You are on page 1of 10

HOA/TOA Araeostyle intercolumnation should have a height of

8 of diameter
The "Golden Section" is equal to? Considering PD 1096, BP 344, RA 9514 What is the
1.618 maximum size of a door?
1220
The Ronchamp Church designed by Le Corbusier has
the openings slant towards their centers at varying Based on PD 1096, What is the minimum area for
degrees, thus letting in light at different angles. This room habitation?
glass is sometimes clear, but is often decorated with 6 sqm
small pieces of stained glass in typical Corbusier
colors. What is the color Le Corbusier did not use for Considering PD 9266, BP 344, RA 9514, BP 220;
this project? What is the minimum ceiling height for an artificially
Blue ventilated room
2.7m
Which of the following is NOT the Le Corbusier's 5
points of Architecture? Based on BP 344 What is the minimum dimension of
Open Garden an elevator car
1100mm x 1400mm
It is an anthropometric scale of proportions devised
by Le Corbusier. It was developed as a visual bridge Based on RA 9514 and BP 344; What is the minimum
between two incompatible scales, the Imperial system ramp width
and the Metric system. It is based on the height of an 1200
English man with his arm raised.
Modulor What is the preferred nosing for staircase as dictated
by BP344
What is Section 13 of RA 9266? Slanted Nosing
Qualifications of Applicant for Examination
A mezzanine level shall have a CCH of not less than
Indicates a position in space ____________ above and below it. If a ceiling cavity
Point is provided for the floor below the mezzanine level.
1.8 m
A phenomenon of light and visual perception that may
be described in terms of an individual's perception of The CSG is answerable only to _______________
hue, saturation and tone value. It distinguish a form Owner and Architect
from its environment?
Color These preliminary studies involve the procurement,
analysis and use of secondary information gathered
By Le Corbusier comments on "forms", which of the for the project to aid the Client in early decision-
composition that he mention is "very difficult" to making.
satisfy the spirit? Pre-Feasibility Study
Cubic Transformation
This analytical problem-seeking process will lead to
Having an intercolumnation of 2 and quarter the statement and identification of both horizontal and
diameters this intercolumnation is considered by vertical requirements in offering a solution.
Vitruvius as the best proportion Architectural Programming
Diastyle
An analysis of the space requirements of the project Is the person, firm or corporation who provides
based on organizational structure and functional set- guarantee for the contractor’s bond.
up Surety
Space Management Studies
Completed in 1144, this cathedral is considered to be
The Architect determines the adequate size and the first Gothic church to be constructed - ProProfs
appropriate configuration for a proposed project in Completed in 1144, this cathedral is considered to be
consideration of the use, allocation and interface of the first Gothic church to be constructed
spaces for given activities. Basilica of St. Denis
Space Planning
Who designed the St. Peter's Basilica Square/Piazza
He mentored people known for the quotes "Less is San Piettro
More", "Architecture begins where Engineering ends", Bernini
and "A house is a machine for living in"
Peter Behrens The Contractor shall give written notice to the
architect at least _____ prior to the beginning,
An art deco architect known for his work on the suspending (except in case of accident) or resuming
Rockefeller Center buildings the work.
10 days

What is the first city to have a skyrise building; and


what is the building
Chicago; Home Insurance Building

What is the first skyrise building in New York City


New York World Building

Raymond Hood No claim for delay shall be allowed on the account of


failure to receive drawings until ______ after demand
Taking of from Eliel Saarinen's design for the tribune for such drawings.
tower. Black brick on the frontage of the building 2 weeks
(symbolizing coal) was selected to give an idea of
solidity and to give the building a solid mass. What is Who gets to decide any and all questions which may
the style of this building arise as to the interpretation of Drawings and Specs
and shall be the interpreter of the conditions of the
Contract.
Architect

If Architect fails to render a decision within _____


after parties have presented their evidence, either
party may demand for arbitration.
15 days

Gothic Art Deco What do you call the relationship between the Torre
de Manila and the Rizal Shrine?
Contrast
How many days from the receipt of the NTP will the What is not a grounds for suspension of work by the
work start Contractor
7 days If the Owner should fail to act upon the Request for
Payment or Certificate of Payment within fourteen
Which of the following is not submitted by the days after its certification by the Architect
Architect when applying for the Building Permit
CTC Which is not a sufficient cause to justify termination of
the Contract?
Currently the tallest building in New York City Disregard or violate Engineer’s instructions, or failed
One World Trade Center to execute the work according to the agreed Schedule
of Completion, including extensions thereof.
Considering BP 344, PD 1096, RA 9514 what is the
minimum width of the door? Can refer to either the rear room of an ancient greek
900 mm temple or to the inner shrine, also called the adyton
Ophistodomos
What is the setup of the IAPOA
SEC registered, non-profit, non-stock What do you call the image below

