PARAMETER
(RECTANGULAR
BUILDING)
OUTSIDE (Pe)
PERIMETER
INSIDE (Pi)
Work hours
Productivity rate
Adjusted work hours
PRICING LABOUR
Depreciation
Repair
Interest cost per hour
Volume of cut
Owning costs
Operating costs
Fuel cost
Maintenance (cost/hr)
Oil Cost
Labour
Total Cost of Oil Change
Cost per hour
Tire Depreciation
Tire repair
Tire cost
Hourly cost of equipment/overhead
produtivity rate = no. of work hrs/ unit of work
UNIT 4 & 5
Prime Perimeter+ 8d
Prime Perimeter - 8d
Quantity takeoff x Productivity rate
number of work hours/ unit of work
Work hours x Productivity factor
Work hours x hourly wage rate
Quantity required X Productivity Rate
Cost / Useful life
Original Cost – Salvage Value
Typically 15% of depreciation
CxIxL/2XH