You are on page 1of 14

MT TOFFER/JOSEFA

DATE PARTICULARS R.O.B


March 3, 2023 Arrival in Homonhon 30,828.00
March 22, 2023 ROB 17,680.00
April 12, 2023 ROB 6,080.00
April 14, 2023 ROB before Refuel 4,684.00
April 14, 2023 Refuel at Causeway
April 14, 2023 ROB after Refuel 37,514.00
April 15, 2023 ROB before Transferring of Diesel to M/T CLARA 36,751.00
April 15, 2023 Transferred to M/T CLARA 15,000.00
April 15, 2023 ROB after Transferring of Diesel to M/T CLARA 21,665.00
May 2, 2023 ROB 4,394.00
May 7, 2023 ROB before Refuel 1,091.00
May 7, 2023 Refuel at Causeway
May 7, 2023 ROB after Refuel 16,091.00
May 7, 2023 ROB
May 24, 2023 ROB before Refuel 8,211.00
May 24, 2023 Refuel at Causeway
May 24, 2023 ROB after Refuel 23,211.00
June 2, 2023 Upon arrival from shelter 16,415.00
June 17, 2023 ROB 8,669.00
June 19, 2023 ROB before Refuel 7,646.00
June 19, 2023 Refuel at Causeway
June 19, 2023 ROB after Refuel 17,646.00
June 23, 2023 ROB 15,646.00
Upon departure at Simerara 51,655.00
September 4, 2023 Arrival in Homonhon 40,655.00
October 7, 2023 ROB 16,701.00
October 9, 2023 ROB before Refuel 15,861.00
October 9, 2023 Refuel at Causeway
October 9, 2023 ROB after Refuel 25,832.00
October 11, 2023 ROB 24,414.00
October 17, 2023 ROB before Refuel 22,437.00
October 17, 2023 Refuel at Causeway
October 17, 2023 ROB after Refuel 38,370.00
November 1, 2023 ROB before Refuel 29,761.00
November 1, 2023 Refuel at Causeway
November 1, 2023 ROB after Refuel 49,742.00
November 12, 2023 ROB 43,368.00
November 14, 2023 ROB before Refuel 42,792.00
November 14, 2023 Refuel at Causeway
November 14, 2023 ROB after Refuel 52,776.00
November 26, 2023 ROB Upon Departure in Homonhon 51,158.00

TOTAL
MT CAPH/AURIGA
DATE PARTICULARS R.O.B
March 5, 2023 Arrival in Homonhon 81,571.00
March 22, 2023 ROB 74,616.00
March 30, 2023 ROB 68,461.00

TOTAL

LCT GRANDWISH 8
DATE PARTICULARS R.O.B
March 13, 2023 Arrival in Homonhon 7,123.00
March 17, 2023 ROB before Refuel 6,161.00
March 17, 2023 Refuel at Causeway
March 17, 2023 ROB after Refuel 16,107.00
March 26, 2023 ROB 14,557.00

TOTAL

M/T CLYDE/CLUDIA
DATE PARTICULARS R.O.B
March 23, 2023 ROB 8,120.00
March 28, 2023 ROB 7,200.00
March 30, 2023 ROB 5,750.00
April 2, 2023 ROB Before Refuel 4,850.00
April 2, 2023 Refuel at Causeway
April 2, 2023 ROB after Refuel 11,850.00
May 1, 2023 ROB 3,760.00
May 5, 2023 ROB Before Refuel 2,850.00
May 5, 2023 Refuel at Causeway
May 5, 2023 ROB after Refuel 12,850.00
June 2, 2023 Upon arrival from shelter 8220.00
June 13, 2023 ROB Before Refuel 3,512.00
June 13, 2023 Refuel at Causeway
June 13, 2023 ROB after Refuel 11,512.00
June 14, 2023 ROB Before Refuel 10,630.00
June 14, 2023 Refuel at Causeway
June 14, 2023 ROB after Refuel 12,630.00
June 30, 2023 ROB Before Refuel 6,975.00
June 30, 2023 Refuel at Causeway
June 30, 2023 ROB after Refuel 11,975.00
July 18, 2023 ROB Before Refuel 7,510.00
July 18, 2023 Refuel at Causeway
July 18, 2023 ROB after Refuel 14,510.00
August 2, 2023 ROB Before Refuel 7,370.00
August 2, 2023 Refuel at Causeway
August 2, 2023 ROB after Refuel 19,970.00

TOTAL

M/T LARRY/CELINE
DATE PARTICULARS R.O.B
March 23, 2023 Upon departure at Mandaue 24,292.90
March 25, 2023 ROB 21,200.00
May 2, 2023 ROB 17,000.00
May 22, 2023 ROB 14,000.00
May 23, 2023 ROB Before Refuel 13,900.00
May 23, 2023 Refuel at Causeway
May 23, 2023 ROB After Refuel 23,900.00
June 2, 2023 Upon arrival from shelter 20,700.00
July 12, 2023 ROB 16,000.00
July 20, 2023 ROB Before Refuel 13,500.00
July 20, 2023 Refuel at Causeway
July 20, 2023 ROB After Refuel 20,500.00
August 2, 2023 Upon arrival from shelter 17,290.00
September 2, 2023 Upon arrival from shelter 13,910.00
September 20, 2023 ROB Before Refuel 12,020.00
September 20, 2023 Refuel at Causeway
September 20, 2023 ROB After Refuel 22,020.00
October 7, 2023 ROB 15,421.00
October 18, 2023 ROB Before Refuel 13,998.00
October 18, 2023 Refuel at Causeway
October 18, 2023 ROB After Refuel 18,998.00
October 31, 2023 ROB Upon Departure in Homonhon 8,822.00

TOTAL

M/T CLARRA/NECA
DATE PARTICULARS R.O.B
April 6, 2023 Upon departure at Calaca Batangas 32,720.00
April 09, 2023 Arrival in Homonhon 11,140.00
April 12,2023 ROB 11,000.00
April 15, 2023 ROB before Refuel 7,300.00
April 15, 2023 Refuel at Causeway
April 15, 2023 ROB after Refuel 22,300.00
May 2, 2023 ROB 13,000.00
May 8, 2023 ROB before Refuel 10,100.00
May 8, 2023 Refuel at Causeway
May 8, 2023 ROB after Refuel 20,100.00
May 22, 2023 ROB 10,400.00
May 24, 2023 ROB before Refuel 9,400.00
May 24, 2023 Refuel at Causeway
May 24, 2023 ROB after Refuel 24,000.00
June 2, 2023 Upon arrival from shelter 18,900.00
June 12, 2023 ROB 10,600.00
June 14, 2023 ROB before Refuel 10,000.00
June 14, 2023 Refuel at Causeway
June 14, 2023 ROB after Refuel 20,000.00
July 6, 2023 ROB before Refuel 7,100.00
July 6, 2023 Refuel at Causeway
July 6, 2023 ROB after Refuel 17,100.00
July 16, 2023 ROB 11,300.00
July 20, 2023 ROB before Refuel 9,900.00
July 20, 2023 Refuel at Causeway
July 20, 2023 ROB after Refuel 24,900.00
August 2, 2023 Upon arrival from shelter 18,550.00
August 26, 2023 ROB before Refuel 8,100.00
August 26, 2023 Refuel at Causeway
August 26, 2023 ROB after Refuel 18,100.00
September 2, 2023 Upon arrival from shelter (9:00 a.m. sounded) 12,900.00
September 4, 2023 ROB before Refuel 11,750.00
September 4, 2023 Refuel at Causeway
September 4, 2023 ROB after Refuel 20,000.00

TOTAL

M/T VICTOR 1
DATE PARTICULARS R.O.B
June 23, 2023 Arrival in Homonhon 99,610.00
August 2, 2023 Upon Arrival from Shelter 88,960.00
September 2, 2023 Upon Arrival from Shelter 79,207.00
September 5, 2023 ROB Before Refuel 77,910.00
September 5, 2023 Refuel at Causeway
September 5, 2023 ROB after Refuel 82,910.00
October 7, 2023 ROB 71,420.00
October 11, 2023 ROB Before Refuel 70,820.00
October 11, 2023 Refuel at Causeway
October 11, 2023 ROB after Refuel 80,720.00
October 18, 2023 ROB 78,870.00
October 31, 2023 ROB Before Refuel 75,660.00
October 31, 2023 Diesel Delivered
October 31, 2023 ROB after Refuel 83,080.00
November 1, 2023 ROB Before Refuel 82,990.00
November 1, 2023 Diesel Delivered
November 1, 2023 ROB after Refuel 92,990.00
November 12, 2023 ROB 90,590.00
November 15, 2023 ROB Upon Departure in Homonhon 90,100.00

TOTAL
REFUELED CONSUMPTION PER DAY

13,148.00 692.00
11,600.00

32,000.00 1,396.00
698.00
763.00 763.00

-
9,271.00 545.35
3,303.00 660.60
15,000.00

15,000.00 7,880.00 463.53

6,796.00

1,023.00
10,000.00

2,000.00

10,000.00

1,418.00 709.00

16,000.00 1,977.00 247.13

20,000.00 8,609.00 573.93

6,374.00 579.45

10,000.00

75,558.00 566.44 Average per day


REFUELED CONSUMPTION PER DAY

6,955.00
6,155.00

13,110.00 Average per day

REFUELED CONSUMPTION PER DAY

962.00 240.50
10,000.00

1,550.00 172.22

10,000.00 2,512.00 206.36 Average per day

REFUELED CONSUMPTION PER DAY

920.00
2,370.00 338.57
900.00 300.00
7,000.00

8,090.00 278.97

10,000.00 9,000.00 272.73

4,630.00 162.82

8,000.00

-
2,000.00

5,655.00 353.44
5,000.00
655.00
4,465.00 248.06
7,000.00

12,600.00

36,685.00 244.32 Average per day

REFUELED CONSUMPTION PER DAY

4,200.00 110.53
3,000.00
3,100.00 147.62
10,000.00

3,200.00 307.20

7,000.00 2,500.00 312.50

3,210.00 239.25
3,380.00 109.03

10,000.00

6,599.00
8,022.00 286.50
5,000.00

37,211.00 216.09 Average per day

REFUELED CONSUMPTION PER DAY

21,580.00
140.00
3,840.00 640.00
15,000.00
9,300.00 547.06
2,900.00 483.33
10,000.00

9,700.00 692.86
10,700.00 668.75
15,000.00

5,100.00 541.59
8,300.00
600.00
10,000.00

10,000.00

15,000.00

6,350.00 496.69

10,000.00

5,200.00 742.86

8,250.00

83,710.00 601.64 Average per day

REFUELED CONSUMPTION

10,650.00 266.25
9,753.00 314.61
1,297.00
5,000.00

11,490.00 359.06
10,000.00 7,090.00 196.94
1,850.00 264.29

7,500.00 3,210.00 246.92

10,000.00 90.00 90.00

2,400.00 218.18

47,830.00 244.53 Average per day


MT TOFFER/JOSEFA
DATE ITEM QTY
April 03, 2023 Welding Machine
April 03, 2023 Welding Rod #6011 10 Kls.
April 10, 2023 Welding Machine
April 10, 2023 Welding Rod N7018 5 kls.
May 11, 2023 Welding Rod #7018 25 kls.
May 11, 2023 Acetyline 1 tank
May 11, 2023 Oxygen 1 tank
November 1, 2023 Engine Oil 200 ltrs

MT CAPH/AURIGA
DATE ITEM QTY
March 09, 2023 Used tire 8 pcs.
March 16, 2023 Welding Rod 600x4.0x5/32 20 kls.

LCT GRANDWISH 8
DATE ITEM QTY
March, 2023 Used tire payloader 4 pcs
March, 2023 Used tire Dumptruck 8 pcs

M/T CLYDE/CLUDIA
DATE ITEM QTY
April 17, 2023 Rope Guard 4 pcs.
April 29, 2023 Used Tire 2 pcs.
May 07, 2023 Engine Oil 15W40 200L
Hydrolic Oil VG68 200 L
July 15, 2023 July 15, 2023 7

