You are on page 1of 20

DRIL-QUIP, INC.

OFFSHORE DRILLING AND PRODUCTION EQUIPMENT

MS-15 MUDLINE
®

SUSPENSION SYSTEMS

www.dril-quip.com
MS-15 Mudline Suspension Systems
®

Table of Contents

MS-15 Mudline Suspension System . . . . . . . . 2

MS-15 System Components . . . . . . . . . . . . . . . 3

• Shoulder Hangers . . . . . . . . . . . . . . . . . . . . . . . . . . 4

• Split Ring Hangers . . . . . . . . . . . . . . . . . . . . . . . . 5

• Mudline Hanger Running Tools . . . . . . . . . . . . . . 6

• Profile Cleanout Tools . . . . . . . . . . . . . . . . . . . . . 7

• Temporary Abandonment Caps . . . . . . . . . . . . . . 8

• Accessory Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

• Tie-Back Phase and Tools . . . . . . . . . . . . . . 10-11

Mudline Conversion System . . . . . . . . . . . . . 12

Dril-Thru™ Completion System . . . . . . . . . . . 13

Mudline-Related Products . . . . . . . . . . . . . . . 14

Strength & Dimension Charts . . . . . . . . . . . . 16


Dril-Quip: Leader in
Technology and Quality

R ecognized worldwide for


cutting-edge exploration,
drilling and production technology,
Dril-Quip’s state-of-the-art
equipment, support and service
give unique advantages to operators
in today’s tough environments.

Dril-Quip provides consistent high


quality products in accordance
with industry standards, employing
the most advanced equipment
and techniques available to
ensure dimensional accuracy and
performance reliability.

Our engineering staff brings their


proven skills and experience to
bear on the complex challenges
encountered in the field, helping
operators find viable product
solutions for industry applications.

1
MS-15 Mudline Suspension System
Dril-Quip’s unique MS-15
Mudline Suspension System
is a series of casing hangers
that support the weight of
each casing string at or near
the mudline. Designed for use
with bottom-supported drilling
vessels and platforms,
the system allows disconnect
from and reconnect to the well
at the mudline.

System Features
• High pressure capacity; • Designed with large
system rated for 15,000 psi flow-by areas
working pressure • Subsea completion possible
• High load capacity at each with Dril-Quip’s Mudline
hanger interface Conversion System
• Easy handling, trouble- • Critical service configurations
free operation available
• Hangers have left-hand • Extra metal-to-metal sealing
running threads, right-hand for higher pressure and
tie-back threads critical service
• Metal-to-metal seals on • Extra centralization for
running and tie-back tools high-angle drilling
with resilient backup seals • Heavier wall for greater load
• Automatic centralization and pressure capacity
ensures concentricity • Fully tested
• Stack-down system for • Field-proven technology
washout efficiency and
easy access to tie-back • Torque tool option available
thread profile for running tools
• Designed for tempo-
rary abandonment

2
MS-15 System Components
Drilling Phase

20" Shoulder Hanger

13 3/8" Shoulder Hanger

Buttweld Sub Temporary Abandonment Phase


9 / " Split Ring Hanger
58

7" Split Ring Hanger

Running Tools

30" Corrosion Cap

30" Quick-Jay™ Connector

Temporary Abandonment Caps

3
Shoulder Hangers

T here are two types of Casing Hangers


utilized in the MS-15 Suspension System:
Shoulder Hangers and Split Ring Hangers.
Shoulder Hangers are generally required with
larger-size casing strings and are used when
enough annular space exists to allow a single
load shoulder to hang the casing load and still
pass the drill bit needed for the casing string.
The Shoulder Hanger features either a single
or multiple load shoulder profile in the ID,
depending on the casing program.

Shoulder Hanger with Single Shoulder Profile

Running Tool Metal-


to-Metal Seal
Right-Hand
Tie-Back Threads
Left-Hand
Running Threads
Two-Step
Landing Ring

Features
• High pressure, high Single Load Shoulder
load capacity for Shoulder Hanger
• Easy installation; weight-
set hanger
• Field-interchangeable landing
rings accommodate changes
in casing programs
Shoulder Hanger with Multiple Load Shoulder
Hanger Profile and Split Ring Hanger Installed
• Large flow-by areas for run-
ning and cementing Running Tool Metal-
to-Metal Seal Area
• Full 360-degree load-
bearing area on landing Right-Hand
ring for maximum load- Tie-Back Threads
carrying capacity Left-Hand
Running Threads
• Unique, two-step landing ring provides automatic
centralization when landed Tie-Back Tool Metal-
to-Metal Seal Area
• Independent metal-to-metal sealing surfaces; one for
running tools, one for tie-back tools Two-Step
Landing Ring

The Shoulder Hanger will use a Multiple Load


multiple load shoulder profile in Shoulders for
Split Ring Hanger
the hanger ’s ID to transition to
the Split Ring Hanger for running
casing string with higher load- Split Ring Hanger
carrying requirements.

4
Split Ring Hangers

W hen casing loads exceed a


single load shoulder’s ability
to support the weight of the casing
string, the MS-15 system uses a
unique Split Ring Hanger with a
multiple load shoulder profile. The
system’s patented split ring and
detent ring accommodate high loads
while allowing passage of required
drill bit sizes.

Features
• High pressure, high • Positive backup of split ring
load capacity when landed
• Large flow-by areas during • Detent ring allows hanger
running and cementing resetting while eliminating shear
• Unique design ensures full pins and tensile coupons
engagement of each split • Dual metal-to-metal seals;
ring load shoulder with one for running tools, one for
mating profile tie-back tools

Split Ring Setting Sequence


1. Running Position 2. Landed/Not Detented 3. Detented Position
Hanger Body Hanger Body ­— provides Load Ring — maintains large
full centralization with flow-by area and provides high
Load Ring load ring above split ring load capacity at interface of split
Split Ring — multiple and retainer ring below ring and hanger
load shoulders on split split ring
Hanger Body ­— backup shoulder
ring protected from Split Ring — energy in provides full backup behind top
casing ID while running split ring forces multiple of split ring
Detent Ring — elimi- load shoulders into mating
profile of outer hanger ID Detent Ring — activated by casing
nates premature vertical weight and centralizes split ring,
movement of split ring provides full backup behind bottom
of split ring

5
Mudline Hanger Running Tools

T he MS-15 Mudline Hanger Running Tool allows


the casing string to be run and landed in the pre-
vious mudline hanger. The running tool incorporates
tangentially bored washports for cleaning the annulus
between casing strings. The tool’s left-hand threads
allow the use of right-hand rotation to remove the
running string or open the washports.

Features
• High pressure, high load capacity
• Low torque make-up
• Self-aligning profile allows full alignment with
hanger prior to thread engagement
• Slots for direct make-up of running tool with
torque tool are optional
• Optional stab-in running tools for
mudline hangers 16" and larger eliminate
left-hand rotation
• Dual O-rings above washports
• Seal below washport never exposed during
wash operations
• One-way seal on nose of pin prevents pressure
OPEN CLOSED OPEN
lock during make-up
• Field-proven performance

Threaded Running Tool Stab-In Running Tool

Right-hand rotation of approximately six turns opens wash- Right-hand rotation of approximately six turns with weight
ports for washout of casing. After washout, running tool is picked up opens washports for washout of casing. After wash-
made up with six turns to the left. out, weight is slacked off and running tool is made up.
6
Profile Cleanout Tools

R un on drill pipe, the MS-15 Profile


Cleanout Tool is used to verify the
RUNNING
distance to the multiple load shoulder
PROFILE CLEANOUT TOOL
profile and prepares the mudline hanger
ID for the split ring hanger. The profile
cleanout tool is rotated to clean out the
multiple load shoulder ID. Wash fluid can
be pumped through the drill pipe during
this operation.

