Professional Documents
Culture Documents
Logistics Route Configuration
Logistics Route Configuration
LOGISTICS EXECUTION
➔ Transportation
➔ Batch Management
➔ Automatic Packaging
A) Transportation
➔ Route
➔ Route Determination
➔ Shipment Document Type
➔ Shipment Cost Document Type
➔ Shipment Cost Item Categories
➔ Activity Profiles
➔ Split Profile ( before planning, after planning )
➔ Planning Profile
a) Planning profile will help to plan the shipment in sales order itself.
b) Multi-Dimensional Pricing
→Automatic PO Generation.
→CO Integration.
→Transferring shipment cost to Invoice.
→Shipment cost settlement.
Process:-
➢ Shipping type procedure group is one of the parameter to determine shipment cost
pricing procedure is shipment cost document
As per above scenario we have 11 transportation connection points. i.e. 1 is loading & 10 is
unloading points.
➢ In transportation connection point for customer’s location, you have only one customer
then go to “Reference Customer/Vendor” and assign the customer number.
➢ If you have multiple customers then we should not assign the customer number, then
you have to maintain address for that transportation connection point
save
➢ In Direct Leg the departure point is always shipping point. i.e. loading point
Again new entry
Save
e) Route Determination:-
Save
Go to customer master address tab and assign relevant designation zone
Then select the combination and double click on Route Determination Without Weight Group
(Order)
New entry
Save.
Note- we have transportation group in material master sales/General plant
Now create order and check the Route.
Save and double click on Maintain Details for Weight Groups (if there any existing then
delete them)
New entry
Back and click on Maintain Route Determination select combination and double click on
Route Determination with Weight Group (Delivery)
New entry
Save
save
5. Define Allowed Actual Route By Proposed Route:-
New entry
save
➢ Proposed route is sales order route and actual route is delivery route.
Shipment Document
Path-SPRO→LE→Transportation→Shipments→ Maintain Transportation Relevance
9. Pick Check- this field controls that while creating shipment document whether to
check the picking status or not
10. Split profile before planning & after planning- split profile will help to split the
deliveries in shipment document based on truck capacity.
11. Selection Variant- variant consists of selected input parameter and which will be
used while doing collective processing.
Give some number and click on maintain.
Maintain shipping point
Click on Attributes
Give some description & save
12. Planning Profile- planning profile will help to plan the shipment cost in sales order
itself
13. Copy Routine- copy routine will help to copy the transportation relevant data from
delivery to shipment document. Copy routine “9”
Click on maintain, continue, scroll down, select carry out goods issue posing during save.
Tick on carryout billing, click on attributes, variant name 11, description Active profile
Test, save, back, save.
Path→SPRO→LE→Transportation→Shipment Cost
a) Go to Shipment Costs→Basic Function→Define and Assign Traffic Zones
This will help to maintain shipment cost condition record its consists of group of postal
code
Save
Double click on define organization key for tariff zone assign. New entry
Then select above combination and click on assign tariff zone to org key and post code
area. New entry.
Go to customer master, shipping point and transportation connection point and maintain the relevant
postal codes.
b) Shipment cost Document:-
1. Shipment Cost Types and Item Categories
The standard shipment cost type is 0001, new entry
Save
Overall Status of shipment- this field control at which status of shipment document system
should allow to create shipment cost document
Maintain “5 shipment completion” & save, double click on
Define item category-standard in “0001” select & copy, create your own.
Item Determination Group- Item determination group is one of the parameter to determine
shipment cost pricing procedure
Account assignment category for Transportation is “K”
Generate PO-This field controls whether to generate PO automatically or not while creating
shipment cost document, if yes then maintain “B” save
Double click on Assign shipment cost types and item categories give shipment cost type and
new entry.
c) Pricing:-
Pricing control
1. Define Price Dependencies (Condition Tables)→click on create condition table
For shipment cost we maintain condition table with the combination of service
agent, tariff zone departure and tariff zone destination.
Take below field from catalogue.
Service agent f.stage
Tf zone point of dep
Tf zone destination generate the table & save.
Save
d) Settlement:-
1. Assign Purchasing Data
This configuration step is for Automatic PO
Here with the combination of transportation planning point and shipment
cost type.
We assign Pur Org group and plant- new entry
save
2. Maintain Account Assignment Category
The account assignment category for shipment cost is “K” cost center
Acct Modification VBR
Create Cost element:- FS00 & Create Cost Center- KS01
Save
Save
While creating shipment Cost document you will get some number range error. To avoid that we need
to run a program in SE38
Program RKTKAULIC & execute after this go to KANK click on copy from 1000 CO to your CO area & Save.
Before creating order we need to remove the TCONTA route
Order
Deliver
Enter
1st Give Fwd Agent & Click on
deliveries→give shipping point→Route→Execute
Select the Delivery and click on Overview→enter→Go to Deadline Tab→ click on Planning→ to see leg
go to Stages and check the leg indicator→ if you want to see the price→ click on Freight cost
estimate→ go to deadline tab complete the activities Planning, check in, loading star, loading end,
shipment completion→ save it
Whenever we save shipment document system will do PGI and Invoice in background
Save
c) Go to Shipment Cost→
Path→ Path-SPRO→LE→Transportation→Shipments Costs→ Shipment Cost
Document→ Shipment Cost Relevance and Default for Shipment Cost Type
Go to your shipment type and assign shipment cost type→ save→ select line→click
on Define shipment cost relevance for shipment type→ tick on leg→save
Maintain condition Record TK11- maintain all condition type for discount, service agent & tax & save
A-Absolute
B-Relative
C-Confirmation
Go to Calculation Tab→Calc Rule “R” distance→save
You will get Scale ID Number
Maintain Condition Record- TK11 for IMUL also maintain scale & save
Place this IMUL condition type in pricing procedure.
Create some condition type in sales with same controls and without access sequence:-
V/06→ New entry→ Cond. Type ITRA (transfer cost)→ Cond Class “A”→Cal Type “A”→tick item
condition→ save
Place the condition type in your (sales) pricing procedure:- V/08 place it & save
Activity Profiles:-
Path→spro→LE→Transportation→Shipments→Define and Assign Activity Profiles
In that uncheck carryout billing
Select your shipment type & “11” At completion, select the line & click on Maintain tab in header &
untick carryout billing & save
Maintain Condition Record for New Condition Type:- TK11→ Cond Type ITRA→service agent→amt
100%--> Save
Then process below Step after configuration.
Order, Delivery, Shipment Document (VT01N) , Shipment Cost Documents (VI01) & Invoice.
Note-before maintaining the condition record go to VTFL→ change Mode→Billing type F2→Delv typ
LF→select F2-LF→Tan→go to details→maintain pricing source as F
SPLIT PROFILE
It is the process of splitting the deliveries in shipment document based on truck capacity.
CONFIGURATION
Path →SPRO→LE→Shipping→Deliveries→Subsequent delivery split→select the standard 0001 and
copy→select split profile which created(I100)→click copy all→save→go to shipment type (Define
Shipment type)→go to your shipment type (I100) Split profile before planning & after planning
I100→save
Before Planning- Create order for 90 qty→create delivery→VT01N Shipment Document→in VT01N→go
to delivery→select delivery & click on delivery split→change qty 50→enter→simulate split→you will
get two line items→save it and then click on Blue Color close button→select deliveries→go to
Overview→and then do planning, check in, loading start, loading end, shipment completion→save it→
this is for Split before planning.
After Planning-In after planning split deliveries first we do planning and after that create order for 90qty.
Go to delivery VT01N→Click on Split deliveries→changed the qty 40→ simulate split→you will get two
line items→save & then click on Blue Color Button→then select the delivery→go to Overview and
check as per before planning
PLANNING PROFILE
Planning profile will help to plan the shipment in order itself i.e. which route is feasible.
CONFIGURATION
Go to Shipment Type
Go to planning profile “1” (some number)
Click on Maintain
Click on Continue
Mention some selection variant “1111”
Click on Maintain
Mention Shipping Point
Mention Route
Click on Attribute
Variant Name “1111”
Description “Test” Save & back
Mention Grouping Criteria “1111”
Click on Maintain
Tick on Shipping Point/Receiving Point
Tick Route
Click on Attributes
Variant & Description
Date & Option “1111” and Click on Maintain
Transport Planning Point I100
Shipment Type I100
Service Agent
Shipment Route Shipping Condition “01”
Shipping Type I1
Shipment Cost relevant tick Procedure
Click on Attribute
Variant “1111”
Description “Test” go back & save
Then Create Order, in order go to extra →shipment cost information→mention shpt type→service
agent→ship type→execute & Click on Log
C) Individual Shipment with Multi-mode of Transport:-
Or
Copy 0005 create I005→Shipping type I2→Service level 1Load→ Process control 3 Individual
shipment using several modes of transport→ Leg Indicator 2Main Leg→ Adopt Route 1Only
stages with leg indicator of shipment header→Determine Leg Blank:No Leg to be
Determined→Save
Save
Double click on define shipment cost relevance for shipment type
Go to your shipment type
If you want load transfer only check for main leg
PRICING:-
Price control
a) Define price dependencies
b) Define And Assign Pricing Procedures:- click on Define pricing procedure
determination for shipment costs
Shipment Cost I100→select T.P.Pt and double click on determine pricing
procedure→go to new entry
While creating sales order if you want rail route then go to header data & change shipping condition
from 01 to 02
We need to define shipping point determination SC:02 for route determine in order.
Create Order, delivery, create shipment document VT01N
In Preliminary leg when you click on planning then system will ask for destination point for preliminary
leg ISEC
Click on Inspection→then you do activities→then create shipment document VI01→do same for other
VI04 (collective shipment list) collective processing of shipment cost Doc.
Go to routes and stages and add the stages from VIZAG to VIZIANGARAM and Vzianapuram to
Srikakulam
And we have to maintain condition records for VIZAG to Vizianagaram and Vizianararam to Srikakulam
TCode VK11
Create order for Vizag & Vizianagaram customers & Create delivery.
save
Go to T_73
Select you Tpp I100 & double click on
New entry
Now create order ,delivery, shipment document VT01N for preliminary leg next one more shipment
document for main leg
Create one vendor and maintain Partner Function is TV