You are on page 1of 1

INTERIOR EXTERIOR INTERIOR

32
13
6.5 6.5
5.5 8 5 4 9.5
MORTAR

CF-1 CF-1 CF-1


WF-2 10mm Ø VERTICAL REBAR WF-1
WF-1 BLOCKFLASH
FINISH FLOOR LINE
5

FINISH GRADE GRAVEL BED

WF-1 WF-1

3
2.5
CF-1 CF-1 CF-1 CF-1 ENGINEERED SOIL
CF-1
WF-1 WF-1
WF-1

0.7

0.7
CF-1 WF-2 CF-1
CONCRETE STEM WALL
1

WF-1

0.25

0.25
ELEV. 10mm Ø VERTICAL REBAR O.C.

0.1
3.5

WF-1
WF-1
WF-1 @ 0.50m WF-1 ELEV. ALTERNATE DIRECTION OF LEGS
2.5

@ 0.50m 0.2
WF-2 0.15

5.5
WF-1
LONGITUDINAL BARS
WF-1 0.3 0.5
WF-2
ELEV. CF-1
CF-1 @ 0.50m ELEV.
CF-1 @ 0.20m

14.5
CF-1

WF-1
WF-1

11
WF-2 CF-1 02 WALL AND FOOTING DETAILS
11
4.5

WF-1
CF-1
CF-1 CF-1
ELEV. S 03 SCALE: 20:1
24

@ 0.50m
ELEV. ELEV.
CF-1 @ 0.50m CF-1
@ 0.50m

5.5
CF-1 WF-1
WF-2
ELEV.
WF-1
@ 0.50m ELEV.
3

WF-1 @ 0.20m
WF-2

WF-1 CF-1 CF-1 CF-1 CF-1


CF-1

1
4

WF-1 WF-1
CF-1 CF-1 CF-1
2.5

WF-1
WF-1
ELEV.
@ 0.50m 1.2
5.5

WF-1
WF-2 0.3 6 - 20mm Ø RSB

4.5
WF-1 WF-1 VERT. BARS

0.3
ELEV.
@ 0.50m

8 - 20mm Ø

1.2
N.G.L. RSB BASEBARS
WF-1 WF-1 WF-1
CF-1 CF-1 CF-1 CF-1
2.5

1.5 4.5 4.5 3 3 4.75 4.75


6.5 12 4 9.5
6 - 20mm Ø RSB VERTICAL BARS
W/ 10mm Ø HOOPS SP @ 180mm

8 - 20mm Ø RSB BASEBARS


SPACING @ 160mm O.C. BW
CF-1

0.3
01 FOUNDATION PLAN 03 COLUMN AND FOOTING DETAILS
S 03 SCALE: 3.5 : 1 GRAVEL BED
S 03 SCALE: 18:1

0.3
1.2

DRAWN BY: APPROVED BY: PROJECT TITLE: SUBJECT COURSE: SCHOOL: SHEET NO.:
UNIVERSITY OF NUEVA CACERES
TRISHA MAE A. DELOS SANTOS PROPOSED TWO STOREY S1
ENGR. SAMUEL E. BULALACAO BUILDING
RESIDENTIAL BUILDING SHEET CONTENT:
STUDENT NO.: 15 - 15910 Instructor SYTEMS DESIGN 01 01
NOOK FILINVEST CORPORATE CITY, ALABANG, MUNTINLUPA
CONSTRUCTION FOUNDATION PLAN
DATE: NOVEMBER 5, 2023