Running Profile Cleanout Tool

Profile cleanout tool being run inside


riser with notched split ring in
retracted position

PROFILE CLEANOUT TOOL


Features LANDED
• Notched split ring for
thorough cleaning of
multiple load shoulder
profile in ID of previ-
ously-run hanger body
• Jet ports for washing
out multiple load Profile Cleanout Tool Landed
shoulder profile
• Indicator ring
verifies full cleanout
of multiple load
shoulder profile
• Used to verify the
distance to the multiple Profile cleanout tool being run inside
load shoulder profile
riser with notched split ring in
retracted position

PROFILE CLEANOUT TOOL


7
LANDED
Temporary Abandonment Caps
TA CAP WITH
TA Cap with Back-Pressure
BACK-PRESSURE Valve
VALVE

Threaded TA Cap Stab-In TA Cap

TATAcap
cap running
runningandand
retrieving tool installing
retrieving tool ins-
talling aa TA
TA capcap
withwith
back-pressure valve valve
back-pressure

Vented TATA
VENTED Cap CAP

T he MS-15 Mudline Suspension System offers


Temporary Abandonment (TA) Caps that protect
each mudline hanger’s tie-back profile from debris
during abandonment and while the well is in suspension.
Temporary Abandonment Caps make up in the hanger
running tool threaded profile and supply resilient seals
between the TA Cap and the mudline hanger.

The MS-15 system also offers a simple, weight-set,


rotation-lock stab-in TA Cap. When angular misalignment TA cap TA cap running and
running andretrieving tool tool
retrieving
is a problem, this cap allows temporary abandonment installing ainstalling
ventedvented TA cap
TA cap
of the mudline hanger. The cap’s threaded split lock ring
engages the running threads in the mudline hanger.
Temporary Abandonment
Cap Running and
Retrieving Tool
Features
An overshot type tool with three
• Simple installation J-slot profiles, the MS-15 TA Cap
• Caps make up into left-hand running threads, Running and Retrieving Tool runs
protecting tie-back threads on drill pipe and lands on the TA
cap mandrel with running and
• Full alignment prior to make-up TA Cap Running Tool retrieving J-lugs.
• Available vented or with back-pressure valve
• Low torque make-up
• Optional stab-in TA cap allows Features
weight-set make-up
• Removable back-pressure
valve stinger available
• Seals and locks to top of TA
cap mandrel
• Porting for pressure
control of well
8
Accessory Tools
Tie-Back Profile Cleanout Tool
Dril-Quip’s Tie-Back Profile Cleanout Tool runs on
drill pipe. It is used to wash out the tie-back thread
profile and the sealing surface between the tie-back
tool and the mudline hanger ID.

Temporary Abandonment Cap


Mill and Flush Tool
This component of the MS-15 Mudline Suspension
System cleans off the running and retrieving man-
drel located on the TA cap. This prepares the TA cap
retrieval J-lugs for easy access with the TA cap run-
ning and retrieving tool.

Tie-Back Profile TA Cap Mill and


Cleanout Tool Flush Tool

Features
Tie-Back Profile Cleanout Tool Temporary Abandonment Cap
Mill and Flush Tool
• Runs on drill pipe
• Uses top of hanger as reference
• Available for any size
point for positioning washout
Dril-Quip TA cap
holes at tie-back threads and
• Mills large debris from around tie-back sealing surface
TA cap mandrel
• Available for any size Dril-Quip
• Jetting nozzles wash debris from mudline hanger
around TA cap mandrel

Tie-Back Profile Cleanout Tool TA Cap Mill and Flush Tool

Tie-back profile cleanout tool cleaning out TA cap mill and flush tool cleaning TA cap
tie-back threads and metal-to-metal seal running and retrieving mandrel

9
Tie-Back Phase
Tie-Back Phase

T he stack-down configuration and unique


design features of the MS-15 Mudline
Suspension System make it an excellent choice
Tie-Back Stab-In

for production wells.

Centralizing shoulders on each hanger body help


establish concentricity around the centerline of
the well. Centralized tie-back tools incorporate
an alignment profile that forces full alignment
between the tool and the hanger body prior to
any thread engagement. Special stab-in tie-back
tools are available to solve problems with angular
misalignment and platform-to-well misalignment.

System Features
• System stacks down to fully expose
tie-back threads
• Reliable metal-to-metal sealing
• Tie-back threads and sealing areas are
unused and protected during drilling
• Hangers have left-hand running threads,
right-hand tie-back threads
• All strings tie back using
right-hand rotation

20" Shoulder Hanger


13 3/8" Shoulder Hanger
30" Buttweld Sub
9 5/8" Split-Ring Hanger
7" Split-Ring Hanger

Split Ring
Detent Ring
Stab-In Tie-Back Tools

Threaded Tie-Back Tools

10
Tie-Back Tools
Tie-Back Torque Tool

Tie-Back
Torque Tool
Threaded
Tie-Back Tool

Stab-In
Tie-Back Tool

D ril-Quip’s MS-15 Tie-Back Tools reconnect the


mudline hanger to the surface for completion.
For subsea completion, the tools tie the well back to
a tubing head.

The Stab-In Tie-Back Tool offers a simple, weight-set


design that provides an easy way to tie back to the well
when platform misalignment is a problem. It includes a
threaded split lock ring that engages the tie-back threads
in the top of each mudline hanger.

Run on drill pipe, Dril-Quip’s


Features Tie-Back Torque Tool is used to
apply high direct torque to the
• Fully aligned prior to make-up Stab-In Tie-Back Tool.
• High pressure containment provided by metal-to-
metal primary seal and resilient backup seals
• Sized to match each Dril-Quip mudline hanger
Features
• Threaded tie-back tool makes up with just six
right-hand turns for metal-to-metal seal with • Spring-loaded torque keys for
resilient backup easy torque slot engagement
• Stab-in tie-back tool’s resilient seals are weight • Sized to match each Dril-Quip
set; metal-to-metal seals energize with ½ to 1 tie-back tool
right-hand rotations
• Can be used to apply torque to
mudline hanger running tools
equipped with torque slots

11
Mudline Conversion System

Typical tie-back conversion;


alternative casing programs
and configurations available
upon request

Mudline
MUDLINE

S ubsea completions on mudline-suspended


wells are possible with Dril-Quip’s Mudline
Conversion System. This system of adapters
provides an efficient way to convert a mudline
suspension system for subsea completion. Subsea Tree

Tubing Hanger

System Features Adapter Ring


Tubing Hanger w/ Radial
• Subsea tubing hanger installs through BOP stack Bolt Connector Profile
and riser for safe rig operations
Bit Guide
• Metal-to-metal sealing profile optional in tubing
hanger ID Stab-In Tie-Back Tool
• Diver-friendly make-up adapter ring on tubing
head provides centralization, maximum height
adjustment and rigid support
• Tubing head provides internal lockdown profile
for annulus metal-to-metal sealing and positive
lockdown of tubing hanger
• Field-proven tubing hanger systems available

12
Dril-Thru™ Mudline Completion System

T he Dril-Thru Mudline Completion


System is a unique mudline
suspension system designed to accept
System Features
• Drilling and completion work possible through
subsea tubing hangers and subsea conventional BOP equipment
completion trees without the use
• Wellhead hanger housing can accommodate
of adapters. This system simplifies several casing hangers and a tubing hanger
operations when it is known in advance
that the well will be completed with a • Internal lockdown profile for positive
subsea tree. lockdown of tubing hanger
• Metal-to-metal sealing throughout
Drilling Phase • Diver or diverless tree make-up
• Field-proven performance
Wellhead
Housing Production Phase
Running
Tool

Tubing
Hanger
Running
Tool
Tubing
Hanger

Mudline
Hanger
Wellhead
Housing

20"
Dril-Thru
Mudline
Hanger

Production
Casing
Hanger

13
Dril-Quip: A S ingle-Source Supplier
CRITICAL SERVICE SYSTEM
CS-10™ Casing Support System Critical Service System
Drilling M
DRILLING ode
MODE Tie-Back PRODUCTION
TIE-BACK Production
The CS-10 Casing Support System is used primarily in platform applications
to decreaseCS-10™
load on theCASING SUPPORT
platform by hanging SYSTEM
casing off at the mudline.

Specialty Casing Connectors

Multi-Thread™ Connectors

Dril-Quip fabricates
complete casing joints
for both drilling and
driving applications.
Dril-Quip offers a variety
of connectors that are
Quik-Thread® Connectors ideal for use with mudline
suspension equipment.

Quik-Jay™ Connectors

Quik-Stab® Connectors Dril-Quip offers a high pressure, high temperature mudline


suspension system for use in critical-service applications. These
critical-service systems incorporate all of the field-proven
features of the MS‑15 and include additional metal-to-metal
sealing and centralization.

14
for Mudline-Related Products

D ril-Quip
offers traditional and unitized surface
wellheads for use in with its mudline suspension
product line for jacket and platform applications. The
company’s surface wellhead equipment is offered in a
variety of sizes, configurations and service ratings.
Dril-Quip’s unitized surface wellheads feature metal-
to-metal sealing technology and simplified operational
procedure to reduce installation time.

SC-90™
SC-90™ Conventional
CONVENTIONAL SU-90™UNITIZED
SU-90™ Unitized
Wellhead SSYSTEM
WELLHEAD ystem Wellhead SSYSTEM
WELLHEAD ystem

Dril-Quip’s surface completion trees have been designed to


incorporate metal-to-metal sealing technology and safe, effective
production solutions for onshore and offshore well developments.
The Company’s trees include API-monogrammed gate valve
components that are designed to comply with all applicable API
specifications and Dril-Quip’s ISO 9000, 9001 Quality System. Dril-Quip
utilizes a variety of tests to verify the performance of its trees and
valves to ensure the highest possible standards.

Dril-Quip’s Unitized Wellhead System adapts


to most casing programs, has dual metal-to-
metal seals and is available for standard or
H2S service.
The SU-90 Unitized Wellhead’s compact
design, along with accessories for height
and tension adjustment, make it ideal for
use on platforms and with MS-15 Mudline
Suspension Systems.
Dril-Quip template systems provide the operator with the ability to
arrange production wells in a pattern. This eliminates the possibility
of intersecting wells or well misalignment by forcing direct
centerline-to-centerline well spacing. All Dril-Quip template systems
come with the required alignment and concentricity accessories to
The SC-90 Conventional Wellhead is a facilitate vertical installation of equipment during the drilling phase.
cost-effective wellhead for land, jack-up or Dril-Quip template systems supply alignment features to the jacket
platform drilling and completion applications. installation and also provide trouble-free operations during the tie-
back phase.
15
SH Indicates shoulder type hanger SP Indicates split ring type hanger

30" x 13 3/8" x 9 5/8" x 7 " Casing Program (211/4 " BOP)


INTERNAL TENSION MIN. MAX.
MS-15 Strengths and Dimensions
SIZE
(inches)
TYPE
HANGER
YIELD

(psi)
YIELD
PRESSURE PRESSURE
RETURN
AREA
(x 1,000 lbs) (sq in)
MAX.
OD
(inches)
HANGER WILL
RUN THROUGH
MIN. ID
BIT
SIZE
(inches) (inches)

30 — — 2,900 — — — 20.125 20
30 x 13 /8 3
SH 9,700 2,900 28 21.125 21 /4" BOP
1
12.490 12 1/4
Dril-Q uip manufactures and stocks a wide variety of mudline suspension systems to
13 3/8 x 9 5/8 SP 16,500 2,000 10 12.188 13 3/8" x 72 lb/ft. Csg. 8.803 8 3/4
match most casing programs. The following charts are for typical casing programs.
9 5/8 x 7 (32-38 lb) SP 17,500 900 5 8.375 9 5/8" x 53.5 lb/ft. Csg. 5.905 5 7/8
Contact a Dril-Quip representative to obtain strength-and-dimension charts for specific casing programs.
SH Indicates shoulder type hanger SP Indicates split ring type hanger

30" x 20" x 13 3/8" x 9 5/8" x 7 " Casing Program

INTERNAL TENSION MIN. MAX.


