLE w/ 3/4 x 3m COPPER CLAD

CADWELD
Type GT
Ground Rod COPPER CLAD GROUND ROD W/
Hollow Block Connection EXOTHERMIC WELD
40cm X 40cm
X 60 cm

Ground Grid
Conductor

SPECIFICATION:
3/4 Copper Clad 1. THE GROUND RING SHOULD BE IN DIRECT CONTACT WITH THE EARTH AT A DEPTH
Ground Rod
Ground Rod BELOW THE EARTH SURFACE OF AT LEAST 1.0m.
2. INSPECTION PIT WILL BE 40cm x 40cm x 60cm w/ COVER.

EARTH SURFACE.
4. MINIMUM 3/4 OF AN INCH FOR THE COPPER CLAD GROUND ROD.
5. USE CADWELD FOR ALL EXOTHERMIC CONNECTION.

AFTER BONDING OF THE GROUND RING.

DESIGNED :

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
GROUND FLOOR POWER LAYOUT ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SECOND FLOOR POWER LAYOUT
GROUNDING DETAILED DRAWINGS
DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING ELECTRICAL LEGEND & SYMBOLS RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-3
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
SCHEDULE OF LOADS
GROUND DISTRIBUTION PANEL: DP1 FLUSH MOUNTED, ENCLOSURE: NEMA-1 W/ GROUND TERMINAL
CKT. NO. LOAD DESCRIPTION VA LOAD V AT AF POLE kAIC WIRE AND CONDUIT SIZE MAIN DISTRIBUTION PANEL: MDP FLUSH MOUNTED, ENCLOSURE: NEMA-1 W/ GROUND TERMINAL

1 1,000 230 15 50 10 CKT. NO. LOAD DESCRIPTION VA LOAD V AT AF POLE kAIC WIRE AND CONDUIT SIZE
LIGHTING OUTLETS 2

2 1 DP1 9,595 230 60 50 2 10


LIGHTING OUTLETS 1,000 230 15 50 2 10

3 2 DP2 6,866 230 40 50 2 10


CONVENIENCE OUTLET 1260 230 20 50 2 10
3 FACP 2,500 230 30 50 2 10
4 CONVENIENCE OUTLET 1440 230 20 50 2 10

TOTAL CONNECTED LOAD 18,961


5 ACU SPLIT-TYPE 1HP 1,500 230 30 50 2 10

6 ACU SPLIT-TYPE 1HP 1,500 230 30 50 2 10


COMPUTATIONS: FOR MDP SIZE OF AUTOMATIC TRANSFER SWITCH (ATS):
7 ACU TWO SPLIT-TYPE 1HP 1,500 230 30 50 2 10 USE: ENCLOSED MANUAL TRANSFER SWITCH, CIRCUIT BREAKER
TYPE, 250AT 2 POLE-DOUBLE THROW 230V. 60 Hz IN NEMA-3R
STUB-OUT ONLY
8 SPARE 3,000 230 30 50 2 10 IT = 18961WATTS = 82.43AMP
230 V
RECOMMENDED SIZE OF TRANSFORMER:
COMPUTATIONS: FOR DP1 THEREFORE USE: CONNECTED LOAD = 230 X 82.43= 18.958mkVA
OTHER LOAD: CAPACITY @ 1.2 DIV. FACTOR =18.958 kVA (1.2)
PB: SIZE MIAN CIRCUIT BREAKER: =22.75kVA
TOTAL LIGHTING LOAD = 2,000WATTS SPARE @ 80% DF (3000 X 0.8) = 2400 WATTS 110 AT CIRCUIT BREAKER 220V, 60Hz
TOTAL CONVENIENCE LOAD = 2,700 WATTS ACU-1.0 @ 80% DF (4,500 X 0.80) = 3,600 WATTS USE: 1 - 37.5 kVA Oil Immersed Distribution Type-Pole Mounted,
SIZE OF MAIN FEEDER CABLE: 23kV-138Y/240V, 60 cycles per second, Single Phase
TOTAL = 4,700 WATTS TOTAL = 6,000 WATTS
1-5.5mm^2 THHN COPPER WIRE GROUND
APPLYING DEMAND FACTOR: TOTAL LOAD =9,595 WATTS
1ST 3,000W @ 100% DF = 3,000 WATTS
REMAINING @ 35% DF (1,700 x 0.35) = 595 WATTS
TOTAL (L AND CO LOAD) = 3,595 WATTS IT = 9,595WATTS = 41.71AMP
230 V

