You are on page 1of 13

1) What is IS code for 53 Grade

ordinary Portland cement?


a) 8112
b) 269
c) 455
d) 8041

2) What should be the average


thickness of gypsum plaster?
a) 5mm
b) 12mm
c) 18mm
d) 25mm

3) What should be the shelf life of


Cement?
a) 8 week old
b) 12 week old
c) 3 week old
d) None of above

4) Before plastering, the surface has


to be:
a) Rough
b) Smooth
c) Cemented
d) Watered
5) Which of the following is the
correct mix proportion for the M15
a) grade
1: 3: of
6 concrete?
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8

6) The separation of water from the


freshly mixed concrete is known as
a) Bleeding
b) Segregation
c) Harshness
d) Workability

7) What is concrete?
a) A mixture of homogenous materials
b) A mixture of material and hydrogen
c) A mixture of cement and hydrogen sulphide
d) A mixture of cement, water, and aggregates

8) After finishing concrete surface


must be kept _________
a) Dry
b) First dry it and then wet it
c) First wet it and then dry it
d) Wet

9) Cement paints require a smooth


surface to be applied on.
a) True
b) False

10) Dampness spreads upwards from


the ground only.
a) True
b) False

11) Excess vibration during


compacting can lead to:
a) Bleeding
b) Segregation
c) High strength
d) Air bubbles
12) What is the maximum height
through which concrete can be
a) 0.1-0.6 m poured?
b) 1.5 m
c) 0.5 m
d) 2 m

13) Compacting is done to:


a) Place concrete on flat surface
b) Remove air bubbles
c) Place concrete on sloping surface
d) Introduce air bubbles

14) Before floor tiling work which


activities to be done
a)Cement slurry to be spread on slab.
b) Damp proof coting to be applied
c) level checking for Bedding mortar
d) All of above
15) For wall, columns & vertical faces
of all structural members the
formwork
a) is16-24
generally
hrs removed after?
b) 3days
c) 7days
d) 14 days
Name: Employee ID:

Department:

What should be the average For wall, columns & vertical faces of
thickness of gypsum plaster? all structural members the formwork
is generally removed after?
a) 5mm a) 16-24 hrs
b) 12mm b) 3days
c) 18mm c) 7days
d) 25mm d) 14 days

Which of the following is the correct mix The separation of water from the
proportion for the M15 grade of concrete? freshly mixed concrete is known as
a) 1: 3: 6 a) Bleeding
b) 1: 5: 3 b) Segregation
c) 1: 2: 4 c) Harshness
d) 1: 4: 8 d) Workability

After finishing concrete surface What is IS code for 53 Grade


must be kept _________ ordinary Portland cement?
a) Dry a) 8112
b) First dry it and then wet it b) 269
c) First wet it and then dry it c) 455
d) Wet d) 8041

Dampness spreads upwards from the What should be the shelf life of
ground only. Cement?
a) True a) 8 week old
b) False b) 12 week old
c) 3 week old
What is the maximum height through
d) None of above
which concrete can be poured?
a) 0.1-0.6 m
b) 1.5 m
c) 0.5 m
d) 2 m

Before plastering, the surface has to be:


a) Rough
b) Smooth
c) Cemented
d) Watered
Name: Employee ID:

Department:

What is IS code for 53 Grade ordinary The separation of water from the freshly
Portland cement? mixed concrete is known as
a) 8112 a) Bleeding
b) 269 b) Segregation
c) 455 c) Harshness
d) 8041 d) Workability

What should be the average


What is concrete?
thickness of gypsum plaster?
a) 5mm a) A mixture of homogenous materials

b) 12mm b) A mixture of material and hydrogen

c) 18mm c) A mixture of cement and hydrogen sulphide

d) 25mm d) A mixture of cement, water, and aggregates

What should be the shelf life of After finishing concrete surface must
Cement? be kept _________
a) 8 week old a) Dry
b) 12 week old b) First dry it and then wet it
c) 3 week old c) First wet it and then dry it
d) None of above d) Wet

Dampness spreads upwards from the Excess vibration during compacting


ground only. can lead to:
a) True a) Bleeding
b) False b) Segregation
c) High strength
Before plastering, the surface has to be: d) Air bubbles
a) Rough
b) Smooth
c) Cemented
d) Watered

Which of the following is the correct mix


proportion for the M15 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8
Name: Employee ID:

Department:

What is the maximum height through The separation of water from the freshly
which concrete can be poured? mixed concrete is known as
a) 0.1-0.6 m a) Bleeding
b) 1.5 m b) Segregation
c) 0.5 m c) Harshness
d) 2 m d) Workability

Compacting is done to: What is concrete?


a) Place concrete on flat surface a) A mixture of homogenous materials

b) Remove air bubbles b) A mixture of material and hydrogen

c) Place concrete on sloping surface c) A mixture of cement and hydrogen sulphide

d) Introduce air bubbles d) A mixture of cement, water, and aggregates

Before floor tiling work which activities After finishing concrete surface must
to be done be kept _________
a)Cement slurry to be spread on slab. a) Dry
b) Damp proof coting to be applied b) First dry it and then wet it
c) level checking for Bedding mortar c) First wet it and then dry it
d) All of above d) Wet

Dampness spreads upwards from the Excess vibration during compacting


ground only. can lead to:
a) True a) Bleeding
b) False b) Segregation
c) High strength
For wall, columns & vertical faces of all structural d) Air bubbles
members the formwork is generally removed after?
a) 16-24 hrs
b) 3days
c) 7days
d) 14 days

Which of the following is the correct mix


proportion for the M15 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8
Name: Employee ID:

Department:

What is IS code for 53 Grade ordinary Excess vibration during compacting


Portland cement? can lead to:
a) 8112 a) Bleeding
b) 269 b) Segregation
c) 455 c) High strength
d) 8041 d) Air bubbles

What should be the average thickness


What is concrete?
of gypsum plaster?
a) 5mm a) A mixture of homogenous materials

b) 12mm b) A mixture of material and hydrogen

c) 18mm c) A mixture of cement and hydrogen sulphide

d) 25mm d) A mixture of cement, water, and aggregates

Before plastering, the surface has to What is the maximum height through
be: which concrete can be poured?
a) Rough a) 0.1-0.6 m
b) Smooth b) 1.5 m
c) Cemented c) 0.5 m
d) Watered d) 2 m

Cement paints require a smooth Before floor tiling work which


surface to be applied on. activities to be done
a) True a)Cement slurry to be spread on slab.
b) False b) Damp proof coting to be applied
c) level checking for Bedding mortar
Which of the following is the correct mix d) All of above
proportion for the M10 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8

Which of the following is the correct mix


proportion for the M15 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8
Name: Employee ID:

Department:

What is IS code for 53 Grade ordinary Excess vibration during compacting


Portland cement? can lead to:
a) 8112 a) Bleeding
b) 269 b) Segregation
c) 455 c) High strength
d) 8041 d) Air bubbles

What should be the average thickness


What is concrete?
of gypsum plaster?
a) 5mm a) A mixture of homogenous materials

b) 12mm b) A mixture of material and hydrogen

c) 18mm c) A mixture of cement and hydrogen sulphide

d) 25mm d) A mixture of cement, water, and aggregates

Before plastering, the surface has to What is the maximum height through
be: which concrete can be poured?
a) Rough a) 0.1-0.6 m
b) Smooth b) 1.5 m
c) Cemented c) 0.5 m
d) Watered d) 2 m

Cement paints require a smooth Before floor tiling work which


surface to be applied on. activities to be done
a) True a)Cement slurry to be spread on slab.
b) False b) Damp proof coting to be applied
c) level checking for Bedding mortar
Which of the following is the correct mix d) All of above
proportion for the M10 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8

Which of the following is the correct mix


proportion for the M15 grade of concrete?
a) 1: 3: 6
b) 1: 5: 3
c) 1: 2: 4
d) 1: 4: 8

You might also like