M/T LARRY/CELINE
DATE ITEM QTY
May 01, 2023 Welding Machine
May 01, 2023 Welding Rod N7018 5kls.
April, 2023 Used Tire Payloader 1 pc.
April, 2023 Welding machine
April, 2023 Welding Rod N7018 5kls.
April, 2023 Acetylene 1 tnk
April 04, 2023 Welding Machine
April 27, 2023 Used Battery 12V150 AH EMTRAC 1 pc
April 27, 2023 Empty Drum 1 pc
June 3, 2023 Petron 15W40 Engine Oil 100 L
June 13, 2023 Welding Rod 6011 5 kg
June 13, 2023 Welding Rod N-7018 5kg
June 13, 2023 Oxygen 1 tank
June 13, 2023 Acetylene 1 tank
June 17, 2023 Welding Rod 7018 10 kg
June 17, 2023 Acetylene 1 tank
June 17, 2023 Oxygen 1 tank
June 17, 2023 Angle Bar 2x2 2 pc/s
July 4, 2023 Oxygen 1 tank
July 4, 2023 Acetylene 1 tank
July 4, 2023 Welding Rod 7018 5 kg
July 4, 2023 Diesel 15 L
July 6, 2023 Diesel 10 L
August 17, 2023 Oxygen 1 tank
August 17, 2023 Acetylene 1 tank
August 17, 2023 Diesel 20 L
August 17, 2023 2'X2'X1/4" MS Plate 1 pcs
September 5, 2023 Welding Rod 7018 4 bag/s
September 5, 2023 Oxygen 2 tank
September 5, 2023 Acetylene 2 tank
September 5, 2023 Diesel 30 ltrs
September 5, 2023 Ms Plate 4x4x1/4 1pc
September 30, 2023 Oxygen 2 tank/s
September 30, 2023 Acetylene 2 tank/s
September 30, 2023 Ms Plate 4'x4'x1/2" 1 pc/s
September 30, 2023 Welding Rod 7018 20kg
September 30, 2023 Diesel 30 ltrs
October 11, 2023 Oxygen .5 tank
October 11, 2023 Acetylene .5 tank
October 11, 2023 Diesel 20 ltrs

M/T CLARRA/NECA
DATE ITEM QTY
April 04, 2023
April 29, 2023 Petron 15W40 Engine Oil 160 L
May 08,2023 Welding Machine
May 08,2023 Welding Rod N7018 5 kls.
May 14, 2023 Oxygen 1 tnk
May 14, 2023 Acetelyn 1 tnk
July 6, 2023 Petron 15W40 Engine Oil 200 L
September 4, 2023 Petron 15W40 Engine Oil 3800 L

M/T VICTOR/JOSEFA
DATE ITEM QTY
July 4, 2023 Koyo Ball Bearing 2 pcs
November 1, 2023 15W40 Engine Oil 400 L
PROJECT
To repair Ramp Pin
To repair Ramp Pin
To repair Ramp Pin
To repair Ramp Pin
To repair and fabricate a
new pod eye of the ramp pin at the
Starboard side of S/B Josefa.

PROJECT
Additional Fender of Barge Auriga
To Repair Bitts and Coaming(Cargo Hold)

PROJECT
For Render
For Render

PROJECT
To be used in Barge Cluadia
Use for defence during manuevering

pc/s in Barge Cluadia

PROJECT
For ramp repair
For ramp repair
For Render
Repairing for ramp.
Repairing for ramp.

For Repairing Tugbaot Larry poop deck bitts, Starboard side bitts
For Storage

For Repairing of Barge Celine cargo flooring Port side


For Repairing of Barge Celine cargo flooring Port side
For Repairing of Barge Celine cargo flooring Port side
For Repairing of Barge Celine cargo flooring Port side
For Repairing of Barge Celine cargo flooring Starboard side
For Repairing of Barge Celine cargo flooring Starboard side
For Repairing of Barge Celine cargo flooring Starboard side
For Repairing of Barge Celine cargo flooring Starboard side
To repair their damaged ramp pin holder
To repair their damaged ramp pin holder
To repair their damaged ramp pin holder
To repair their damaged ramp pin holder
To Repair deck Flooring of Barge celine
For Repairing of Barge Celine damage ramp.
For Repairing of Barge Celine damage ramp.
For Repairing of Barge Celine damage ramp.
For Repairing of Barge Celine damage ramp.
For repairing of Barge Celine ramp pin pod eye
For repairing of Barge Celine ramp pin pod eye
For repairing of Barge Celine ramp pin pod eye
For repairing of Barge Celine ramp pin pod eye
For repairing of Barge Celine ramp pin pod eye
For Repairing of Barge Celine damage flooring ramp & pod eye
For Repairing of Barge Celine damage flooring ramp & pod eye
For Repairing of Barge Celine damage flooring ramp & pod eye
For Repairing of Barge Celine damage flooring ramp & pod eye
For Repairing of Barge Celine damage flooring ramp & pod eye
For Repairing of Barge Celine damage flooring
For Repairing of Barge Celine damage flooring
For Repairing of Barge Celine damage flooring

PROJECT

Empty stock
To install ramp, pin and hinges.
To install ramp, pin and hinges.
To repair Ramp pin and pod eye.
To repair Ramp pin and pod eye.

PROJECT
For repairing pumps

You might also like