Professional Documents
Culture Documents
a) What is the average time that catalog customers must wait before their calls are
transferred to the order clerk?
b) What is the average number of callers waiting to place an order?
c) Ashley's is considering adding a second clerk to take calls. The store would pay
that person the same $10 per hour. Should it hire another clerk? Explain.
Solution
a) The average time the catalog customer must wait, Wq, is given by
c) To decide whether or not to add the second clerk, we must (1) compute present total
cost, (2) compute total cost with second clerk, and (3) compare the two.
a) What is the probability that there are more than two students in the system? More
than three students? More than four?
b) What is the probability that the system is empty?
c) How long will the average student have to wait before reaching the cashier?
d) What is the expected number of students in the queue?
e) What is the average number in the system?
f) If a second cashier is added (who works at the same pace), how will the operating
characteristics computed in parts (b), (c), (d), and (e) change? Assume that
customers wait in a single line and go to the first available cashier.
Solution
a) The probability of more than two students in the system, Pn>2, is given by
The probability of more than three students in the system, Pn>3, is given by
The probability of more than four students in the system, Pn>4, is given by
b) The probability that the system is empty, P0, is given by
For part (b), the probability that the two-channel system is empty, P0, is given by
Thus, the probability of an empty system when using the second channel is 0.429.
For part (c), the average waiting time, Wq, for the two-channel system is given by
For part (d), the average number of students in the queue for the two-channel system,
Lq, is given by
For part (e), the average number of students in the two-channel system, L, is given by