What is RA 9514
Fire Code of the Philippines

An architectural term for the vertically channeled


tablets of the Doric frieze. It's main function is to hide
the rafters.
Triglyphs

What is RA 9266
AN ACT PROVIDING FOR A MORE RESPONSIVE
AND COMPREHENSIVE REGULATION FOR THE
REGISTRATION, LICENSING AND PRACTICE OF
ARCHITECTURE
Telamons
What governs if there is a conflict between Detailed
Specs, General Specs, and the Drawing
It is used to warn visually impaired people of the
Detailed Specs
presence of specific hazards: steps, level crossings or
the approach to the on-street light rapid transit (LRT)
Duration of time allowed by the contract for the
platforms. It is also used where a footway joins a
completion of the project.
shared route. It conveys the message ‘hazard,
Time Limit
proceed with caution.
Corduroy Hazard Warning Tactile
Is the approved form of security furnished by the
Contractor and his surety as guarantee of good faith
Proposed the Sector Model which states that a city
on the part of the contractor to execute the work in
develops in sectors instead of rings.
accordance with the terms of the Contract.
Homer Hoyt
Performance Bond
Designer of the Laguna West. Known as the The architect renders periodic design supervision
developer of the concept of TOD during the _______
Peter Calthorpe Regular design services

First designer of the layout of the streets of The intent of the Contract Documents is to ______
Washington D.C. the project
Pierre Charles L'Enfant Finalize

It concerns the science of human settlements, The mezzanine flooor of the bahay na bato
including regional, city, community planning and Entresuelo
dwelling design
Ekistics To indicate the social status of the occupants of
houses in China, this color of the roof tile is reserved
Minimum number of hours required for diversified to the Mandarin
training experience Red
3840 hours
The Burmese pagoda
Under RA 9514, what is the height of buildings where Zedi
automatic sprinkler protection is required?
15m Chicago's Columbian Exposition (known as the Great
White City) advocaeed
The _______ created the Professional Regulations City beautiful
Commission (PRC) in the Philippines
PD 223 The period in architecture marked by a conflict
between the classic and gothic
AS-built drawings are the responsibility of the Battle of the Styles
_______
Contractor Father of Modern Architecture in Austria
Eliel Saarinen
The _______ is the legal bond for the Client-Architect
relationship Also called Barley-sugar column, characterized by a
Contract spiraling twisting shaft like a corkscrew.
Solomonic
The resolution on arbitration should be complied
within ______ days from its issuance The harem is
30 days Women's room

The government can order a work stoppage on public It means building house
construction projects for a maximum of ____ Bauhaus
90 days

