a) 8112
b) 269
c) 455
d) 8041
5) Which of the following is the correct mix proportion for the M15 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8
a) Bleeding
b) Segregation
c) Harshness
d) Workability
7) What is concrete?
a) A mixture of homogenous materials
b) A mixture of material and hydrogen
c) A mixture of cement and hydrogen sulphide
d) A mixture of cement, water, and aggregates
12) What is the maximum height through which concrete can be poured?
a) 0.1-0.6 m
b) 1.5 m
c) 0.5 m
d) 2 m
15) For wall, columns & vertical faces of all structural members the formwork is generally
removed after?
a) 16-24 hrs
b) 3days
c) 7days
d) 14 days