YIELD YIELD RETURN MAX. BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)

30 — — 3,800 — — — 26.250 26
30 x 20 SH 5,000 3,800 48 27.250 30 x 1" Wall Pipe 17.553 17 1/2
20 x 13 3/8 SH 10,000 2,400 13 18.510 20" x 133 lb/ft. Csg. 12.490 12 1/4
13 3/8 x 9 5/8 SP 16,500 2,000 10 12.188 133/8" x 72 lb/ft. Csg. 8.803 8 3/4
9 5/8 x 7 (32-38 lb) SP 17,500 700 5 8.375 9 5/8" x 53.5 lb/ ft. Csg. 5.905 5 7/8
SH Indicates shoulder type hanger SP Indicates split ring type hanger

24"" xx 16
30 16" "xx 10
1033//44"" xx 77 55//88"" (or
Casing Program
7 ") Casing Program
INTERNAL
INTERNAL TENSION
TENSION MIN.
MIN. MAX.
MAX.
YIELD
YIELD YIELD
YIELD RETURN
RETURN MAX.
MAX. BIT
BIT
SIZE
SIZE TYPE
TYPE PRESSURE
PRESSURE PRESSURE
PRESSURE AREA
AREA OD
OD HANGER WILL
HANGER WILL MIN. ID
MIN. ID SIZE
SIZE
(inches)
(inches) HANGER
HANGER (psi)
(psi) (x 1,000
(x 1,000 lbs)
lbs) (sq in)
(sq in) (inches)
(inches) RUN THROUGH
RUN THROUGH (inches)
(inches) (inches)
(inches)
24
30 —
— —
— 3,300
3,800 —
— —
— —
— 22.240
26.470 22
26
24 xx 16
30 16 SH
SH 5,000
5,000 3,300
3,300 24
48 21.125
27.530 x 1"/4"Wall
30" 21
1
BOP Pipe 13.802
14.990 1333//44
14
16 1033//44
16 xx 10 SH
SP 12,000
12,000 1,700
1,700 12
12 14.500
14.500 16" xx 109
16" 109 lb/ft.
lb/ft. Csg.
Csg. 9.928
9.928 997//88
7

1033//44 xx 7755//88
10 SP
SP 15,000
15,000 1,200
1,200 66 9.500
9.500 1033//44"" xx 60.7
10 60.7 lb/ft.
lb/ft. Csg.
Csg. 6.802
6.802 663//44
3

SH Indicates
SH Indicates shoulder
shoulder type
type hanger
hanger SP Indicates
SP Indicates split
split ring
ring type
type hanger
hanger

30" x 13 3/8" x 9 5/8" x 7 " Casing Program (211/4 " BOP)


36" x 24" x 18 5/8" x 133/8" x 9 5/8" x 7 " Casing Program
INTERNAL TENSION MIN. MAX.
INTERNAL
YIELD TENSION
YIELD MIN.
RETURN MAX. MAX.
BIT
SIZE TYPE YIELD
PRESSURE YIELD
PRESSURE RETURN
AREA MAX.
OD HANGER WILL MIN. ID BIT
SIZE
SIZE
(inches) TYPE
HANGER PRESSURE
(psi) PRESSURE
(x AREA
1,000 lbs) (sq in) OD
(inches) HANGER
RUN THROUGH WILL (inches) SIZE
MIN. ID (inches)
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)
30 — — 2,900 — — — 20.125 20
36 — — 5,000 — — — 28.250 28
30 x 13 /8
3
SH 9,700 2,900 28 21.125 21 /4" BOP
1
12.490 12 1/4
36 x 24 SH 5,000 5,000 48 29.250 291/2" BOP 22.240 22
13 /8 x 95 /8
3 5
SP 16,500 2,000 10 12.188 13 /83" x 72 lb/ft. Csg.
3
8.803 8 31/4
24 x 18 /8 SP 7,500 4,500 15 22.000 24 /4" Wall Pipe 17.553 17 /2
9 5/8 x5 7 (32-38 lb) SP 17,500 900 5 8.375 9 55/8" x 53.5 lb/ft. Csg. 5.905 5 7/8
18 /8 x 13 /83
SP 11,000 3,000 12 17.000 18 /8" x 136 lb/ft. Csg. 12.490 12 1/4
SH Indicates shoulder type hanger SP Indicates split ring type hanger
13 3/8 x 9 5/8 SP 16,500 2,000 10 12.188 13 3/8" x 72 lb/ft. Csg. 8.803 8 3/4

16 9 5/8 x 7 (32-38 lb) SP 17,500 710 5 8.375 9 5/8" x 53.5 lb/ ft. Csg. 5.905 5 7/8
30 x 20 x 13 / x 9 / x 7 SP
"
SH Indicates "shoulder3type
"
Casing Program
5 "
" Indicates split ring type hanger
8 hanger
8

INTERNAL TENSION MIN. MAX.


