Professional Documents
Culture Documents
SUMATORIA
CENTRO DE PARCIAL
CENTRO DE SERVICIO A.P.E.V.I.S. A.H. SOR ANA ASOCIACION DE ASOC. CASA HUERTA CENTRO DE SERVICIO A.H.
A.P.P.A. ALAS A.V.V. SEÑOR DE A.H. JESUS A.H. SERVICIO E A.H. SOL DE VILLA EL VILLA SAN SEÑOR DE
SAN JOSE SAN CAMILO ESTRELLA DE DE LOS VIVIENDA NUEVA GRANJA "NUEVO ASENTAMIENTO VI SAN SANTA
DEL SUR LOS MILAGROS NAZARENO PRIMAVERAL IRRIGACION SAN ORO MILAGRO CAMILO HUANCA
ASENTAMIENTO 7 ORO ANGELES ESPERANZA AMANECER" CAMILO ROSA
CAMILO 5
TUB. 250 mm
TUB. 200 mm - - - - - - 2,395.32 - - 1,631.19 - - - - - - - 4,026.51
TUB. 160 mm 1,958.50 - 77.11 - - 2,879.39 - - 718.69 - 1,791.38 1,188.85 - - - - 307.24 8,921.16
TUB. 110 mm 3,124.75 3,612.50 15.64 68.10 - 10.00 70.83 - 771.64 162.96 556.87 - - - - - - 8,393.29
TUB. 90 mm 2,422.34 2,617.90 - - - - 1,753.20 - 4,077.64 3,338.96 883.49 825.27 4,389.98 - - - 1,055.16 21,363.94
TUB. 63 mm - - - - - - - 892.80 - - - - - 621.00 358.62 359.26 - 2,231.68
- -
NUMERO DE
CONEX. 276.00 90.00 122.00 33.00 112.00 136.00 56.00 29.00 100.00 37.00 8.00 15.00 11.00 1,025.00
DOMICILIARIA
DESCRIPCION SECTOR LA CANO SECTOR SAN ISIDRO SECTOR LA REPARTICION
ASOC. VIV. SUMATORIA SUMATORIA
CENTRO DE A.H. PARAISO
SAN LUIS LA "NUEVO VILLA HERMOSA A.H. EL PROGRESO 48 (LA A.H. LA UPIS PARCIAL TOTAL
A.H. ALTO LA CANO SERVICIO SAN DEL LECHE GLORIA
CANO AMANECER" - -SAN ISIDRO CHAPARRAL REPARTICION) FLORIDA CRISTO REY
ISIDRO CAMPESINO
LA CANO
TUB. 250 mm - 677.16 - 677.16
TUB. 200 mm - - - 184.35 - - - - - - - 184.35 4,210.86
TUB. 160 mm - - - 1,180.11 - - - 744.5 137.61 - 2,062.22 10,983.38
TUB. 110 mm 3,080.50 700.90 2,057.55 3,416.51 915.34 - 502.50 2,486.55 991.40 11,830.50 25,981.75 34,375.04
TUB. 90 mm 2,468.00 991.38 2,335.15 2,539.39 2,226.81 7,809.17 1,546.73 3,648.80 2,101.15 10,650.60 36,317.18 57,681.12
TUB. 63 mm - - - - - - - - - - - - 2,231.68
TR Suma tub. - 110,159.24
NUMERO DE
CONEX. 177.00 - 113.00 203.00 133.00 195.00 22.00 101.00 95.00 173.00 369.00 1,581.00 2,606.00
DOMICILIARIA