Professional Documents
Culture Documents
The statements dated January 15, 1998, certifying that AlliedSignal Aerospace, has established
a fabrication inspection system that meets the requirements of 14 CFR part 2 1.303(h) for the
parts listed, are accepted.
Should you have any questions regarding this matter, you may wish to direct them to the
Detroit Manufacturing Inspection Satellite Office at telephone number (313) 487-7396.
Sincerely,
fr2
Matthew E. Tomsheck
Manager, Manufacturing
Inspection District Office
Enclosure
PARTS MANUFACTURER APPROVAL NO: PQ2O66CE-D
PRODUCTION APPROVAL LISTING SUPPLEMENT NO: 10 -
AlliedSignal Aerospace
Courter Operations
375 North Lake Street
Boyne City, Michigan 49712
Flap Skew Sensor P/N: 9000421-2 Boeing PIN: Licensing Agreement per Boeing 737-700
S256A404-2 ltr. from Boeing
Cnmrnrcial Airpane
Group dtd. 1/12/98.
TC: A16WE
AlliedSignal Dwg. No:
9000421-2, Rev. dtd.
-
Flap Pos. Trans. P/N:l8-1738-lO Boeing P/N: Licensing Agreementper Boeing 737-700
S256A404-50 ltr. from Boeing
Commercial Airplane
Group dtd. 1/12/98.
TC: AI6WE
AlliedSignal Dwg. No:
18-1738-10, Rev. G dtd.
9/6196.or later FAA
Approved Revision
End of Listing
Matthew E. Tomsheck
Manager, Manufacturing
Inspection District Office