You are on page 1of 1

2500mm [8'-2"] 8300mm [27'-3"] 8600mm [28'-3"] 8600mm [28'-3"] 2100mm [6'-11"] 3007mm [9'-10"]

8000mm [26'-3"] 8000mm [26'-3"] 8000mm [26'-3"] 300mm [1']

BACK BATTER 1:6


2800mm [9'-2"] 100mm [4"]
PARAPET 750 mm HIGH
ABUTMENT 200mm [8"]
250mm [10"]
250mm [10"]
1400mm [4'-7"] 100mm [4"]
PIER 600

ROADWAY = 6500
3650mm [12'] 3250mm [10'-8"]
WHEEL GUARD 200 mm 200mm
1000mm [3'-3"]

CENTER LINE
7300mm [23'-11"] 6500mm [21'-4"]

8000mm [26'-3"] 20mm WIDE EXPENSION GAP

1000mm [3'-3"] 305mm [1']

400mm [1'-4"]

800mm [2'-7"] 200mm [8"]


2400mm [7'-10"] 3007mm [9'-10"]
R650mm [R2'-2"]
R550mm [R1'-10"] 600mm [2']

R300mm [R1']

MASONARY OFFSETS 100mm TOP PLAN


400mm THICK RETURN WALL

FOUNDATION PLAN

SCALE 1mm = 100mm U Zin Tun Naing


Instructor , B.E(civil)
TU (Pathein)