You are on page 1of 3

Department of Physical Sciences PHYS 20034 Physics for Engineers

College of Science Online Instructional Materials

Instruction: After completing this activity sheet, save this as PDF File format and upload with
file name on or before the deadline set at online class management platform.
(File name format.: Surname,Firstname MI VLS-PFE 1.pdf)

I affirm that I have upheld the highest principles of honesty and integrity in my academic work.

NAME: De Guzman, Stephen Lance E.

Year & Section: BSRE 1-2

DATE OF SUBMISSION: 04/05/2022

Virtual Laboratory Simulation Activity Sheet


PFE 1: Measurement

I. Measurement of Dimension
A. RULER (Actual Activity)

METRIC ENGLISH
Length Width Thickness Length Width Thickness
Trial
(cm) (cm) (cm) (in) (in) (in)

1 10.8 cm 6.9 cm 3.75 cm 4.25 in 2.71 in 1.44 in


2 10.75 cm 7 cm 3.7 cm 4.26 in 2.7 in 1.45 in
3 10.8 cm 7 cm 3.7 cm 4.25 in 2.7 in 1.46 in
Average 10.78 cm 6.97 cm 3.72 cm 4.25 in 2.7 in 1.45 in

Volume of block in cm3 (ave) = 279.51 cm3


Volume of block in inch3 (ave) = 16.64 inch3
Therefore, 1 inch3 = 16.79 cm3 (Experimental Value, EV)

Accepted value (AV): 1 in3 = 16.39 cm3

Percentage error = 2.49%

Note: When comparing results with certain accepted values, use:

Prepared by Physics Instructional Materials Committee 2020


Department of Physical Sciences PHYS 20034 Physics for Engineers
College of Science Online Instructional Materials

Percentage Error=

where: EV — experimental value

AV — accepted value or theoretical value

ATTACH/PASTE THE PHOTO OF YOUR ACTUAL ACTIVITY HERE

B. VERNIER CALIPER

Prepared by Physics Instructional Materials Committee 2020


Department of Physical Sciences PHYS 20034 Physics for Engineers
College of Science Online Instructional Materials

II. MEASUREMENT OF MASS

TRIPLE BEAM BALANCE CHALLENGE

Prepared by Physics Instructional Materials Committee 2020

You might also like