THEREFORE USE:

SIZE OF CIRCUIT BREAKER:


60 AT CIRCUIT BREAKER 220V, 60Hz
M
SIZE OF FEEDER CABLE:

1-5.5mm^2 THHN COPPER WIRE GROUND


MCB
110AT
SECOND DISTRIBUTION PANEL: DP2 FLUSH MOUNTED, ENCLOSURE: NEMA-1 W/ GROUND TERMINAL
CKT. NO. LOAD DESCRIPTION VA LOAD V AT AF POLE kAIC WIRE AND CONDUIT SIZE

1 LIGHTING OUTLETS 1,100 230 15 50 2 10


MAIN 60AT/60AF, 2P, MAIN40AT/40AF, 2P, 230V
2 LIGHTING OUTLETS 1,200 230 15 50 2 10 MCCB INDUSTRIAL TYPE MCCB INDUSTRIAL TYPE

3 CONVENIENCE OUTLET 1,440 230 20 50 2 10 15 AT 15 AT 15 AT 15 AT


L.O. 1 2 L.O. L.O. 1 2 L.O.
4 CONVENIENCE OUTLET 1,620 230 20 50 2 10

5 ACU SPLIT-TYPE 1.5HP 1,800 230 30 50 2 10

6 ACU SPLIT-TYPE 0.5HP 500 230 30 50 2 10 C.O 3 20 AT 20 AT 4 C.O. C.O 3 20 AT 20 AT 4 C.O

7 SPARE 1,500 230 30 50 2 10

COMPUTATIONS: FOR DP2 S-ACU 5 30 AT 30 AT 6 S-ACU S-ACU 5 30 AT 30 AT 6 SPARE


OTHER LOAD:
PB:
TOTAL LIGHTING LOAD = 2,300WATTS SPARE @ 80% DF (1,500 X 0.80) = 1,200 WATTS
TOTAL CONVENIENCE LOAD = 3,060 WATTS ACU-1.0 @ 80% DF (2,300 X 0.80) = 1,840 WATTS
TOTAL = 5,360WATTS _____________________ S-ACU 7 30AT 30 AT 8 SPARE S-ACU 7 30 AT 30 AT 8 SPARE
3,040 WATTS
APPLYING DEMAND FACTOR:
1ST 3,000W @ 100% DF = 3,000 WATTS TOTAL LOAD =6,866 WATTS BUS BAR COPPER GROUND BUS BAR COPPER GROUND
REMAINING @ 35% DF (2,360 x 0.35) = 826 WATTS TERMINAL TERMINAL

TOTAL = 3,826 WATTS


IT = 6,866WATTS =29.85AMP
230 V GROUND WIRE GROUND WIRE

THEREFORE USE: (COPPERWELD) W/ HEAVY DUTY CLAMP (COPPERWELD) W/ HEAVY DUTY CLAMP

SIZE OF CIRCUIT BREAKER:


40 AT CIRCUIT BREAKER 220V, 60Hz

SIZE OF FEEDER CABLE: SINGLE LINE DIAGRAM


N D S
1-5.5mm^2 THHN COPPER WIRE GROUND

DESIGNED :

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
ELECTRICAL SCHEDULE OF LOADS ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SINGLE LINE DIAGRAM DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-4
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
ELECTRICAL ANALYSIS
VOLTAGE DROP CALCULATION:
CABLE SIZE AMPACITY
@ V.D #1 (SE TO MDP):
LOAD CURRENT = 87.4A Article 2.10 .2.2 (A)(1)(a) Overcurrent Protection PEC 1 2017 page 43
TO LTG. CIRCUITS
PHASE = 1-PHASE WIRE x5.5, x8 OR x14
VOLTAGE = 230V MAIN LINE: LOCKNUT AND BUSHING
SQUARE BOX PVC ADAPTER
PVC CONDUIT
DISTANCE = 20m (RSC PIPE) I = (18961/ 230) = 82.43 A WIRE SPLICED WITH TO BRANCH TYPE THHN/THWN TO BRANCH
BOLTED TYPE SQUARE BOX CKT. WIRING WIRES CKT. WIRING
= 82.43 x 125% Full Continuous Load PRESSURE CONNECTORS
AND INSULATING TAPE
POWER FACTOR = 0.80 103.03 OR SCREW-ON
PIGTAIL CONNECTORS
EQUIPMENT
THEREFORE, AS PER PEC MINIMUM REQUIREMENT LEAVE ENOUGH SLACK ULLISTED INSULATED
GROUND WIRE CEILING SLAB
WIRE CONNECTOR
USE NOT LESS THAN 38MM 2 THHN/THWN STRANDED WIRE OR TWIST-WITH
LOCK CONNECTOR FIXTURE WIRES TYPE AF
= 87.4A x [(0.01282 x 0.80) + (0.00202 x 0.60)] TO LIGHTING FIXTURE
PVC CONDUIT
= 1.002V FEEDER 1:
NEW VOLTAGE = 230V - 1.002V = 228.998V COVER
TO LIGHTING PANELBOARD
VD% = [1 - (228.998V/230V)] x 100 = 0.435% I = (9595/ 230) = 41.71 A BRANCH CIRCUIT BREAKER
WIRE SIZE x3.5 SPLICING CONNECTION BLOW-UP DETAIL
= 41.71 x 125% Full Continuous Load
@ V.D #2 (MDP TO DP2): = 52.13 A

LOAD CURRENT = 47.2A


WIRE SPLICED DETAIL FOR BRANCH
THEREFORE, AS PER PEC MINIMUM REQUIREMENT CIRCUIT WITH DIFFERENT WIRE SIZES
PHASE = 1-PHASE USE NOT LESS THAN 14MM 2 THHN/THWN STRANDED WIRE
VOLTAGE = 228.998V (NEAR PANELBOARD LOCATION)
FEEDER 2:

POWER FACTOR = 0.80 I = (6866/ 230) = 29.85 A


= 29.85 x 125% Full Continuous Load
= 37.31 A
= 47.2A x [(0.0156 x 0.80) + (0.000833 x 0.60)]
= 0.612V THEREFORE, AS PER PEC MINIMUM REQUIREMENT
USE NOT LESS THAN 8MM 2 THHN/THWN STRANDED WIRE
NEW VOLTAGE = 228.998V - 0.612V = 228.386V
VD% = [1 - (228.386V/228.998)] x 100 = 0.267% LOCKNUT AND BUSHING

DP2 CIRCUIT # 2, LIGHTING: SEE BLOW-UP DETAIL PVC ADAPTER


SUMMARY: PVC CONDUIT EMBEDDED
% VOLTAGE DROP FROM TRANSFORMER - LPP - I = 1200/ 230 = 5.21 A
BRANCH CKT. # 2 = 5.21 x 1.25 TO NEXT FIXTURE TO NEXT FIXTURE
CEILING SLAB
TOTAL VDROP = 1.002 + 0.612 = 1.614V = 6.51 A BOX EXTENSION SADDLE

TOTAL VDROP PERCENT = (1.614/230) x 100% = 0.7017% LIGHTING FIXTURE SUPPORT METALLIC FLEXIBLE CONDUIT
THEREFORE, AS PER PEC MINIMUM REQUIREMENT
OVER CURRENT PROTECTION USE NOT LESS THAN 3.5MM 2 THHN/THWN STRANDED WIRE LIGHTING FIXTURE

Article 2.10 .2.2 (A)(1)(a) Overcurrent Protection PEC 1 2017 page 43 DP2 CIRCUIT # 4,CONVENIENCE OUTLET: INSTALLATION DRAWING FOR
LIGHTING FIXTURE IN DROP CEILING PINLIGHT SUPPORTS & HANGER DETAIL
LIGHTING & POWER PANEL, MAIN CB: I = 1620/ 230 = 7.04 A
I = (18961/ 230) = 82.43A = 7.04 x 1.25
= 82.43 x 125% Full Continuous Load = 8.8 A
= 103.03 A
THEREFORE, AS PER PEC MINIMUM REQUIREMENT
THEREFORE, PEC MINIMUM REQUIREMENT USE NOT LESS THAN 5.5MM 2 THHN/THWN STRANDED WIRE
CIRCUIT BREAKER , USE NOT LESS THAN 110AT/110AF, 2POLE,10KAIC
INDUSTRIAL TYPE MCCB AIR CONDITIONING UNIT: (FOR PROVISION)