The Lot survey is paid for by the ______


Owner

Full time supervision is paid


1-1.5%
PROF PRACT and BUILDING LAW As per Fire Code, what is the maximum number of
seats in rows of seats between aisles for places of
An architect makes a miniature model of the project assembly?
for his own design study. Who should pay for it? - 14
- ARCHITECT As per Fire Code, under what classification does fire
You were commissioned to do a master plan. What in flammable liquids and gasses belong to? - CLASS
should you do first? - Study the existing laws B
As per NBC, the minimum width of planting strips for A kind of public open space defined under the Water
grass and shrubs for each side of the RROW shall be Code and other laws that must be absolutely free of
– 200MM all forms of physical obstructions that can negatively
The minimum horizontal dimension for courts and affect natural light and ventilation within such space
yards. – 2 METER or that can impede access to or the full recreational
The minimum horizontal dimension for courts and use of such space by the general public. -
yards. – 2.70 METERS EASTMENT
What is the minimum area for toilet and bath in The distance between the street curb of the
square meters? - 1.20 SQM ingress/egress of a commercial lot/property (nearest
Is a continuous and unobstructed route of exit from the intersection) and the straight curb of the
one point in a building, structure or facility to a public intersection shall not be less than how many meters. -
way. - Means of Egress 50 METERS
A court bounded on three sides by building lines. –
Preparation of shop drawing is the sole function of the OPEN COURT
-CONTRACTOR As per BP 220, which is second to water in the
hierarchy of basic needs of human settlements, the
What is the minimum lot area for rowhouse socialized provision of which shall be based on the actual setting
housing units as provided for in BP 220? – 28 which the project is located? - Movement &
Circulation
This specialized architectural service is based on the An architect was commissioned for a project
concept of expanded physical planning services to amounting to 3.5 million pesos including a 12% VAT.
include other activities necessary for the proper How much would it be without the VAT? - Php
handling of the numerous components considered in 3,125,000.00
the formulation, implementation and realization of a A registered & licensed architect, who is academically
Master Development Plan (MDP). It covers the range & professionally qualified, & with exceptional or
of all services from primary data gathering through recognized specialization in any branch of
the formulation of the MDP and the parallel Architecture.
preparation of the environmental impact assessment / – CONSULTING ARCHITECT
statement (EIA/S). As per Fire Code, where the total occupant load of all
- COMPREHENSIVE DEVELOPMENT PLANNING storeys served by the stair is less than 50, the
(CDP) SERVICES minimum width clear of all obstructions, shall be 915
millimeters
What is the height of lighting switches for the
handicapped? - 0.92m - 1.22m
In this specialized architectural service, the Architect
Aircraft hangar and open parking garages are under has to go beyond the study of human behavior and
what classification of occupancy? - Business and activities and must undertake an in-depth study of the
Mercantile host site's economic systems, its laws and
regulations, tax structure, infrastructure, utilities, and
all other components that will have a bearing on the Cost-based method of compensation applicable only
project. to NON-CREATIVE WORK. - MULTIPLE OF
- SITE & PHYSICAL PLANNING SERVICES DIRECT PERSONNEL EXPENSES
As per NBC, entrance or exit steps shall have treads
of not less than ____ millimeters. The minimum
number of steps shall be two (2) with risers not This method of compensation is frequently used
exceeding _____ millimeters. - 300: 100 where
It is the most common method of compensation which there is continuing relationship on a series of projects
is also fair to both client and architect? - Percentage - Professional Fee plus Expenses
fee method As per NBC, the minimum open space requirement
What is the difference between RA 545 and RA 9266 for group A, B, C, D & J occupancies in an interior lot
in erms of architectural practice? shall be
- Structural Conceptualization - 50%
As per NBC, the total width of exits in meters shall not Which is NOT a required knowledge for a Consulting
be less than the total occupant load served divided by Architect in the practice of Architectural Research
_____. Such width of exits shall be divided Methods? - Specification Writing
approximately equally among the separate exits. – Required: Architectural Writing & Photography,
165 Philippine Architecture and its History, and
Buildings or structures that constitute a hazard to Architectural Design Trends
safety or health or public welfare because of As per NBC, the minimum ceiling height for habitable
inadequate maintenance, dilapidation, obsolescence, room with natural ventilation shall be 2.70 meters
or abandonment, or which otherwise contribute to the Defining "open space" in residential subdivisions and
pollution of the site or the community to an intolerable attending section 31 of Presidential Decree no. 957
degree. - Dangerous Buildings requiring subdivision owners to provide roads, alleys,
The Architect's recommended professional fee for a sidewalks and preserve open space for parks and
publishing plant with a project construction cost of 50 recreational use. - PD 1216
million rendering detailed architectural and A toilet and bath shall have a minimum dimension