YIELD YIELD RETURN MAX. BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
36" x 26" x 20" xHANGER
(inches) 133/8" x 95/8" (psi)
x 7 " Casing Program
(x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)
36" x 24" x 18 5/8" x 133/8" x 9 5/8" x 7 " Casing Program
INTERNAL TENSION MIN. MAX.
YIELD YIELD RETURN MAX. BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)

36 — — 5,000 — — — 28.250 28
36 x 24 SH 5,000 5,000 48 29.250 29 /2" BOP
1
22.240 22
24 x 18 /85
SP 7,500 4,500 15 22.000 24 /4" Wall Pipe
3
17.553 17 1/2
18 5/8 x 13 3/8 SP 11,000 3,000 12 17.000 18 5/8" x 136 lb/ft. Csg. 12.490 12 1/4
13 3/8 x 9 5/8 SP 16,500 2,000 10 12.188 13 3/8" x 72 lb/ft. Csg. 8.803 8 3/4
9 5/8 x 7 (32-38 lb) SP 17,500 710 5 8.375 9 5/8" x 53.5 lb/ ft. Csg. 5.905 5 7/8
SH Indicates shoulder type hanger SP Indicates split ring type hanger

36" x 26" x 20" x 133/8" x 95/8" x 7 " Casing Program

INTERNAL TENSION MIN. MAX.


YIELD YIELD RETURN MAX. BIT
30" xSIZE
16" x 10 3/4" TYPE
x 7 5/8" (or 7 ") Casing
PRESSURE Program
PRESSURE AREA OD HANGER WILL MIN. ID SIZE
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)
INTERNAL TENSION MIN. MAX.
36 — YIELD— 4,500
YIELD —
RETURN —
MAX. — 28.250 28
BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
36 x 36
(inches) SH
HANGER 3,000
(psi) 3,700
(x 1,000 lbs) 22
(sq in) 29.250
(inches)
1
/2" BOP
RUN29THROUGH 24.125 (inches)
(inches) 24
5,000 3,500 24.000 26" x .812" Wall Pipe
26
30x 20 — SP —28 17.553 26/2
17 1
— 3,800 — — 26.470
10,000 3,000 17.446 20" x 1.00" Wall Pipe
30 13 3/8
20 xx 16 SHSP 5,000 3,300 4813 27.530 30" x 1" Wall Pipe 12.490
14.990 1231//44
14
16,500 2,250 12.188 13 3/8" x 72 lb/ft. Csg.
13x3/108 x39 /8
SP SP 1213 8.803 987/8/4
5 3
16 /4 12,000 1,700 14.500 16" x 109 lb/ft. Csg. 9.928
17,500 910 8.375 9 5/8" x 53.5 lb/ft. Csg.
910 x 7 5/8 lb) SP SP
/8 3x/47(32-38 65 5.905 653//48
5 7
15,000 1,200 9.500 10 3/4" x 60.7 lb/ft. Csg. 6.802
SH Indicates shoulder type hanger SP Indicates split ring type hanger
SH Indicates shoulder type hanger SP Indicates split ring type hanger

36" x 24" x 18 5/8" x 133/8" x 9 5/8" x 7 " Casing Program


INTERNAL TENSION MIN. MAX.
YIELD YIELD RETURN MAX. BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)

36 — — 5,000 — — — 28.250 28
36 x 24 SH 5,000 5,000 48 29.250 29 /2" BOP
1
22.240 22
24 x 18 5/8 SP 7,500 4,500 15 22.000 24 3/4" Wall Pipe 17.553 17 1/2
18 5/8 x 13 3/8 SP 11,000 3,000 12 17.000 18 5/8" x 136 lb/ft. Csg. 12.490 12 1/4
13 3/8 x 9 5/8 SP 16,500 2,000 10 12.188 13 3/8" x 72 lb/ft. Csg. 8.803 8 3/4
9 5/8 x 7 (32-38 lb) SP 17,500 710 5 8.375 9 5/8" x 53.5 lb/ ft. Csg. 5.905 5 7/8
SH Indicates shoulder type hanger SP Indicates split ring type hanger

36" x 26" x 20" x 133/8" x 95/8" x 7 " Casing Program

INTERNAL TENSION MIN. MAX.


