Duration Finish
Duration Start Finish
Galian
Passageway
Length (m') Width (m') Depth (m') Vol (m3) Total Vol.Passageway 3Excavation Vol (m3)
Section 1 : 28.00 10.10 10.30 2912.84 9086.20 26431.53
Section 2 : 55.74 10.50 8.57 5013.81
Section 3 : 14.91 10.10 7.70 1159.55
East Momen
Length (m') Width (m') Depth (m') Vol (m3)
136.80 16.47 7.70 17345.33
West Momen
Length (m') Width (m') Depth (m') Vol (m3)
86.76 15.23 7.70 0.00
1 Section 1 -2
5889.964
2 Section 3 -4
Depth 3 7600 mm 7.6 M 5311.993
Depth 4 7600 mm 7.6 M
Length 3-4 58735 mm 58.735 M
Width 11900 mm 11.9 M
3 Section 5 Dierct to Entance 4
Length 5 26844 mm 26.844 m 0
Depth 5 6400 mm 6.4 m
Width 11000 mm 11 m
4 Section 6 (Entrance 4)
Area 491742192.8726 mm2 491.7422 m2 0
Depth 6 10000 mm 10 m
5 Section 7 (Direct to storage service room)
Length 5 21210.6 mm 21.2106 m 1357.478
Depth 5 6400 mm 6.4 m
Width 10000 mm 10 m
4 Section 6 (Entrance 4)
Area 108248485.6514 mm 108.2485 m2 0
Depth 6 10000 mm 10 m
TOTAL 12559.44