engineering design services. – 6 % of .90-meter x 1.20 square meters.
Within how many month/s shall be the release of As per NBC, entrance and exits ramps shall have a
retention from date of final payment? - 3 slope not exceeding – 1/10
In this selection process, the Architect explains his In this Regular Design Services phase, the Architect
methodology in translating the plan/design evaluates the Owner's program, schedule, budget,
requirements of the proposed project. – INTERVIEW project site and proposes methods of project
The approved form of security furnished by the deliveries.
contractor as a guarantee of good faith on the part of - Schematic Design Phase
the contractor to execute the work in accordance with Under the regular design services, which of the
terms of the contract. – PERFORMANCE BOND following activities falls under the contract documents
If the owner continuously orders changes to the phase?
design, what methods of compensation should be - Prepares design documents / construction
used? drawings & specifications
- Percentage fee and cost method It refers to contracts or arrangements involving the
As per Fire Code, what is the occupant load factor for transfer of systematic knowledge for the manufacture
a Conference Room? – 1.40 SQ.M / PERSON of a product. - Technology Transfer
Windows as emergency egress shall have a minimum Grab bar height in millimeter for disabled in a toilet
dimension of 0.82 x 1.00 METERS cubicle? - 800
This method of remuneration is used when the
services of a Professional Consulting Architect (PCA)
is expected to be required at intervals over a period of What is the minimum lot frontage (in meters) for
time. rowhouse units in economic housing as provided for
– RETAINER BP 220? – 4.0 METERS
Ancillary permits are permits that are required for An analysis of the space requirements of the project
specific aspects of a construction project, such as based on organizational structure and functional set-
structural, sanitary, or electrical permits. up pinpoints linkages and interaction of spaces. The
The Architect in this area of practice recommends the formulation of the space program will serve as the
systematic process of ensuring that a basis for the development of the architectural plan /
building/structure's array of systems is planned, design. This pre-design services is known as
designed, installed and tested to perform according to – Space Management Studies
the design intent and the building's operational needs. You were commissioned to do a master plan. What
- Building Testing and Commissioning should you do first? - Study the existing laws
What does A & E stands for? - Architecture and It was the first law passed by the national assembly in
Engineering 1921 where the Maestros de Obra or the Master
As per NBC, a building/structure which is located Builders are required to register as architects.
partly in one (1) fire zone and partly in another shall - Engineers & Architects Law Act no. 2986
be considered to be in the more highly restrictive fire This method of compensation applies to government
zone, when more than __of its total floor area is projects since they entail more paper work and time-
located in such zone. – 1/3 consuming efforts. - Lump Sum or Fixed Fee
This regular design services phase is based on Within how many days from the date a change is
approved schematics and conceptual plans where the ordered shall any claim for adjustment involving
Architect prepares outline specifications to fix and questions of facts be asserted? 15 DAYS
illustrate the size and character of the entire project Enclosed attic spaces of combustible construction
as to type of materials, type of structural, electrical, shall be divided into horizontal areas not exceeding
mechanical, sanitary, electronic and communications ____ sq. meters by fire-resistive partitions extending
systems. from the ceiling to the roof. – 250 SQ.M
- Design Development Phase The value of extra work or change in construction
Given a room with floor area of 300 square meters, plans requested by the owner. - Actual direct cost
what shall be the total area required for window plus 15% for profit, overhead & tax
openings for said room? – 30.00 SQ.M Minimum air space for workshop, factories, and
As per BP 220, how many percent of the gross offices. (In cubic meters per person) – 12
subdivision area shall be allocated for Community Maximum number of rowhouse units in a block. – 20
Facilities if the density is not more than 150 dwelling Air space requirement for a habitable room. – 14
units per hectare in a socialized housing? – 1.0 % CU.M
Any physical change made on a building/structure to A separating strip between arcaded portion and open
increase its value, utility and/or to improve its portion of sidewalk of a combined open and arcaded
aesthetic quality? – Renovation sidewalk. -.80m Planting strip
Stipulation of the use of specific products or purposes Plan, models and perspectives are? - Instrument of
without provision for substitution is a? - CLOSED Practice
SPECIFICATION As per NBC, the minimum width of planting strips for
Minimum area for toilet and bath – 1.20 SQ.M grass and shrubs for each side of the RROW shall be.
Towers, spires and steeples, erected as parts of the - 200 millimeters
building and not used for habitation or storage may Aside from the people and country, who does the
extend but not exceed ____ meters above the architect give supreme to oath to? – GOD
prescribed building height limit (BHL) for each AS per NBC, foundations may be permitted to
occupancy group, if of combustible materials. – 6.0 encroach into public sidewalk areas to a width not
METERS exceeding __millimeters; provided that the top of the
said foundation is not less than _____ millimeters which the building/structure can best maintain itself
below the established grade. - 500 / 600 and prolong its life in a cost-efficient manner, and
It is the orderly arrangement within a piece of land or finally provide recommendations to the Owner/ Client.
property on which vertical structures such as - FORENSIC ARCHITECTURE
buildings, monuments and the like, as well as This analytical problem-seeking process will lead to
horizontal developments such as rights-of-way the statement and identification of both horizontal and
(ROWs), open spaces and activity spaces are to be vertical requirements in offering a solution. It
proposed. incorporates a space program with characterizations
- Physical Planning of the envisioned spaces such as ambiance, cost
The minimum horizontal dimension for courts and range, etc. – ARCHITECTURAL PROGRAMMING
yards. As per PD 957, what is the maximum block length
- 2.00 METERS with an alley or pathwalk? – 400 METERS
As per NBC, the minimum width of planting strips for Minimum door width for hospital nursing units? – 1.12
trees for each side of the RROW shall be 300 MM M
A statement from the architect confirming the amount An architect makes a miniature model of the project
of money due the contractor once work is for his own design study. Who should pay for it?
accomplished. - ARCHITECT
- CERTIFICATE OF COMPLETION What shall be the required window openings for a
What is the minimum ceiling height for habitable toilet and bath with a floor area of 15.00 sq.m.? – 0.75
rooms with artificial ventilation? 2.40 METERS SQ. M
To protect pedestrians during construction and A written document describing in detail the scope of
demolition, A temporary walkway of not less than __ work, materials to be used, methods of installation,
meters shall be provided, capable of supporting a and quality of workmanship. – SPECIFICATIONS
uniform live load of ___ kg/sq.m. - 1.20/650 A written document describing in detail the scope of
work, materials to be used, methods of installation,
These preliminary studies involve the procurement, and quality of workmanship. – 2.70 m
analysis and use of secondary information gathered Preferred width of central refuge as per BP 344 –
for the project to aid the client in early decision- 2.00 M
making. As per PD 957, what is the prescribed ratio for
- PRE-FEASIBILITY STUDIES saleable and non-saleable lots? – 70% :30%
A room for human habitation shall have a minimum A form of semi-permanent or permanent structure
dimension of 2.00 x 3.00 meters. constructed along property line, usually of masonry or
When a Client calls upon the Architect to give oral or reinforced concrete or other fire-rated material. –
written advice and direction, to attend conferences, to ABUTMENT
make evaluations and appraisals regarding a What offense is committed when an architect is found
contemplated project and similar activities, the using the seal of another architect? –
Architect renders valuable inputs whether or not the MISDEMEANOR
Client pursues the project. This scope of pre-design A building unsafe in case of fire because it will burn
services is called easily or because it lacks adequate exits or fire
- Consultation escapes.
As per PD 1096, what is the classification of buildings – FIRE TRAP
of masonry and wood construction with a one-hour When the Owner fails to implement the plans and
fire-resistivity throughout and exterior walls of documents for construction as prepared by the
incombustible fire-resistive construction. – Type III Architect, the Architect is entitled to receive, as
The Architect in this area of practice undertakes a compensation, the sum corresponding to ___ of the
scientific study on the built environment's well-being, Architect's fee. – 90%
which allows the Architect to focus on the ways in
The portion of a roadway or public way that should be
kept opened and unobstructed at all times for the
expedient conduct of fire fighting operations.
– FIRE LANE
For buildings of more than two (2) storeys in height,
the minimum width of the rear or side court shall be
increased at the rate of ___ millimeters for each
additional storey up to the fourteenth (14th) storey. –
300 MM
As per PD 957, what is the minimum lot frontage of
an interior lot for single-detached units? – 3.00 M
Minimum width of access road for interior or rear lots.
- 3000 MM
As per NBC, Footings located at least 2.40 meters
below grade along national roads or public highway
may project not more than __millimeters beyond the
property line
- 300 MM
Ebenezer Howard – Garden City of Tomorrow
Reymond Unwin and Barry Parker – Letchworth
Clarence Perry – Neighborhood Unit
Leslie Patrick Abercrombie and Patrick Geddes
– Greater London
Frank Lloyd Wright – Broadacre City
Arturo Soria Y Mata – Linear City
Tony Garnier - Cite industrielle / Une Cite Industrielle
Earnst May – Satellite Town
America’s Cup
Charles-Edouard Jeanneret- Gris/ Le Corbusier
- Unite d’ Habitation, City of tomorrow, Radiant City
Robert Owens – Reform Movement
Louis De Soisson – Welwyn
Daniel Burnham – Father of American City Planning
Walter Griffin – Canberra
Paolo Soleri – Arcology
Kinonuro Kikutake - Floating City
E.W Burgess – Concentric Zone Theory
Homer Hoyt - Sector Theory
Chauncy Harris and Edward Ullman – Multiple Nuclei
Friedrich Engels – Inverse Concentric
Neues Museum
Walter Christaller and Paul Peterson

River and Rowing Museum

Parc Guell

Des Moines Library

Guell Palace
Museum of Modern Literature

You might also like