Gama Construction

Operations Division
Material Supply Requisition
ALBROUJ VILLAS
Project Name: MSR No: 499
PARCEL 1.3.1

Project Code : BRO-210 Issue date: 12/18/2023

by Technical Office Store keeper Inventory Dept.


Approved BOQ QS Qty Max. Waste Total Project Qt Total Qty delivered Qty Qty in project Final Net Requested
Material Unit of Required Date
No. Item No BOQ / V.O item Material budget rate Qty (3) % Including Waste to site Requested Store Material Availability Equivalent Material (if possible) Qty Building Notes
Description Measure on site (8)
(1) (2) per villa (4) (5) (6) (7) (for info) (9)

1 ‫ مم‬25 ‫ كوع‬BR ‫لحام‬ PR Bannger ‫عدد‬ 8

2 ‫ جلبة لحام‬BR 20‫مم‬ PR Bannger ‫عدد‬ 30

‫ سيفون حوض ديورافيت‬Bottel Trap


3 Duravit ‫عدد‬ 6
x999911400900
‫ فلتر خالط حوض‬Lav Mixer
4 Model: Grohe ‫عدد‬ 30
233800A
‫ فلتر خالط شاور‬Shower Mixer
5 Grohe ‫عدد‬ 30
3282000A
6 ‫بكرة تفلون‬ ‫عدد‬ 15
‫مانع ارتداد ريحة لبالعة صرف الشاور‬
7 Kessel ‫عدد‬ 100

‫مانع ارتداد ريحة لبالعة صرف الحمام‬


8 Kessel ‫عدد‬ 600

9 ‫ مانع ارتداد ريحة‬Gully Trap Smart Home ‫عدد‬ 400

‫ طابق خالط حوض‬Lav Mixer


10 Model: Grohe ‫عدد‬ 15
233800A

12 ‫ غطاء‬Gully Trap Smart Home ‫عدد‬ 18


13 )3/8(/)1/2( ‫بوش نيكل‬ ‫عدد‬ 20
14 ‫ أمريكى‬717 ‫لزق‬ ‫عدد‬ 10

15 ‫شحم نباتى‬ ‫عدد‬ 25


16 ‫ بوصة‬8 ‫طبة تسليك بالجوان قطر‬ Wilson ‫عدد‬ 1
Gate Valve Crane40mm
17 Model : DN180 Crane ‫عدد‬ 1
pn 32
Exhaust Fan
18 ‫عدد‬ 1
50 LPS of air flow, and 0.100 kPa

19 ELECTRICAL WATER HEATER 30litre olympic ‫عدد‬ 1

Exhaust Fan
20 ‫عدد‬ 1
50 LPS of air flow, and 0.100 kPa

21 ‫طقم تثبيت مسمار سخان‬ ‫عدد‬ 1

22 6 ‫ألنكيه‬ ‫عدد‬ 2

23 ‫ بوصة‬1.5 ‫جوان سيفون حوض‬ ‫عدد‬ 100

24 ‫ بوصة‬3/8 ‫جوان‬ ‫عدد‬ 35

25 ‫ بوصة‬1/2 ‫جوان‬ ‫عدد‬ 35


26 ‫ بوصة‬3/4 ‫جوان‬ ‫عدد‬ 35
27 ‫ بوصة‬1 ‫جوان‬ ‫عدد‬ 35
28 ‫ مم‬10 ‫فيشر‬ ‫عدد‬ 5
29 ‫ مم‬10 ‫أكمون‬ ‫عدد‬ 5
30 ‫ مم‬8 ‫فيشر‬ ‫عدد‬ 5
31 ‫ مم‬8 ‫أكمون‬ ‫عدد‬ 5
32 Down spout Conductor Nozzle ‫عدد‬ 145
33 upvc pipe 75 mm Misr Elnour ‫عدد‬ 20
Hebish or
34 HDPE 75 mm ‫عدد‬ 3
Elbor
Hebish or
35 ELBOW 40 mm HDPE 45 Degree ‫عدد‬ 18
Elbor
Hebish or
36 ELBOW 50 mm HDPE 45 Degree ‫عدد‬ 8
Elbor
37 ‫ محبس دفن‬PR ‫ بوصة‬0.5‫قطر‬ PR Bannger ‫عدد‬ 5

‫ اكسسوار وش سيفون حوض ديورافيت‬Bottel Trap


38 Duravit ‫عدد‬ 12
x999911400900

PRF-08-01-01 Page 1 of 2 Rev.No:02


Gama Construction
Operations Division
Material Supply Requisition
ALBROUJ VILLAS
Project Name: MSR No: 499
PARCEL 1.3.1

Project Code : BRO-210 Issue date: 12/18/2023

by Technical Office Store keeper Inventory Dept.


Approved BOQ QS Qty Max. Waste Total Project Qt Total Qty delivered Qty Qty in project Final Net Requested
Material Unit of Required Date
No. Item No BOQ / V.O item Material budget rate Qty (3) % Including Waste to site Requested Store Material Availability Equivalent Material (if possible) Qty Building Notes
Description Measure on site (8)
(1) (2) per villa (4) (5) (6) (7) (for info) (9)
‫ فلتر خالط حوض‬Lav Mixer
39 Model: Grohe ‫عدد‬ 12
233800A

‫ فلتر خالط شاور‬Shower Mixer


40 Grohe ‫عدد‬ 12
3282000A

Portable Fire Extinguhser with holder 6


41 Bavaria ‫عدد‬ 1
kg -ABC Type Dry Powder
Requested by T.O Eng. Reviewed by Cost Engineer by store keeper Approved by PM
Name: Name: Name: Name:
Signature: Signature: Signature: Signature:
Form Key Related Notes
1:- Material rate according to latest approved budget 6:- Total Quantity delivered to site up to date of request 1- (6)+(7) is no greater than 5

2:- Quantity according to BOQ 7:- (6)+(7) is not greater than (5) 3- All transferred materials will be 50% discounted

3:- Quantity according to QS from T.O. 8:- MSR should be issued before 14 days from the required date on site 4- Inventory dept. to provide its feedback within 1 or 2 working days , then PM approval and to Purchasing to proceed
4:- Waste according to latest approved budget 9:- Final quantity for purchasing to proceed 5- PM should reapprove this form especially if there is a suggested Equivalent materials
5:- Total Project Planned Quantity including waste = (2 or 3) + 4