You are on page 1of 4

PILE LOAD TEST CHECK LIST

PARADIP REFINERY PROJECT ,IOCL


PARADIP ,ORISSA
CONTRACTOR : ITD Cementation India Limited

CONSULTANT : UDHE INDIA PRIVATE LIMITED

Date :
Location of test :

Sr.No. Description Yes / No


1 Personnel involved are trained and sound
knowledge about the pile load test
including crane operator?
2 Is Tool box conducted for the load test job

3 Is surrounding area of pile test -ground


level condition and soil stability

4 Is Pile level made with sand / cement


mortar?
5 Are Hydraulic equipments and high
pressure hose in good conditions?
6 Are Electronics equipments in good
working condition and without any error?

7 Is pressure gauge tested and test


certificate available?
8 Is Main girder good in visual inspection?

9 Are Cross girders good in visual


inspection?
10 All loading blocks are good without any
cracks or damages?
11 No any pile excavation and other digging
jobs around 10 mtrs of load test.

12 No heavy vehicle movement surrounding


10 mtrs of load test.
13 Testing equipments and related tools shall
keep after 5 mtrs including table, chairs
and tent.
14 Caution boards are displayed at all
corners.
15 Is area barricaded with caution tape?

Inspection carried out by following ITD personnel

Inspection done by : Name of Safety Supervisor :


Signature of the Supervisor: Sign of Safety Supervisor :
Document reviewed by :
Sign
ST

Time:
Type of test:

Remarks

Safety Officer's Name:


Sign of Safety Officer: