You are on page 1of 1

PT PLN (PERSERO)

UNIT INDUK DISTRIBUSI BANTEN


UP3 CIKUPA

RENCANA ANGGARAN BIAYA

Pekerjaan : Pengisian APAR dan perbaikan Alat proteksi kebakaran


Alamat : UP3 Cikupa
No RAB : 006.RAB/K3L/UP3CKP/2023
Tanggal : 23 November 2023

HARGA
BERAT ISI
NO MERK JENIS JUMLAH PENGISIAN Jumlah (Rp) KETERANGAN
(KG)
SATUAN
LANTAI 1
1 PATRON AF 11 3 1 557.700 1.673.100
2 PATRON AF 11 3 1 557.700 1.673.100
3 PATRON AF 11 5 1 557.700 2.788.500
4 PATRON AF 11 3 1 557.700 1.673.100
5 PATRON AF 11 3 1 557.700 1.673.100
6 PATRON AF 11 5 1 557.700 2.788.500

LANTAI 2
7 PATRON AF 11 5 1 557.700 2.788.500
8 PATRON AF 11 5 1 557.700 2.788.500
9 PATRON AF 11 5 1 557.700 2.788.500
10 PATRON AF 11 5 1 557.700 2.788.500
11 PATRON AF 11 5 1 557.700 2.788.500
12 PATRON AF 11 5 1 557.700 2.788.500
13 PATRON AF 11 5 1 557.700 2.788.500
14 PATRON AF 11 5 1 557.700 2.788.500
15 PATRON AF 11 5 1 557.700 2.788.500
16 PATRON AF 11 5 1 557.700 2.788.500
17 PATRON AF 11 3 1 557.700 1.673.100
18 PATRON AF 11 5 1 557.700 2.788.500
19 PATRON AF 11 3 1 557.700 1.673.100
20 PATRON AF 11 5 1 557.700 2.788.500
Perbaikan Pipa Hydran Bocor Cikupa tebal
21 Mtr 16 850.000 13.600.000
6"
22 Komisioning Hydran Unit 1 1.000.000 1.000.000
23 pengisian dexlite hydran Cisoka & Cikupa Ltr 100 17.200 1.720.000
Perbaikan panel Auto jockypump Cikupa
24 Bh 2 4.500.000 9.000.000
dan Cisoka

TOTAL Rp 74.397.600
PPN 11% Rp 8.183.736
JUMLAH TOTAL Rp 82.581.336

Cikupa, 23 November 2023


TL K3L & KAM

HAMDAN HIDAYATULLOH