Answers:
Answers:
(1) Ohms.
(2) Voltage and current.
(3) (OD – ID)/2
(4) Megger
(5) Amperes
(6) R22
(7) Anode and Cathode.
(8) Infrared Thermometer
(9) Air Velocity
(10) Unlimited
(11) Returning materials to Stores Department.
(12) 12
(13) HP cutout
(14) Hydrometer
(15) Energy efficient
(16) R134a
(17) 30 days
(18) Series
(19) Six
(20) S1302
(21) 1100Ah
(22) VRLA
-5-
(23) Farads
(24) Lux meter
(25) R1 + R2
(26) R1.R2/(R1 + R2)
(27) Across/parallel
(28) 230V
(29) Resistance
(30) Micrometer
(31) H Class
(32) Vernier Calipers
(33) 1.
(34) electronic ballast
(35) non-generation
(36) Sulphuric acid
(37) 400A
(38) 2 Nos., 25KW
(39) Kapurthala
(40) increase
(41) 1000 mm
(42) clearance
(43) C122
(44) Tons
(45) 1.0 KW
(46) Four months
(47) One set
(48) 7 tons
(49) 10 Amps.
(50) 14mm
(51) 16 mm
(52) 290 mm
(53) 247mm
(54) 228 mm
(55) 5250 watts
(12) A 2 ohms resistor when 1 ampere current is passed will dissipate a power of
(a) 2 watts (b) 4 watts
(c) 0.5 watts (d) 0.25 watts
(18) When 2 Nos. of 5 ohms resistors are connected in series, the effective resistance is
(a) 5 ohms (b) 7 ohms
(c) 2.5 ohms (d) 10 ohms
(40) The minimum speed for full output of 25KW KEL alternator is
(a) 100 rpm (b) 400 rpm
(c) 2500 rpm (d) 800 rpm
(44) The gap between the two parts of axle pulley after tightening should not be less
than
(a) 1 mm (b) 2 mm
(c) 3 mm (d) 4 mm
(53) Which are the following test to be conducted before connecting a wiring to main
line
(a) IR test (b) Continuity test
(c) Polarity test (d) all above.
(60) Under worst weather conditions, the insulation resistance value with 500V
megger between winding and earth for 110V BG AC coach alternator should not
be less than
(a) 0.5 megohms (b) 1.0 megohms
(c) 2.0 megohms (d) 20 megohms
(61) Under worst weather conditions, the insulation resistance of cables to earth with
500V megger in BG AC coach in megohms should not be less than
(a) 0.5 megohms (b) 1.0 megohms
(c) 2.0 megohms (d) 10 megohms
- 11 -
(62) The safest value of current the human body can carry more than 3 seconds is
(a) 15 mA (b) 25 mA
(c) 35 mA (d) 9 mA
(63) Which of the following precaution after switching off power supply is to be taken
if a man suffers from electric shock and unconscious
(a) call a doctor
(b) make him to lie on the ground
(c) provide him glucose
(d) lie him down on the ground and start artificial respiration till a doctor comes.
(67) The voltage setting of AC coach Regulator at 50% of full load current in the test
bench is
(a) 127 V (b) 124 V
(c) 130 V (d) 120 V
(70) Insulation resistance value of AC coach measured with 500V megger in fair
weather condition should be minimum
(a) 10 megohms (b) 100 megohms
(c) 0.5 megohms (d) 2 megohms
(72) During replacement of RMPU AC compressors, for leak test pressure charge the
system is done with
(a) R22 (b) R134 a
(c) Hydrogen (d) Nitrogen
- 12 -
(78) Standard Form No. _______ is issued for imposing minor penalties to a Railway
Servant
(a) 5 (b) 7
(c) 11 (d) 10
(79) Standard Form No. ______ is issued for imposing major penalties to a Railway
Servant
(a) 5 (b) 7
(c) 11 (d) 10
(80) Length of indicator plate for 25 KW alternator tension rod with 16 mm spring
(a) 290 mm (b) 295 mm
(c) 270 mm (d) 310 mm
Answers :
(1) What is the testing procedure for OHP cutout, HP cutout and LP cutout in
an AC coach?
Switch “ON” the heaters with blower off (take out blower fuses and short the
vane relay terminals). Keep the package in manual heating mode. The heaters should
trip.
TESTING OF HP cutout:
Switch “ON’ the compressor with condenser fan OFF. Take out the condenser
fan motor fuses. Keep the package in manual cool mode. Compressor should trip in 3
minutes. HP cut-outs should be reset after each trip.
TESTING OF LP cutout:
Switch “ON” the compressor and condenser with blower OFF. Take out
the blower motor fuses and short the vane terminals (44-45). Keep the package in
manual cool mode. Compressor should trip in 3 minutes.
- 15 -
The Electronic Rectifier cum Regulator Unit (ERRU) employs IGBT with
driver circuit for control of field excitation. The ERRU consists of the following
units.
1 Field Rectifier Unit
2 ISO pack power diodes
3 Static OVP
4 Hall effect sensor
5 Universal Voltage controller (UVC)
For re-lubrication of 7312 BECBJ bearing, remove fan cover, end shield
and bearing covers. Now the bearings are accessible. Remove the old grease
completely thoroughly washing the bearings with white spirit and fill with new
grease. For re lubrication of NU 312 Roller bearings, remove the bearing cover
and take out the outer race along with the housing from inner race fitted on the
shaft. Now the bearing is accessible. Remove the old grease completely by
thoroughly washing the bearing with white spirit and apply new grease. The type
and quantity of grease to be used is given in the table.
(4) What is the necessity and importance of Crank Case heaters in a RMPU AC
coach?
(5) What are the functions of rotary switches provided in RMPU AC coach
panel?
(7) What is the POH attention given for Alternator Terminal Box?
Loosen captive screw of cover and open the cover. Check if the terminal
block is modified one if old type, replace with modified type.
Check for any damage of terminal board, replace if necessary
Check the condition of incoming/outgoing leads if damage, replace the same
or repair the damage leads.
Ensure proper tightness of the terminals.
Clean the terminal box thoroughly.
Check that no hardware has worked loose, replace the damage rusted
fasteners.
A diode conducts in only one direction and offer a very high resistance to
the current in the reverse direction. This phenomenon is used in the testing of
diodes.
(9) How to test insulation resistance of AC coach alternator and RRU. Give
required insulation values.
Insulation resistance test for ac coaches alternator & regulator:
Alternator :
(10) What are the states under Region A, B & C under OL Act?
Region C – States and Union Territories not referred in Region A & B ( i.e
Tamilnadu, Kerala, Karnataka, Andhra Pradesh, Orissa, West
Bengal, Sikkim, Assam, Nagaland, Meghalaya, Arunachal
Pradesh, Goa etc.)
(11) (a) What are the cases where regional language, Hindi, English should be
used?
i. All boards exhibited for the general public.
ii. Forms used by the public
iii. Station announcements.
- 18 -
(b) What are the places where Hindi and English should be used?
1. Rubber stamps.
2. Heading on all file covers and registers.
3. Name badges and photo identity cards etc.
The core of the stator which is completely embraced by the field coils will
retain a residual magnetism if excited by a battery once. The flux produced by the
field coils find its path through the rotor. When the rotor is rotated when driven
by axle on train running through V belts and pulleys, the passage of rotor teeth
and slots alternatively, under the field, offers a varying reluctance path for the
flux produced by the field coils. The flux which vary periodically links with AC
coils and induces an alternating voltage in AC coils. Once starting generation, the
3 phase output voltage from alternator is connected to RRU/ERRU, rectified and
fed back to the field to achieve required level excitation.
The 110V DC output voltage from RRU feeds the coach load and battery
charging.
The alternator consists of two sets of windings viz. AC winding and field
winding both accommodated on the stator. The AC windings are distributed in
the small slots and field windings are concentrated in two slots. Each field coil
span is half of the total number of stator slots.
It has two hermetically sealed three phase compressors, two vertical flow
condenser fans and one blower unit as evaporator fan. Condenser fan motor is of
water proof three phase.
There are two independent refrigerant circuits in each PAC unit having a
compressor, condenser coil and evaporator (cooling) coil. The condenser fans
and evaporator blower are common. Each circuit has its own fresh air and return
air filters. Each evaporator (cooling coil) fits in its own drain pan. Each drain
pan has its own drain outlet.
Any leakage to the metal casing of the equipment due to failure will result
in short circuiting of phase supply with neutral through earth and the large current
makes the fuse to blow off or MCB to trip.
(18) What is the difference between Dry bulb and wet bulb temperature?
Wet bulb temperature is less than the Dry bulb temperature since the water
in the wet cloth while evaporating will take away the latent heat of evaporation
from the sensing bulb.
(21) What are the electrical equipments available in a pantry car? Give with
rating.
1. 2.5 KVA inverter 110V DC/230V AC single phase.
2. Refrigerators about 300 liter capacity
3. Deep freezer 100-120 liter capacity
4. Exhaust fans.
5. Flame Proof Light fittings in gas cylinder room.
Earth leakage test is conducted by double test lamp each with 110V same
wattage bulb. The connection diagram is given in the annexure.
When there is no earth both bulbs will glow to the same brightness. When
there is –ve earth, bulb-A will only glow with full brightness and when there is
+ve earth, bulb-B will only glow with full brightness. Bulbs are marked suitably
- 21 -
with “+ve earthed” and “–ve earthed”. The respective lamp will alone glow with
full brightness if there is earth fault.
(24) What is the function of OVP in a regulator for alternator? When it will
function?
Function of OVP:
OVP will stop the field current of the alternator and stop generation when
overvoltage is generated due to any reason i.e defect/malfunctioning of alternator
or RRU. OVP is connected with RRU to sense the output voltage.
OVP will function only when output voltage exceeds the set voltage of
RRU/ERRU to protect lights, fans and other electrical equipments from damage
to overvoltage. The situation generally occurs when voltage regulation circuit in
ERRU/RRU fails. The trip voltage set for OVP is 145 V. Once tripped, OVP has
to be reset manually.
Proficiency in Hindi :
An employee shall be deemed to possess proficiency in Hindi if he has
passed the matriculation or any equivalent or higher examination with Hindi as
medium of examination.
1. CENSURE
2. Withholding of promotion for a specified period.
- 22 -
3. Recovery from his pay of the whole or part of any pecuniary loss caused
by him to the Government or Railway Administration by negligence or
breach of order.
4. (a) Withholding of Privilege Passes or Privilege Ticket Orders or both.
(b) Reduction to a lower stage in the time scale of pay for a period not
exceeding three years without cumulative effect and not adversely
affecting his pension.
5. Withholding of increments of pay for a specified period with further
directions as to whether on the expiry of such period this will or will not
have the effect of postponing the future increments of pay.
a. Reduction to a lower time scale pay, grade, post or service with or without
further directions regarding conditions of restoration to the grade or post of
service from which the Railway Servant was reduced and his seniority and
pay in such restoration to the grade or post or service.
b. Compulsory retirement.
c. Removal from Service which shall not be disqualification for future
employment under the Government or Railway Administration.
d. Dismissal from service, which shall ordinarily be disqualification for future
employment under the Government or Railway Administration.
ISO 9001 system is for monitoring and maintaining the quality of the
products conforming to the defined level at each and every stage, through various
documents, inspection, checklists.
(29) Find out the total for (1/8) + (3/4) + (1/2) – (1/4)
Solution:
(1/8) + (3/4) + (1/2) – (1/4) = (1 + 6 + 4 -2)/8
= 9/8 = 1 ⅛
Solution:
°F = [° C x (9/5)] + 32
= [45 x (9/5)] + 32
= 81 + 32
= 113° F
- 23 -
Solution:
°C = (° F – 32) x (5/9)
= (104 – 32) x (5/9)
= 40° C
Solution:
Solution:
1 meter = 1000mm
5.03 meter = 5.03 x 1000
= 5030 mm
(33) What are the POH activities for pre-cooling rectifier unit and 25KVA
inverter unit of RMPU AC coach?
Remove and clean the contacts by means of a clean rag soaked in petrol.
Contacts, which are burnt, should be replaced and covered with Vaseline.
Clean the transformer, rectifier and rotary switch. Check for operation; if
defective, change it.
Inverter Unit
Open the front panel door and clean with compressed dry air. In case the
compressed air pressure is too high, cover the nozzle with thin cloth to reduce the
pressure.
Clean the semi-conductor device’s heat sink with compressed air. In case the dust
is not removed completely from fins use hard hairbrush and again blow with
compressed air for cleaning the heat sink.
Check that all connections to PCB are tight and no insulation on cables, boards
and insulator is damaged.
No.WS/Elec/WF Ponmalai
Dt: 09.07.10
AXEE/TL/GOC
====
The firm M/s KEL may be advised to attend the defect or replace the
above 25KW alternator failed under warranty and lying at Train lighting Shop,
Ponmalai.
Sd/-
(M.Muthukumar)
JE/AC/GOC
For SSE/AC/GOC
No.WS/Elec/IOD Ponmalai
Dt: 09.07.10
SSE/AC/GOC
====
finger due to piercing by a screw driver and bleeding severely. He was given
first aid and he has to be sent to Railway Hospital, GOC for treatment.
Necessary IOD form may be issued and two staff working nearby have been
sent for witness signature.
Sd/-
(K.Ramanathan)
JE/AC/GOC
II. Write short notes on any two
Energy sources not used conventionally and in large scale are called
non-conventional energy sources. Conventional energy sources because of
continuous usage are getting depleted for example petroleum products, coal,
natural gas etc.
1. Preparation of indent.
2. Getting signatures of competent authorities.
3. Non-stock certification from stores officers
4. Vetting from finance and approval from CWM/CEE/AGM as per the
schedule of power.
5. Submitting indent to stores
6. Purchase action.
7. Receiving the material.
8. Inspection.
9. Bill certification.
- 26 -
Financial upgradation will be available in the next higher grade pay when
a Railway employee has completed 10 years of continuous service in the same
grade. There shall be three financial upgradations under the MACPs counted
from the direct entry grade on the completion of 10, 20, 30 years of service
respectively.
MACPs envisages merely placement in the next higher grade pay in the
recommended revised pay bands and grade pay. Hence the revised pay under
MACPs may be different to that what is available in next promotion. During
financial upgradation the pay shall be raised by one increment i.e. 3%. After
financial upgradation, if regular promotion is given, there shall be no further
fixation of pay at the time of regular promotion if it is in the same grade pay.
If it is in a post carrying higher grade pay the difference in grade pay is
admissible and no pay fixation is allowed.
- 27 -
III. Draw the power circuit diagram of a RMPU AC coach and explain.
It feeds supply to 2 hermetically sealed R-22 compressors, one double
shaft blower motor and two water proof condenser fan motors designed. Power
supply to these motors as well as two heaters is conveyed at 415 Volts through the
contacts of seven contactors shown in the power circuit diagram. (The magnetic
coils of all contactors are operated at 110 volts AC in the control circuit). The
motors are protected by MCB/fuses and overload relays.
Two crank case heaters receive direct supply from the bus bars through
main supply rotary. In case phase is missing or is reversed in the Incoming
Power, the Negative Sequence Voltage Sensing Single Phasing Preventors
installed in the control circuit will not allow the AC unit to start until abnormality of
such supply is corrected.
IV. What are the salient features of RMPU AC plant and advantages over
conventional under-slung AC plant?
High savings Light in weight, saves fuel for hauling. Weighs 1400 Kg. (as
compared to 2700 Kg. for conventional AC)
Ease in The unit is factory made, assembled & gas charged and tested
Installation for performance prior to delivery. Installation requires simply
lowering the unit in the false ceiling above the toilet are on both
ends of the coach and connecting it to wire harness, drain pipe
and flexible duct. It taken slightly more than 6 hours to air-
condition a coach.
Low down Replacement of the PAC unit can be done in less than four
time hours.
Better The PAC unit remains outside the comfort zone and therefore,
passenger there are no chances of water drip on passengers.
Hygienic Free Fresh air is taken from the roof which air supplies cleaner, fresh,
free of the toilet smell as prevalent in conventional system.
Refrigerant Hermetically sealed system has no fittings or shaft seals, thus
Leak this presents little potential of gas leaks and avoids major break
downs.
Low The unit is almost maintenance free since it uses 3 phase AC
Maintenance motors-no commutators or brushes to wear out.
Rapid Heat Mounted on the roof, thus no dust dissipation collected in
Dissipation condensers, therefore, requires no maintenance or water spraying
on condenser coils, giving rapid and better hear dissipation.
Safe No chance of damage to flash floods, cattle runs or flying
Operation ballast.
Energy Compact and modular with short Refrigerant Efficient pipes,
Efficient thus loss of capacity through longer connecting pipes is
eliminated.
Capacity Use of 4 compressors per coach offer 25% to control 100%
control capacity and standby facility, saving electricity. Compressors
are started through time delay relays to reduce peak current
draw.
- 28 -
V. What are the safety protections provided in RMPU AC coach and give the
function of each.
Safety protections in the control panel of RMPU AC coaches.
Temperature protective Thermostats (OHP) set at 200Deg. C. are
provided on each heating element to switch OFF power to the Heater element in
case the surface temperature of the heater reaches 200 Deg. C.
Electro-Pneumatic Time Delay Relay are provided on each compressor to
ensue delay in starting of each compressor when power is switched “ON” and to
prevent both compressors starting at once.
TWO VANE RELAYS are provided to ensure operation of condenser
fans. Compressors or Heaters only when the air flow is present across the cooling
coils and the heating elements.
High Pressure Safety Cut-out (HP) and Low Pressure Safety Cut-out (LP)
are provided to switch OFF compressor when the High pressure exceeds 420
PSIG or Suction pressure drops below 35 PSIG. The LP cutout is auto reset
where as HP cutout is manual reset type.
Over load Relays with built in single phasing protection are provided to
protect compressor, condenser Fan and Blower motors against single Phasing and
overload.
VI. What are the final testing to be carried out on RMPU AC coach after POH?
Final testing of AC coach after POH
VII. What are the fire prevention measures to be carried out in 110V DC self-
generating coach?
a) The following checks shall be carried out and ensured on wiring of the coaches.
a. There should not be loose cable terminations.
b. All cables should be of right size as per standard designs with fire retardant
properties.
c. All the terminations should be properly terminated with lugs.
d. Materials and equipments used should be of fire retardant quality.
e. The number of joints and junction boxes should be reduced to minimum.
f. Positive and negative cables should be run in separate conduits.
g. The cables should be secured to the coach structure by using cleats at an
interval not exceeding 500mm.
h. The cleats should have non-inflammable property. PVC/FRP cleats only to
be used.
i. Wherever cables traverse through holes and orifices, such openings shall be
provided with PVC/FRP grommets/bushes with non-inflammable property.
j. Damages to cables insulation shall be prevented and attended to
immediately, if any.
k. All the cable terminals and cable lugs should always be provided with heat
shrinkable sleeves. The effort should be made that the stripped portion of
the cable is fully inserted inside the lug gland and is not exposed outside.
This will avoid shorting of the cables at the terminations where the
clearances are critical.
l. The insulating FRLT tape should be as per ICF specification No.
ICF/Elec/921 and RCF specification No. EDTS 174.
m. Provision of fuses both on positive and negative side for all lights and fans
n. Earth checking
o. Coach insulation test
p. Rewiring at the end of codal life.
b) The following checks shall be carried out on protective devices.
a. No protective system shall be in isolated/bypassed condition.
b. It has to be ensured that the correct size and capacity of the fuses and
MCBs are provided for the different loads.
c. The protective devices such as fuses, MCBs etc, must conform to their
relevant specification and shall be of procured from approved sources.
d. Contactless infrared thermometers should be used for detecting the
overheated joints in the terminal boards. This check should be done
during monthly maintenance.
e. FRP trays shall be provided at the bottom of the battery boxes for LMLA
battery.
f. There should be clear warning indication that the laptop/mobile charging
points are meant for charging purpose only and shall not be used for any
other purpose.
- 30 -
IX. What are the documents under OL Act which are to be issued in Hindi,
English bilingual form?
There are 14 documents under Section 3 (3) and they are to be invariably
issued in Hindi – English bilingual form
1. General Orders (Memorandum, Circulars etc.)
2. Rules
3. Notices
4. Notifications
5. Resolutions
6. Administrative and other reports
7. Press communiqués
8. Contracts
9. Agreements
10. Licenses
11. Permits
- 31 -
treated as on duty of workmen and also defines the disablement into different
types with periods for the purpose of paying compensation by the employer i.e
permanent/temporary and partial/total disablement.
The employer shall not be liable for paying compensation under WCA in
respect of any injury which does not result in the total or partial disablement of
workmen for a period not exceeding 3 days. The amount of compensation under
WCA where death results from an injury is an amount equal to 50% if the
monthly wages of the deceased workman multiplied by the relevant factor or an
amount of Rs.90,000/- whichever is more.
The minimum compensation under WCA for permanent total disablement
is Rs.90,000/-.
XII. Draw Air Conditioning System cycle diagram and explain.
The refrigerant gas is compressed by the compressor. This compressing of
gas increases its temperature higher than the outside ambient temperature due to
heat of compression. This hot compressed refrigerant vapour is injected inside
the tubes of the Condenser Coil. Air is blown across the condenser Coil by
condenser fan causing refrigerant to cool down and therefore, condense from
vapour to liquid refrigerant inside the condenser Tubes.
The high pressure condensed liquid refrigerant now flows through an
expansion device and connected with the Evaporator coil.
The other end of the Evaporator coil connected to the suction part of the
Compressor which sucks the refrigerant and drops the pressure inside the
Evaporator coil. Drop in pressure causes evaporation of the liquid refrigerant to
gas which makes the Evaporator coil extremely cold due to heat of vaporization.
Air to be cooled or conditioned is blown across the Evaporator coil by
evaporator blower. The heat from this air is absorbed by the evaporating
refrigerant causing the air to cool down.
The refrigerant gas sucked by the compressor is again compressed to high
pressure and pushed into the condenser coil completing the refrigerant cycle.
XIII. Explain the working principle of any one make of rectifier cum regulator
unit used in AC coaches with circuit diagram
Principle of working principle of 25KW KEL RRU : -
The 3 phase AC output from the alternator is fed to the 3 phase bridge
rectifier (PR) of the RRU and converted it into DC.
The main winding impedance varies when the current in the control
winding varies due to change in magnetic flux towards saturation or otherwise.
The impedance variation of main magnetic windings varies the field current to
achieve desired voltage and current regulation.
XIV. What are POH schedule for Brushless Alternator, RRU, Pulleys, Tension
gear of AC coach?
VISUAL INSPECTION
Carry out visual inspection of the machine and record the following:-
Serial number and name plate particulars of the machine.
Check that rotor rotates freely.
Check alternator tension rod.
ELECTRICAL CHECKS
Carry out the following electrical checks and record the following:-
Open the cover of the terminal box and check whether the internal
termination and terminal board are intact.
Tighten all the connections on the terminal board.
Using a multimeter, check continuity between
Field terminal F+&F-
Stator terminals U&V, V to W and W to U
Check the insulation resistance by 500V megger between
Stator terminals and frame of machine.
Field terminals and frame.
- 34 -
OVERHAULING
The machine received for overhauling should be externally cleaned with wire
brush and wiped before dismantling.
Clean and re-grease the bearing after removing the bearing from the bearing
housing. Only Servo Gem (RR-3) grease shall be used.
While removing and placing the rotor, care should be taken that the rotor does not
rub over the field coils.
If any grease has crept into the stator surface, clean it before assembling.
If stator and rotor parts are found rusty, clean. Apply the insulating varnish (air
drying) of recommended grade. Impregnation of the varnish shall be done in an
air circulated oven.
Change the alternator suspension nylon bushes 100% and change the suspension
pin on condition basis.
After complete fitment and greasing, the bearing noise shall be recorded using
shock pulse meter during running on test bench.
The pulley condition such as wear on V group, pulley key way, shaft way, groove
angle etc. shall b e monitored during POH. Proper gauges shall be used for
checking “V” groove of the pulley and replacing.
TESTING OF ALTERNATORS
Alternator
Regulator
Short all terminal (live parts) together and check the insulation resistance
between the live parts and earth. It should be above 10 megohms.
Note: The insulation resistance of all the above should be measured by 500V
megger.
Check the terminals and inside wires for heating signs and looseness. Blow out
the dust.
Replace the damaged wiring/terminals. The wiring of the regulator shall be done
systematically.
Check the PCB circuit with PCB testing kit or multimeter to identify defective
components. Replace defective components.
V-BELTS/TENSIONING GEAR
The existing V belts shall be replaced with the new V belts 12 Nos. having same
grade/make. The old V belts removed from service are to be destroyed.
Tensioning gear shall be removed and its spring shall be checked for proper
functioning. If required moving parts of tensioning device including spring shall
be replaced.
Check the pulley for slippage, tightness and physical damage to grooves. Ensure
availability of locking nuts and split pins in position. Check the alignment of axle
pulley with the alternator pulley and adjust. Change the rubber packing in axle
pulley.
The pulley shall be replaced after four years period or earlier on condition basis.
- 36 -
XV. What are the final testing to be carried out on under-slung AC coach after
POH.
Check safety chain and tension rod of alternator for proper fitness.
Check refrigeration system for any leakage before charging the gas.
Check control panel and ensure that proper fuses are provided.
Start the plant and check condenser motor, compressor motor, blower motor for
any abnormality.
Check oil level in compressor, the level when operating should be ½ bull’s eye.
Run the plant for four hours. An equivalent heat load (convector heater) should
be kept for performance test of plant.
- 37 -
Run the plants with dynodrive motors for 8 hrs. at different speeds.
Ensure that both the alternators are sharing load equally during run. If not set
both the alternator panels.
General Checks
Feel temperature. Suction should be cold and sweaty. Delivery should be very
hot and liquid line should be warm.
The coach shall be jointly inspected with division’s staff and the performance of
electrical and refrigeration equipment shall be recorded. Any attention to the
given equipment shall be given before dispatch of the coach from workshop.
XVI. What are POH schedule activities for RMPU AC plants in RMPU AC coach?
Pre-Inspection
On arrival to shop, place the coach on the pit line and inspect the electrical and
air-conditioning equipment. Conduct the cooling test. If the cooling time is less
than the specified values, any further attention to refrigeration circuit is not
necessary, except cleaning. Check operation of all protections and note down the
defects and deficiencies.
Lift the roof-mounted unit with the help of 1 ton lifting arrangement as per
procedure and place it on the wheeled trolley to take it to the shop for
overhauling.
With the help of compressed air, remove the dust of the conditioned air duct.
The welded joints of AC package unit structure should be examined carefully for
presence of corrosion and such corroded members shall be replaced/rectified.
Check for accumulation of water in condensed drain pipe and trough outlet
Clean the condensed drain pipe and trough outlet pipe with help of compressed
air. It is also desirable to blow compressed air into the pipe from below, every
two months to avoid any choking of pipe due to accumulation of dust, etc.
OVERHAULING ACTIVITIES
Compressor
There is no need to open the refrigeration system of the AC package units, since it
is completely sealed at factory. Conduct the cooling test. If the time required to
cool the coach is more than the recommended value and it does not decrease even
after cleaning of condenser and evaporator, the compressor will have to be
changed.
Clean the condenser coil and cooling coil with steam of 10 kg/sq.cm. to clean
thoroughly and to remove all dirt and mud thoroughly. This can be done without
removing the coils from their places.
Check the terminals after opening terminal box cover and see for tightness.
Lubricate the motor bearing by approved lubricant use lubricating gun for
greasing.
- 39 -
Check the alignment and re-align the driving and driven shafts.
Check the duct for crack and for loose/missing fixing bolts.
Completely isolate the panel from the power supply and its loads. Contacts of the
contactors shall be removed and cleaned by means of clean rag socked in petrol.
Contacts, which are burnt, should be replaced, after which they should be lightly
covered with silican gel/petroleum jelly.
Similarly, dismantle the contacts of the relays and clean them by means of clean
rage soaked in petrol. Contacts which are burnt should be replaced.
Check whether all connections are tight. If found loose, tighten the same.
Check for defective ammeters and voltmeters, and replace the defective ones.
Check all terminals, terminal marking and ensure that legend plates are intact.
Cutouts
Clean the cover with Petrol and test for correct operation of settings.
XVII. What are the POH activities for fans, lights and wiring in an AC coach?
Dismantle the lower guard, upper guard, blade and fan motor.
Check the blade angle with a measuring gauge. Correct the same if
necessary.
Check the insulation resistance of the fan motor. The IR value should not
be less than 2 mega ohms.
Check the commutator for grooving, pitting marks, ovule, blackness etc.
Skim or polish the commutator as required.
Check the carbon brush and brush spring. Replace by correct grade of
carbon brush as recommended by RDSO. The fan spring should be with
proper tension. Replace the same if necessary.
Apply air drying insulating varnish if IR value of the armature and field
coils is low, give impregnation treatment in an air circulating oven.
Clean the ball bearing, check for noise, replace if necessary or grease it
with recommended grade.
WIRING
Light fittings
The light fittings, reflectors, clear acrylic sheet cover, glass globe, holders,
etc., shall be checked and cleaned. All defective parts shall be replaced.
Anti-theft arrangement for fluorescent light fittings shall be checked.
Coach Insulation
Cable Joints
Surface of copper sockets and bus bars shall be cleaned to remove the
oxide film from the jointing surface before making a bolted joint and shall
be coated with corrosion resistant conducting grease of approved make to
prevent reformation of oxide film.
Fire retardant PVC grommets are to be ensured for all cable entries.
Tighten connections as needed.
*****