You are on page 1of 3

MADHYANCHAL VIDYUT VITRAN NIGAM

LIMITED
Office of
The Exccutive Enginccr..
Electricity Distribution Division
Kaisarganj , EDC Bahraich

Leter No.3I6 EDD Kaisayganj / EDC Bahraich Datc- 31/)8/2023

From
Exccutive Enginccr,
gy Electricity Distribution Division
Kaisarganj, EDC Bahraich ,MVVNL.
To
Chicf Engincer (Revapmed)
MVVNL, Lucknow

Sub: - Submission of attendance of PMA officials of M/s WAPCOS Limited for the
month of AUGUST. 2023.
Ref: LOA issued vide letter No.3392 RESSPORevamped/PMA/MVVNL 2020-21 dated
01.10.2021

Sit; Please find encloscd herewith the attendance of following officials of M/s WAPCOS
Limited for the month of AUGUST, 2023 for the period from 01.08.2023 to 31-08.2023.

SI.
Deployed for the
Name Designation Location month
No.
01.08.2023
Akhilendra Pratap Field Engineer EDD Kaisargany to
Singh 31.08.2023

This is for your further necedful action.


Encl: - As above.

ExecytiveSineer
Electricity DisttuteT BNENBRision
Kaisarganj. EhBahkaich

EDC Bahraich
CC: 01-Superintending Engincet,Lucknow
02- M/s WAPCOS Limited, (UP)
226010
WAPCOS LIMAITED
ISO 9001: 2015
Goveiment of India Undertaking)
Mintstry of Jat shekt

Experts' Claim-cum-Verification Form


Name of Expert:aleada4.katapkiykeve: Advisor/TLE/SLE/MLEJLE
Month: Aug dst...323 ofmice Order No.:.21CXll.s... Daie.2..9)..le23
Location :Discom:lkK.l.Zone:.Aan.£a.tancircle:.2ahraich..Division./£.DL..Siswg un
Details of Task Performed/ Brief Description of works
Days Date Project Code
Day1
Day 2
1&-23lstevisit fecoay KyridaSay Polc c H-420l

Day 3
-oS-23 SG me
3.o8-23 Sane
Day 4
ASahc.
Day 5
-oß-93| Sone
Day 6 ,-S-23
Day 7
Sunday
Day 8
Day 9
-68-23 Sane
Day 10 o--22
Day 11 L-893
Day 12
12-6823l &te yst Freday kasergab) (7 folet
Day 13 a-8-23 Suh day
Day 14
-&23 fole GyOug checki iaa kls Fcsj H-H28/
Day 15 s 23Ey Ee Slz
Day 16
||6o82 Se visjd Fecaoy kunCaar HT sigg
Day 17 7-o8 22
Day 18 s-o8-23
Day 19
|9-o-23 Say e
Day 20 2o-o8-2 S n da)
Day 21
21 -o8-23 H-420l
Day 22
22 -o8 -23
Day 23 23-22
Day 24 24-68-23 Sasc
Day 25 23- o-23
Day 262 -8-23 Same
Day 27 27 -6-22
Day 28 Sundax
Day 29
28-a2 site visit Fceday G lagika Pole ex
23-8-23
Day 30 bo22 Sahc H-42
Day 313 -o&-23 Sunc
1. Claim for Services Rendered:
Remuneration
Field Alowance
Any Other Allowance:
Total

2. DDICheque No.: Payable at..... Pan, No.......


AxhLendy Prqtap Singh
Date: JLe |Field Enginect
Name & Designation of the Expert
Along with address
ED0T- Kagganj
To be filled by Division Concernedir kooyi MyeoY pu
Bihich
.Expert (TLE/SLEMLEJJLEY Advisor
1) The claim of Shri/Smt./Ku..
...is verificd.
for the period from.......4............t0....
2) The expenditure is chargeable to
3) Refercnce office order dated it is certificd that the payment for the project on which,
WAPCOS. The work assigned to the expert
the expert has been working, has been received by .is recommended
payment of Rs..
has been completed satisfactorily. Accordingly,
for release.

Signature of Officer
and Designation

HOD

Salary Section