YIELD YIELD RETURN MAX. BIT
SIZE TYPE PRESSURE PRESSURE AREA OD HANGER WILL MIN. ID SIZE
(inches) HANGER (psi) (x 1,000 lbs) (sq in) (inches) RUN THROUGH (inches) (inches)

36 — — 4,500 — — — 28.250 28
36 x 36 SH 3,000 3,700 22 29.250 29 1/2" BOP 24.125 24 17
26 x 20 SP 5,000 3,500 28 24.000 26" x .812" Wall Pipe 17.553 17 /2
1

20 x 13 3/8 SP 10,000 3,000 13 17.446 20" x 1.00" Wall Pipe 12.490 121/4
13 3/8 x 9 5/8 SP 16,500 2,250 13 12.188 13 3/8" x 72 lb/ft. Csg. 8.803 8 3/4
9 5/8 x 7(32-38 lb) SP 17,500 910 5 8.375 9 5/8" x 53.5 lb/ft. Csg. 5.905 5 7/8
DRIL-QUIP WESTERN HEMISPHERE DRIL-QUIP EASTERN HEMISPHERE DRIL-QUIP ASIA PACIFIC
DRIL-QUIP, INC. World Headquarters DRIL-QUIP (Europe), Ltd. DRIL-QUIP Asia Pacific Pte. Ltd.
13550 Hempstead Hwy. Stoneywood Park, Dyce No. 9, Tuas Avenue 12
Houston, Texas 77040 Aberdeen, Scotland, UK AB21 7DZ Singapore, 639031
Tel (713) 939 7711 Tel (44) 1224 727000 Tel (65) 6861 0600
Fax (713) 939 8063 Fax (44) 1224 727070 Fax (65) 6861 5700
DRIL-QUIP do Brasil, LTDA. DRIL-QUIP London DRIL-QUIP China
Macaé, Brazil High Wycombe, Shekou, P. R. China
Bucks, England Tel (86) 75 5268 97137
Tel (55) 22 2791 8950 Tel (44) 1494 601086 Fax (86) 75 5268 97134
Fax (55) 22 2791 8989 Fax (44) 1494 601094
DRIL-QUIP Oilfield Services
DRIL-QUIP New Orleans DRIL-QUIP Norway DRIL-QUIP Egypt (Tianjin) Co., Ltd.
New Orleans, Louisiana Stavanger, Norway Zahraa El-Maadi, Cairo, Egypt Tanggu, Tianjin, P. R. China
Tel (504) 522 5566 Tel (47) 51 443700 Tel (20) 22 753 8809 Tel (86) 22 2580 7466
Fax (504) 522 4426 Fax (47) 51 443701 Fax (20) 22 753 8907 Fax (86) 22 2580 7130
DRIL-QUIP The Netherlands Alexandria, Egypt DRIL-QUIP Malaysia
Beverwijk, The Netherlands Tel (20) 3 450 0507 Kuala Lumpur, Malaysia
Tel (31) 251 22 9250 Fax (20) 3 450 0508 Tel (60) 3 2168 4308
Fax (31) 251 22 0044 Fax (60) 3 2168 4201
DRIL-QUIP Nigeria, Ltd.
DRIL-QUIP Denmark Port Harcourt, Nigeria D.Q. Holdings Pty., Ltd.
Esbjerg, Denmark Tel (234) 84 463866 Perth, Australia
Tel (45) 7518 0944 Fax (234) 84 463649 Tel (61) 8 9322 8600
Fax (45) 7518 0640 Fax (61) 8 9322 8500
DRIL-QUIP (Ghana) Ltd.
Takoradi, Ghana DRIL-QUIP Darwin
Tel: (233) 312 5384 Berrimah, Australia
Tel (61) 420 340 528
Fax (61) 8 8932 8084
DRIL-QUIP Indonesia
Jakarta, Indonesia
Tel (62) 21 720 0612
Fax (62) 21 720 1513

032211T ©2011 Dril-Quip, inc. Printed in the USA