LIGHTING & POWER PANEL, DP2 CIRCUIT # 2, LIGHTING: I = 1800/ 230 = 7.82 A
= 7.82 x 1.25
I = 1200/ 230 = 5.21 A = 9.775 A
= 5.21 x 1.5
= 7.815 A THEREFORE, AS PER PEC MINIMUM REQUIREMENT
USE NOT LESS THAN 5.5MM 2 THHN/THWN STRANDED WIRE
THEREFORE, PEC REQUIREMENT MINIMUM
CIRCUIT BREAKER , USE 15AT,50AF,2POLE,10KAIC MCCB FOR GROUND WIRE:

LIGHTING & POWER PANEL, DP2 CIRCUIT # 4,CONVENIENCE OUTLET: Article 2.50. Table 2.50.6.13 Minimum Size Equipment Grounding
Conductors for Grounding Raceway and Equipment
I = (1620/ 230) = 7.04 A
= 7.04 x 150% Full Continuous Load FOR CONDUIT SIZING:
= 10.56 A SMOKE/ HEAT DETECTOR SUSPENDED CEILING MOUNTED
THEREFORE, PEC REQUIREMENT
CIRCUIT BREAKER, USE 20AT/20AF, 2POLE,10KAIC MCCB

LIGHTING & POWER PANEL, AIR CONDITIONING UNIT: (FOR PROVISION)

I = 1800/ 230 = 7.82 A


= 7.82 x 1.5 ASSORTED DETAILED DRAWINGS
= 11.73 A N D S

THEREFORE, PEC REQUIREMENT MINIMUM


CIRCUIT BREAKER, USE 30AT/50AF,2POLE,10KAIC MCCB

DESIGNED :

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
ELECTRICAL ANALYSIS ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF ELECTRICAL ASSORTED DETAILED DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-5
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
ILLUMINATION LEVEL LIGHTNING ROD ARRESTER

LIGHTNING ROD
MOUNTING BASE

EARTH DOWN CONDUCTOR


LED LUMENS CHART (High Voltage Shielded Cable)

LED LAMP
EQUIVALENT LUMENS F F F F
WATTAGE

15 1400 W1 W2 W2 W2 D 3

32 2600
F F F F

CONDUCTOR STRAP

MINSURO
ADMINISTRATIVE D 1 W2 W2 LIGHTNING STRIKE
BUILDING RECORDER
BARANGAY MINDAGAT, MALITBOG, BUKIDNON

GROUND ROD CLAMP


GROUND FLOOR GROUND ROD CLAMP
EARTH ENHANCING COMPOUND EARTH ENHANCING COMPOUND

ROOM NUMBER OF LIGHTING ILLUMINATION GROUND ROD GROUND ROD


AREA DESCRIPTION AREA LAMPS LUMENS LEVEL
m2 15W 32W EQUIVALENT (LUX)

1 8.2 1 0 1400 170.73


PORCH

18.61
GROUNDING PROTECTION SYSTEM
2 WAITING AREA 4 0 5600 300.91 N D S
LIGHTNING PROTECTION SYSTEM
3 TREASURER'S OFFICE 10.6 3 0 4200 396.22 N D S

4 SECRETARY OFFICE 10.6 3 0 4200 396.22


5 BRGY. CAPTAIN OFFICE 14.84 0 3 7800 525.60
6 PANTRY 4.62 1 0 1400 303.03

7 STORAGE 2.64 1 0 1400 530.30


IMPORTANT
8 PWD COMFORT ROOM 3.22 1 0 1400 434.78

9 RAMP 9.98 2 0 2800 280.56

9 TOILET 2.3 1 0 1400 608.69

SECOND FLOOR
ROOM NUMBER OF LIGHTING ILLUMINATION
AREA DESCRIPTION AREA LAMPS LUMENS LEVEL
m2 15W 32W EQUIVALENT (LUX)

1 OFFICE 1 34.45 9 0 12600 365.74

2 CONFERENCE ROOM 22.50 6 0 8400 373.33

3 OFFICE 2 6.76 2 0 2800 414.20

4 COMFORT ROOM 4 2 0 2800 700

5 STAIRWAY 8.05 2 0 2800 347.82

7 FIRE EXIT 6.37 2 0 2800 439.56

COMPUTATION FORMULA:

LIGHTING LUMENS = NUMBER OF LAMPS x EQUIVALENT LUMENS PER LAMP

LIGHTING LUMENS
ILLUMINATION LEVEL = _____________________ LIGHTNING ARRESTER DETAILS
ROOM AREA N D S
LIGHTNING PROTECTION GROUNDING DETAILS
N D S

DESIGNED :

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
LIGHTNING PROTECTION SYSTEM PLAN ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF AND LAY-OUT
LIGHTNING ARRESTER DETAILS
DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. E-6
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D A B C D
2.43 11.50 11.50
1.13
1.20 1.23 2.50 3.50 5.50 2.50 3.50 5.50

1 1 LEGEND:

0.60
1.60

1.60
TO
FACP

3.50
SD -CALL POINT/MANUAL PULL STATION

3.50
CON
to Fire Alarm SD SD
CON CON

1.90
Control Panel

1.90
SD SD
CON CON
-CONVENTIONAL SMOKE DETECTOR

7.00
B
0.92
7.00

7.00
2

7.00
to Fire Alarm 2 M A
CON
6.08

M
B
Control Panel SD

U P

5.64
TO CON
2.30

A
DN
PEBBLES
FACP -CONVENTIONAL HEAT DETECTOR
R A M P

3.50
CON

3.50

3.50
SD SD SD
CON CON CON
SD -SPEAKER
1.20

SD CON
CON

3 3 -4X4 JUNCTION BOX


0.50 1.30
1.88

1.88
-FIRE ALARM BELL/SOUNDER STROBE

-MANUAL PUSH BOTTON


3.75
2.50 3.50 5.50 3.75
11.50 2.50 6.25 2.75
11.50

GROUND FLOOR FIRE ALARM SYSTEM PLAN SECOND FLOOR FIRE ALARM SYSTEM PLAN
N D S N D S

in 25 mm. dia. EMT


2nd flr. CEILING LN.
eolr
SD SD

in 15 mm. dia. EMT


Mezzanine CEILING LN.
PB

B
A

ZONE 1D

in 15 mm. dia. EMT


Ground Floor
SD

FACP
3 ZONES
MANUAL STATION & BELL/ HORN MOUNTING DETAIL
FIRE ALARM RISER DIAGRAM
FDAS SYSTEM LAY-OUT N D S
ELPD-18

N D S

DESIGNED :
FIRE ALARM ASSORTED DETAILS
N D S

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOCATION MAP ROMY S. BANTOLIO
ENGINEER I
GROUND FLOOR FIRE ALARM SYSTEM PLAN
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF SECOND FLOOR FIRE ALARM SYSTEM PLAN
DATE:
CHECKED / REVIEWED : E
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING FDAS SYSTEM LAY-OUT PLAN
FIRE ALARM RISER DIAGRAM RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. EcE-1
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON FIRE ALARM ASSORTED DETAILS MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ELECTRICAL LEGEND & SYMBOLS ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE:
A B C D A B C D LEGEND:
11.50
2.43 11.50 1.13 14 WATTS LED BULB W/ 6" DIA. PORCELAIN HOLDER PANELBOARD, MARKED AS DP & LPP
1.20 1.23 2.50 3.50 5.50 2.50 3.50 5.50 2 X 16 WATTS LED TUBE DAYLIGHT W/ REFLECTOR
HOUSING BOX TYPE. CKT. BREAKER, RATINGS AS INDICATED
1 1 14W LED DAYLIGHT 4" DIA. W/
OUTDOOR LIGHTING FIXTURE DUPLEX CONVENIENCE OUTLET, 3-PRONG OR

0.60
1.60

1.60
GROUNDING TYPE 15AMPS, 240 VOLT
5 Sa SINGLE POLE SWITCH

3.50

3.50
DP1 EL EMERGENCY LAMP, SIMPLEX CONVENIENCE
Sab DOUBLE SWITCH, 2 SINGLE POLE SWITCHES
1.90 OUTLET, GROUNDING TYPE IS 15AMPS, 240 V

1.90
ON ONE-GANG PLATE
THREE SINGLE POLE SWITCHES ON CEILING MOUNTED EXHAUST FAN
Sabc

7.00

7.00
7.00

7.00
2 2 ONE-GANG SWITCH PLATE
6.08

6
EMERGENCY LIGHT OUTLET
U P
DP1
S 3W

5.64
DN THREE WAY SWITCH EO
2.30

R A M P PEBBLES

3.50
3.50

3.50
RACEWAY CONDUIT CONCEALED IN CEILING
7 RACEWAY CONDUIT CONCEALED UNDER FLOOR
DP1
1.20

3 3
0.50 1.30
1.88

1.88
5 6
DP2 DP2

3.75
2.50 3.50 5.50 3.75
11.50 2.50 6.25 2.75
11.50

GROUND FLOOR AIR-CONDITION LAY-OUT SECOND FLOOR AIR-CONDITION LAY-OUT


N D S N D S

AIR CONDITION CALCULATION


GROUND FLOOR: SECOND FLOOR: SECOND FLOOR:
GROUND FLOOR: GROUND FLOOR:
DP1 (7): DP2 (5): DP2 (6):
DP1 (5): DP1 (6):
ROOM SIZE=10.6 sq.m ROOM SIZE= 22.5 sq.m ROOM SIZE= 8.415 sq.m
ROOM SIZE=14.84 sq.m OOM SIZE=10.6 sq.m
REQUIRED COOLING CAPACITY: REQUIRED COOLING CAPACITY: REQUIRED COOLING CAPACITY:
REQUIRED COOLING CAPACITY: REQUIRED COOLING CAPACITY:
=(Room size x 500) x (110%) =(Room size x 500) x (110%) =(Room size x 500) x (110%)
=(Room size x 500) x (110%) =(Room size x 500) x (110%)
+ additional occupant + lighting + additional occupant + lighting + additional occupant + lighting
+ additional occupant + lighting +additional occupant + lighting
=(10.6 x 500) x (1.10) + (45x3.6) =(22.5 x 500) x (1.10) + (84 x3.6) =(8.415 x 500) x (1.10) + (30 x3.6)
=(14.84 x 500) x (1.10) + (96 x3.6) =(10.6 x 500) x (1.10) + 45 x3.6)
= 5992 kJ/h = 12,677.4 kJ/h = 4,736.25 kJ/h
= 8,507.6 kJ/h =5992 kJ/h
RECOMMENDED MODEL: 1.0 HP RECOMMENDED MODEL: 1.5 HP RECOMMENDED MODEL: 0.5 HP
RECOMMENDED MODEL: 1.5 HP RECOMMENDED MODEL: 1.0 HP

180

100

DESIGNED :
ASSORTED DETAILED DRAWINGS
N D S

PROFESSIONAL ELECTRICAL ENGINEER


DATE:
DRAWN :
PROJECT AND LOCATION : SHEET CONTENTS : SUBMITTED : RECOMMENDING FOR APPROVAL : APPROVED : SET NO. SHT. NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMY S. BANTOLIO
LOCATION MAP ENGINEER I
REGIONAL OFFICE X PDS
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
CONSTRUCTION OF GROUND FLOOR AIR-CONDITION LAYOUT
SECOND FLOOR AIR-CONDITION LAYOUT
DATE:
CHECKED / REVIEWED : M
DICKLUM, MANOLO FORTICH, BUKIDNON MULTI-PURPOSE BUILDING ELECTRICAL LEGEND & SYMBOLS
AIR-CONDITION CALCULATION
RYAN CAESAR B. FERNANDEZ ROMULO F. ANDRES, AEr. RONALDO C. PAHANG, AEr. M-1
BARANGAY LINDABAN, MANOLO FORTICH, BUKIDNON MCKENLY B. HONG ENGINEER II ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2023
ENGINEER II OIC - PLANNING AND DESIGN SECTION, CHIEF
DATE: DATE: DATE: DATE: