Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
use
ISO 45001:2018
COPY RIGHT
No part of this manual may be reproduced in any form by print, photocopy, microfilm, or any other
means wholly or in part or disclosed to any person outside Renfra Power Private Limited without the
written permission of the management.
MUTHURAJ
01 02-01-2022 IMS Manual PRAVINTH.S
PERIYASAMY
Page 1 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
01. No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811, Tamil Nadu, India The
Integrated Management System Manual indexes and incorporates all the procedures referred to the in this Manual.
02. This Integrated Management System Manual is written comprising the following
management systems, namely;
a. ISO 9001: 2015
b. ISO 14001:2015
c. ISO 45001:2018
This Integrated Management System Manual and its contents are the sole property of
Renfra Power Private Limited and shall not be copied or reproduced in full or part without the written consent
of the Managing Director of the Organization.
Page 2 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 3 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 4 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited, we established our company in the year 2017.
With our extreme level of service, we are the fastest-growing company in the renewable energy
sector. We give end-to-end solutions in Both Wind turbines and Solar. We are one of the fastest-
growing service providers in the Renewable Energy Sector. Our Management team has more than 20
years of experience in wind Energy and 5 years of experience in solar energy.
The Company is now established to meet the demands for operation &
maintenance with our highly skilled technicians in the Solar and wind turbines; we provide service to
various KW to MW turbines ranging from 225 KW-1.65 MW. Today we are maintaining 5 major
Different wind farms at a total capacity of 121.6 Mw
We are dedicated to providing our customers with reliable and superior services
which will increase the productivity of the turbines and be profitable to the company with the least
environmental (negative) impact possible.
Page 5 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 6 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Amend. Revision No
Doc.code Change details Originated by Date
No From To
Page 7 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
internal issues that are relevant to its purpose and its strategic
direction and that affect its ability to achieve the intended
result(s) of its Quality, Environmental, Health & safety
management system by doing periodical review through
Management review meetings, interaction with customers,
Interested parties. Industries, interested party’s requirements, and
are continuously being monitored and reviewed by Managing
Director & MR.
Renfra
The external Power issues
and internal Private Limited related
are identified has to
determined the interested parties who are relevant to the
social factors, Technology up gradation, Changes in
Renfra Power Private Limited Quality, Environmental, Health
Statutory andsystem
& Safety management regulatory
and therequirements,
requirement Changes
of the in
interested surrounding
parties in order to prevent the potential effect on
the organization's ability to consistently meet the Quality,
Environmental, Health & Safety performances, interested
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
internal issues which are identified in the context of the organization, Legal and other requirements
that come under Compliance obligations, and Organizational units, functions, and physical
boundaries.
Scope:
The extent of the application depends on factors such as the Quality,
Environmental, Health, and Safety of the organization, the nature of activities, products, and services
including utilities, and the location and conditions in which it functions.
The scope of the Quality, Environmental, and Health & Safety Management System covers
"Execution of Turnkey Projects for Wind Turbine and Solar energy.
Operation and Maintenance of Wind Turbine and Solar Plants. Wind Turbine Repowering
and Inspection Services. Procurement & Sales of Wind Turbine Spares”
4.4 Quality, Environmental, Health & Safety management system (QSHE)
To achieve the intended outcomes with respect to the Quality, Environmental,
Health & Safety management system, including enhancing its Quality, Environmental, Health &
Safety performance, the Renfra Power Private Limited has established, implemented and maintained,
and continually improved the Quality, Environmental, Health & Safety management system,
including the processes needed and their interactions.
Renfra Power Private Limited has determined the processes needed for the
Quality, Environmental, Health & Safety management system and their application throughout the
organization in Process Map.
Page 9 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 10 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 11 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 12 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 14 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited has established, implemented, and maintained the
processes needed to meet the requirements identified through the Risks & Opportunities assessment
in the context of Quality, Environmental aspects, OH&S Hazards of Renfra Power Private Limited
activities, products, and services that Renfra Power Private Limited can control and those that Renfra
Power Private Limited can influence, and their associated quality, environmental, OH& impacts,
considering a life cycle perspective and identified Compliance obligations.
When planning for the quality, environmental, health & safety management
system, the Renfra Power Private Limited has considered
Page 15 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited has planned the actions to address these risks and
opportunities to integrate and implement the actions into its Quality, Environmental, OH&S
management system processes, to evaluate the effectiveness of these actions. Actions taken to
address risks and opportunities are proportionate to the potential impact on the conformity of the
Quality, Environmental, OH&S management system. Risk is the possibility of events or activities
impeding the achievement of an organization’s Quality, Environmental, OH&S performance, and
objectives. It is the volatility of potential outcomes. Renfra Power Private Limited integrated the risk
and opportunity identification with the Quality, Environmental, OH&S management system and
documented in Risk Register (QMS), Aspect & Impact Register (EMS), Hazard & Risk
Register (OH&S) which includes the actions related to risk & Opportunities identified through
process, Product, change, service-related environmental aspect analysis, External & Internal issues
identified in the context of the organization and interested parties need & expectations.
When determining the risks and opportunities for the OH&S management system and its intended
outcomes that need to be addressed, Renfra Power Private Limited has taken into account
— OH&S hazards
— OH&S risks and other risks
— OH&S opportunities and other opportunities
— Legal requirements and other requirements
Renfra Power Private Limited, in its planning process, has determined and
assessed the risks and opportunities that are relevant to the intended outcomes of the OH&S
management. The system is associated with changes in the organization, its processes, or the OH&S
management system. In the case of planned changes, permanent or temporary, this assessment shall
be undertaken before the change is implemented.
Page 16 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 17 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
On the Occupational health and safety management system front, Renfra Power
Private Limited maintains a documented Integrated Management system procedure that details
About the activities of zone-wise hazard identification, risk assessment, and
determination of necessary controls. The process of zone wise job hazard identification, risk
assessment, and determining controls (JHI, RA & DC) takes into consideration the following
a) How work is organized, social factors (including workload, work
hours, victimization, harassment, and bullying), leadershi,p and the culture in the organization.
b) Routine and non-routine activities and situations, including hazards
arising
o infrastructure, equipment, materials, substances, and the physical conditions of the workplace
o product and service design, research, development, testing, production, assembly,
construction, service delivery, maintenance, and disposal
o human factors
o how the work is performed
c) Past relevant incidents, internal or external to the organization,
including emergencies, and their causes
d) Potential emergency situations
Page 18 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
e) Activity of all the personnel working for and at Renfra Power Private
Limited, who have access to the facility; this includes contractors, visitors, customers, and other
interested parties
o Ergonomics, human behavior, capabilities, and related factors.
o Identified hazards that have an origin outside the workplace are capable of adversely affecting
the health and safety of personnel under the control of the organization within the workplace.
o Hazards are created in the vicinity of the workplace by work-related activities under the
control of the organization.
f) Other issues, including consideration of
o the design of work areas, processes, installations, machinery/equipment,
operating procedures, and work organization, including their adaptation to the needs and
capabilities of the workers involved
o situations occurring in the vicinity of the workplace caused by work-related
activities under the control of the organization
o situations not controlled by the organization and occurring in the vicinity of
the workplace that can cause injury and ill health to persons in the workplace
g) Actual or proposed changes in organization, operations, processes,
activities, and the OH&S management system
h) Changes in knowledge of, and information about, hazards
6.1.2.2 Assessment of OH&S risks and other risks to the OH&S management
system
Renfra Power Private Limited has established, implemented, and maintained a
process to
a) Assess OH&S risks from the identified hazards, while taking into account the
effectiveness of existing controls through HIRA procedure RPSAP02
b) Determine and assess the other risks related to the establishment,
implementation, operation, and maintenance of the OH&S management system.
Renfra Power Private Limited has defined the methodology and criteria for the
assessment of OH&S risks with respect to their scope, nature, and timing to ensure they are proactive
rather than reactive and are used in a systematic way. Procedure for HIRA procedure maintained
and retained on the methodology and criteria.
Page 19 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
6.1.2.3 Assessment of OH&S opportunities and other opportunities for the OH&S
management system
Page 20 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 22 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 23 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
The Human Resource & process owner are responsible for maintaining
employee training records. Appropriate records are monitored and reviewed on a scheduled basis.
Competency is determined by the employee’s superior/supervisor in coordination with the MD &
MR.
Ref: Procedure for Training RPHRP01
Page 25 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
c) Their contribution to the effectiveness of the quality, environmental, health & safety
management system, including the benefits of enhanced quality, environmental, health & safety performance
d) The implications of not conforming with the quality, environmental, health & safety
management system requirements, including not fulfilling the organization’s compliance obligations.
The awareness is created through training, meetings, on-the-job training,
displays, education, and experience sharing.
Ref: Procedure for Training RPHRP01
Page 26 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 27 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
o Proper communication mode is established with the workmen, contractors, visitors, and other
interested parties are established and maintained.
o Mechanisms established for the participation of workers in:
1. Monthly Safety committee meetings, with representation and participation of the
workmen
2. Hazard identification, Risk assessments, and determining controls
3. Communication about the incidents, and involvement in the incident investigation front
4. Participation in the OH&S Programme (s) and involvement in the development and
review of OH&S policies, procedures, and objectives.
Ref: Procedure - RPMRP06
7.4.3 External communication (QSHE)
Renfra Power Private Limited externally communicates information relevant
to the quality, environmental, health & safety management system, as established by the
organization’s communication processes and as required by its compliance obligations.
Renfra Power Private Limited management maintains a mechanism to
communicate the changes which affect the Occupational Health & Safety Management System
1. Communicate to contractors and interested parties about the changes that affect the QSHE
system
2. Involves relevant external interested parties or consults on matters relating to QSHE of the plant.
Consultation with employees and contractor workers is planned where there are any
changes that affect the QSHE in Renfra Power Private Limited. The arrangements of the participation
and consultation are planned and communicated to the employees and contract workers.
Ref: Procedure for Communication, Participation & Consultation RPMRP06
Page 28 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 29 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 30 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
The following matrix explains the preparing, approving, issuing, and revising
authority for various levels of documentation.
Approval /
Document Preparing Issuing
Re approval
Integrated Management System
MR MD MR
Manual (Level 1)
Integrated Management System
MR MR & GM MR
Procedures (Level 2)
Documents (Level 3) HODs MR & GM MR
MR & GM MR
Records / Formats (Level 4) HODs
All the documents are reviewed for adequacy by the approving authority before
approval.
7.5.3 Control of documented information (QSHE)
Renfra Power Private Limited has the system to control the documented
information required for the Quality, Environmental, Health, and Safety management system by
ensuring the following points
a) It is available and suitable for use, where and when it is needed;
b) It is adequately protected (e.g. from loss of confidentiality, improper use, or loss of integrity).
Renfra Power Private Limited has a system for controlling documented
information by addressing the following activities through the documented procedure,
a) Distribution, access, retrieval, and use
b) Storage and preservation, including preservation of legibility
c) Control of changes (e.g. version control);
d) Retention and disposition.
This includes the external origin documents related to Quality, environmental, health, and safety
management systems.
Ref: Procedure for Documented Control RPMRP04, Record Control RPMRP05
Page 31 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited ensures that outsourced processes are controlled
through the procedure Supplier (External providers) Selection RPPUP01, Supplier performance
monitoring RPPUP02, Purchase RPPUP03
The outsourced processes are
a) Calibration
Page 32 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
b) Testing
c) Consulting for QMS
d) Machine services
8.2 Requirements for products and services
8.2.1 Customer communication
Renfra Power Private Limited has determined and implemented a
communication matrix with customers which includes
a) Providing information relating to products and services
b) Handling inquiries, contracts, or orders, including changes
c) Obtaining customer feedback relating to products and services, including customer complaints
d) Handling or controlling customer property
e) Establishing specific requirements for contingency actions, when relevant.
8.2.2 Determining the requirements for products and services
Renfra Power Private Limited Determining the requirements for the products
and services to be offered to customers through the inquiry review process and contract review
process.
Renfra Power Private Limited., identifying and defining the requirements for
the products and services which include any applicable statutory and regulatory requirements and
those considered necessary by the organization. Renfra Power Private Limited will meet the claims
for the products and services it offers during the contract review process.
Page 33 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
b) b) Requirements not stated by the customer, but necessary for the specified or
intended use when known
c) Requirements specified by the organization
d) Statutory and regulatory requirements applicable to the products and services
e) Contract or order requirements differing from those previously expressed
Renfra Power Private Limited ensures that contract or order requirements
differing from those previously defined are resolved and communicated to customers. The customer’s
requirements are confirmed by the Renfra Power Private Limited before acceptance when the
customer does not provide a documented statement of their requirements.
Ref: Procedure for Contract Review RPMKTP01
8.2.3.2 Renfra Power Private Limited retains documented information on the results of the review,
and on any new requirements for the products and services through the Feasibility review checklist.
8.2.4 Changes to requirements for products and services
Renfra Power Private Limited ensures that relevant documented information
is amended and that relevant persons are made aware of the changed requirements when the
requirements for products and services are changed through phone/email.
8.3 Design and development of products and services
Not applicable
8.4 Control of externally provided processes, products, and services
8.4.1 General
Renfra Power Private Limited will ensure that externally provided processes,
products, and services conform to requirements. The organization has determined the controls to be
applied to externally provided processes, products, and services when
a) Products and services from external providers are intended for incorporation into the
organization’s own products and services
b) Products and services are provided directly to the customer(s) by external providers
on behalf of the organization
c) A process, or part of a process is provided by an external provider as a result of a
decision by the organization.
Renfra Power Private Limited has determined and applied criteria for the
evaluation, selection, monitoring of performance, and re-evaluation of external providers, based on
Page 34 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
their ability to provide processes or products and services in accordance with requirements. The
organization retains documented information about these activities and any necessary actions arising
from the evaluations.
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
8.5.4 Preservation
Renfra Power Private Limited preserves the outputs during production and
service provision, to the extent necessary to ensure conformity to requirements.
Page 37 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 38 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 40 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited has documented the result of the Hazard & Risk
assessment and controls determined in the Hazard & Risk Analysis register RPSAD01
Renfra Power Private Limited has ensured that OH&S risks and determining
controls are taken into account during the OH&S management system establishment.
Refer: Procedure for HIRA – RPSAP06
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
8.1.4 Procurement
8.1.4.1 General
Renfra Power Private Limited has established, implemented, and maintained a
process to control the procurement of products and services in order to ensure their conformity to its
OH&S management system through Procedure for RPPUP01/ RPPUP02/ RPPUP03
8.1.4.2 Contractors
Renfra Power Private Limited coordinates its procurement process with its
contractors, in order to identify hazards and to assess and control the OH&S risks arising from:
a) The contractors’ activities and operations that impact the organization;
b) The organization’s activities and operations that impact the contractors’ workers
c) The contractors’ activities and operations that impact other interested parties in the
workplace.
Renfra Power Private Limited ensures that the requirements of its OH&S
management system are met by contractors and their workers. Renfra Power Private Limited
procurement process has defined and applied occupational health and safety criteria for the selection
of contractors.
Ref: Procedure for Supplier Selection RPPUP01/ RPPUP02/ RPPUP03
8.1.4.3 Outsourcing
Renfra Power Private Limited ensures that outsourced functions and processes
are controlled. Renfra Power Private Limited also ensures that its outsourcing arrangements are
consistent with legal requirements and other requirements and with achieving the intended outcomes
of the OH&S management system. The type and degree of control to be applied to these functions
and processes are defined in Procedure for Supplier Selection RPPUP01/ RPPUP02/ RPPUP03
8.2 Emergency preparedness and response (QSHE)
Renfra Power Private Limited has established, implemented, and
maintained a QEHS Management System procedure to:
Identify potential emergency situations which means, any
Intolerable, non-routine situation which endangers the
personnel, Environment, other interested parties, or
surroundings of Speed Team Infra Private limited. The
potential emergencies identified through Risk & Opportunity
are also considered for establishing the procedures.
Page 42 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 43 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 44 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 46 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Page 48 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
Renfra Power Private Limited has determined the system to find out
opportunities for improvement and implement necessary actions to achieve the intended outcomes of
its quality, environmental, health & safety management system through the procedures. Refer
procedure manual.
10.2 Incident, Nonconformity, and corrective action (QSHE)
o Collection of Incidents / near misses through Incident Investigation Report / Near Miss
register
o Reporting to Factory head during daily coordination meeting, the status of:
a) Incident
b) Near miss
c) Emergency situations
o The report on the incident investigation should reach MR – QSHE within 24 hours of the
occurrence of the incident.
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
o Investigate the cause, root cause, and lack of control that resulted in the event through why-
why analysis.
o During the investigation, the following factors are considered and a report of investigation is
prepared and communicated to all concerned personnel:
a) Incident Brief
b) Equipment / Product involved
c) Part of the body involved; Severity
d) Activity related to the event; Date & Time of event occurrence
e) Frequency of Incident / near miss
f) Agency that causes Incident / near miss / emergency situation
o Corrective and preventive action is prepared in consultation with the concerned process
owners
o Ensure implementation of the corrective action proposed and before implementation, a Risk
Assessment of proposed corrective and preventive action is performed, as the case may be
o The effectiveness of the CAPA taken is monitored and HIRA revised if required.
o In case of investigation by an external agency, the protocol set by Statutory authorities e.g.,
Factory inspector, Pollution control board authorities, etc. are followed
o The monthly Safety committee meeting reviews all incidents, including near misses, and
records are maintained
Page 50 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
o The information to be sent to statutory authority may incorporate the requirement as per
relevant Act / Rule as may be applicable
Review the nonconformity and evaluate the immediate causes / basic causes and
each of the controls that led to the nonconformity and decide the corrective action to avoid recurrence
in consultation with the concerned process owner involving the Employee Appointee.
Corrective and preventive action may include one or more of the following actions:
a) Change in work practice
b) Training to the concerned personnel
c) Addition, modification to the OCP (SOPs)
d) Change in design of the equipment
e) Preparation of the IMS program
f) Review of legal requirements
When a nonconformity occurs, Renfra Power Private Limited
a) react to the nonconformity by taking action to control and correct, deal with the consequences,
including mitigating adverse quality, environmental, health & safety impacts
a) evaluate the need for action to eliminate the causes of the nonconformity by doing root cause analysis,
identification of root cause in order that it does not recur or occur elsewhere by reviewing the
nonconformity, determining the causes of the nonconformity, determining if similar nonconformities
exist, or could potentially occur, implement any action needed. The non-conformity, root cause, and
corrective actions are recorded in the Non-conformance & Corrective action report RPMRP10
Renfra Power Private Limited EHS committee reviews the effectiveness of
any corrective action taken with respect to EH&S. The review result is recorded in the Non-
conformance & Corrective action report RPMRP10 appropriateness of corrective action is
Page 51 of 52
Renfra Power Private Limited
No.122(12), Varthaga Nagar, Kuthukalvalasai, Tenkasi-627811,
Tamil Nadu, India
Integrated Management System Manual
Management System Document No. Version Rev.No. Effective Date Prepared By Approved By
ISO 9001: 2015, ISO 14001: 2015, Muthuraj
RPPL/IMSM/01 01 00 01-Dec-2021 Pravinth.S
ISO 45001:2018 periyasamy
ensured by the EHS committee. If the corrective action is not appropriate, the team will request the
responsible person to take another corrective action. The procedure for corrective action is addressed
in RPMRP10
Refer Procedure for Incident investigation & Corrective action RPMRP10
Page 52 of 52