PILE LOAD TEST CHEK LIST

PARADIP REFINERY PROJECT, IOCL


PARADIP, ORISSA
Company : ITD Cementation India Ltd.

Date: Time:
Location of test: Type of test:

Sr. No. Description Yes / No Remarks


1 Personnel involved are trained and
sound knowledge about the pile load
test including crane operator?
2 Is Tool box conducted for the load
test job?
3 Is surrounding area of pile test –
ground level condition and soil
stability?
4 Is Pile level made with sand / cement
mortar?
5 Are Hydraulic equipments and high
pressure hose in good conditions?
6 Are Electronics equipments in good
working condition and without any
error?
7 Is pressure gauge tested and test
certificate available?
8 Is Main girder good in visual
inspection?
9 Are Cross girders good in visual
inspection?
10 All loading blocks are good without
any cracks or damages.
11 No any pile excavation and other
digging jobs around 10 mtrs of load
test.
12 No heavy vehicle movement
surrounding 10 mtrs of load test.
13 Testing equipments and related tools
shall keep after 5 mtrs including
table, chairs and tent.
14 Caution boards are displayed at all
corners
15 Is Area barricaded with caution tape?

Inspection of carried out by following ITD personnels:


Inspection done by: Name of Safety Supervisor: Safety Officer’s Name:
Sign of the Supervisor: Sign of Safety Supervisor: Sign of Safety Officer:

Document reviewed by:


Sign: