You are on page 1of 6

DATOS

p 300
D 12500
dias habiles 250
d 50
H 2
S 30

a)

Q= 670.8204
𝑄∗=√(2𝐷𝑆/(𝐻(1−𝑑/𝑝)))

b)
C= 18.6339
𝐶𝑜𝑟𝑟𝑖𝑑𝑎𝑠=𝐷/𝑄

c)
M= 559.017
𝑀=𝑄(1−𝑑/𝑝)
d)

e)
CT= 1229.83739
𝐶𝑜𝑠𝑡𝑜 𝑇𝑜𝑡𝑎𝑙=𝐷/𝑄×𝑆+𝑄/2×𝐻
DATOS
dd 300
D 12000
p 100
P 1
S 50
H 0.1
d 40

a)
4472.13595
𝑄∗=√(2𝐷𝑆/(𝐻(1−𝑑/𝑝)))

b)

𝐶𝑇𝑚=(𝐻×𝑄)/2(1−𝑑/𝑝)134.164079

c)

𝐶𝑇𝑝=𝐷/𝑄×𝑆 134.164079

d)
12268.3282
𝐶𝑇=𝐶𝑡𝑚+𝐶𝑡𝑝+𝑃𝐷
DATOS
D 10000
S 40
H 0.6
p 500
d 50

a)
1217.16124

𝑄∗=√(2𝐷𝑆/(𝐻(1−𝑑/𝑝)))

b)
1095.44512
𝑀=𝑄(1−𝑑/𝑝)
c)
8.21583836
𝐶𝑜𝑟𝑟𝑖𝑑𝑎𝑠=𝐷/𝑄

d)
328.633535
𝐶𝑇𝑚=(𝐻×𝑄)/2(1−𝑑/𝑝)

𝐶𝑇𝑝=𝐷/𝑄×𝑆 328.633535

𝐶𝑇=𝐶𝑡𝑚+𝐶𝑡𝑝 657.267069
DATOS
D 8000
p 200
H 50
d 400
dias año 250
S 120
Q 400

a)
152
𝑄∗=√(2𝐷𝑆/(𝐻(1−𝑑/𝑝)))

b)
corridas 20

Dias 12.5

c)

𝐶𝑇𝑝=𝐷/𝑄×𝑆 6315.78947