3. For pipe culverts and storm drains, the minimum test is 1 – Pipe for every 50 pipes. What is the alternative requirement?
a) 1 – set consisting of 3 concrete cylinder samples for not more than 25 pipes cast in the field and 1 – inspection report
for each size for not more than 25 pipes cast in the field.
b) Inspection report is enough
c) Mill Certificate
5. The minimum test requirement for water used in concrete for a questionable source is ______.
a) P.E. Certificate b) 1 – Quality Test c) Inspection Report
6. Based on the maximum dry density obtained by laboratory test, the degree of compaction required for aggregate sub base
should be at least _______________________.
a) 95% c) 100%
b) 98% d) none of the above
7. Per our present Specification for Highways and Bridges including amendments, it is mandatory to open PCCP to traffic
not later than ___________.
a) 7 days after pouring b) 21 days after pouring
c) 14 days after pouring d) 28 days after pouring
9. For efficient compaction, the embankment materials should at the time of rolling be ______.
a) Dry c) at optimum moisture content
b) Wet d) at maximum moisture content
10. For a road base course the most preferable material is one with CBR of ____________.
a) 60 c) 50
b) 30 d) 80
14. If concrete is continuously moist cured, it will gain strength beyond 180 days.
a) True c) it depends on curing temperature
b) False
16. Generally speaking, batching of concrete aggregates by volume is preferable than weight.
a) True c) False
b) They are the same
17. If angular coarse aggregate is used in a concrete mix, it will require more ________________
a) Water c) water and fine aggregates
b) Fine aggregates d) neither a and b
1
20. When concrete must be placed in a sloping surface, placing should start at the __________.
a) Bottom c) can be top or bottom
b) Top
21. The maximum percent abrasion loss allowed for concrete coarse aggregate is __________.
a) 30% c) 45%
b) 40% d) 50%
22. The plasticity index of aggregate base course should be not greater than ___________.
a) 6 c) 10
b) 8 d) 12
25. Which of the following dead load is equivalent for loose sand, earth and gravel fill?
a) 2,403 tons/cu. m. c) 1,603 tons/cu. m.
b) 1,922 tons/cu. m. d) 2,150 tons/cu. m.
27. During coring of completed pavement, how many cores /km/lane is required as per specification?
a) 4 c) 6
b) 5 d) 7
29. The opening of No. 4 sieve is bigger than the opening of a ¼ sieve.
a) True b) false c) they are the same
30. The standard compaction test on predominantly fine grained soils is performed on soil fraction passing sieve no.
___________.
a) 200 c) 16
b) 40 d) 4
31. Which plasticity index would you prefer for the base course of PCCP?
a) Less than 6 c) 10 to 12
b) 6 to 9 d) more than 12
32. A soil which is classified A-7 by the highway research board method will have a subgrade rating of __________.
a) excellent c) fair
b) Good d) poor
38. Which of the following are most suitable for construction of highway embankments?
a) Granular c) plastic
b) fine- grained d) clayey
40. The best soil for a road subgrade would behave a group index of ___________
a) Less than 3 c) 11 to 15
2
b) 5 to 10 d) 16 to 20
41. The highest moisture content in the plastic state of fine grained soil is the ___________.
a) Liquid limit b) plastic limit
a) 40 ton c) 50 tons
b) 130 tons d) 150 tons
47. All asphalt are _______, they became harder as temperature decreases and softer as their temperature increases.
a) thermoplastic c) brittle
b) Hydrophobic d) none of the above
48. The viscosity of the asphalt during mixing and lay down is ____________.
a) Viscosity at 135°C c) viscosity at 60 °C
b) Viscosity at 125°C d) viscosity at 163°C
49. The trial section for compaction for each type of fill materials and type of equipment to be used in the work should have
an area of__________.
a) 500 sq. m. c) 600 sq. m.
b) 335 sq. m. d) 400 sq. m.
56. As Materials Engineer, what would you recommend in order to check the suitability and efficiency of the equipment to
use prior to sub base construction for item 310, Bituminous Concrete Surface Course?
a) make a trial section c) make trial mix
b) Establish control strips d) none of the above
57. Quality of factor – produced reinforced concrete pipes may be best established through what?
a) Compressive strength test
b) Flexural strength test
c) Core test
d) Crushing strength test
58. Result of Immersion – Compression test conducted on a bituminous mix sample are as follow: Dry stability + 2,000 Kpa,
Wet stability = 1,000 Kpa, What is the resulting Index of Retained Strength?
a) 60% c) 50%
3
b) 55% d) 70%
59. In DPWH Contract Projects, Quality Control is the sole responsibility of ___________.
a) The DPWH project personnel
b) The government’s Materials Engineer
c) The Contractor
60. As Materials Engineer, when is the right time to start sampling and testing of materials to be incorporated into the work?
a) Before final payment b) before start of work items c) before first partial payment
62. Under what climate conditions do we use higher penetration grade asphalt cement?
a) Hot climate c) cold climate
b) Rainy weather d) none of the above
63. What is the basis for rejection or acceptance of any construction materials?
a) Certificate of billing c) Statement of work accomplished
b) Materials Test Report d) none of the abc
64. Initial rolling of bituminous mixes shall be performed with a ______ roller.
a) Vibrator c) sheep foot
b) Pneumatic d) none of the above
65. In a bituminous mix sample, what is the % of asphalt by a) weight of aggregate and by b) weight of mix? Given the
following data: Weight of dry aggregates (after extraction) = 950 grams: Weight of Mix = 1010.
A. a) 6.32% b)5.50% c) 6.0% d) none of the above
B. a) 5.50% b) 6.32% c) 6.0% d) 5.94%
67. Problems regarding quality of construction materials shall be reported directly by the Contractor’s Materials Engineer to
the ____________.
a) DPWH Materials Engineer c) Contractor’s Project Engineer
b) Contractor d) none of the above
68. If the RC pipes in the forgoing problem is not cast in the field, how many pipes will be required to be subjected to the
Crushing Strength test?
a) 75 pcs. b) 70 pcs. c) 100 pcs
69. How many concrete cylinder samples are required for 3,500 pcs. Of reinforced concrete pipes?
a) 14 sets of 3 c) 75 sets of 3
b) 140 sets of 3 d) none of the above
70. What is the bitumen obtained from the distillation coal or wood?
a) rock asphalt c) emulsion
b) Tar d) none of the above
71. How do you reduce the viscosity of Medium – Curing Cutback Asphalt? By mixing it with _______.
a) gasoline c) kerosene
b) Diesel d) emulsion
72. What establish the exact percent of aggregates and asphalt content in a bituminous mix _______.
a) design mix c) job mix formula
b) Job order d) extraction formula
74. In asphalt pavement construction, how is the surface level of the completed pavement check?
a) By T – core test b) by density test c) by the use of 3 meter straight edge
77. What control during the mixing and compaction of the bituminous pavement is of great significance in the resulting
pavement?
a) Compaction c) grading of aggregates
b) Density d) temperature
4
78. In asphalt pavement construction, there are three phases of rolling; what kind of roller is required to be used for the final
compaction and smoothing?
a) Pneumatic roller b) sheep foot roller c) tandem- smooth wheeled roller
79. What is the maximum speed of the roller in compaction of asphalt pavement?
a) 4 kph c) 8 kph
b) 5 kph d) 6 kph
82. The apparatus used in determining the consistency of asphalt cement is ___________.
a) Penetrometer b) viscometer c) thermometer
84. The Optimum Asphalt Content obtained in Marshall Stability Test is the average asphalt content of the Maximum
Stability, Maximum Bulk Specific Gravity, and _________________.
a) 4% Air Voids b) 2 mm flow c) 5% mineral content
85. What test determines the safe working temperature of the asphalt?
a) Ductility test b) Flash Point Test c) Stability Test
87. Steel bars for the concrete reinforcement are tested for their __________ properties.
a) Tensile and bending b) compressive c) crushing
89. How many units shall be tested for strength, moisture and absorption in a lot of 120,000 CHB
Ans. 18 units
90. For 250 gallons of Reflectorized Traffic Paint, how many samples are required to be submitted for Quality Testing?
a) 3 samples b) 2 samples c) 4 samples
91. The bituminous mix should have a mass % of air voids within the range of __________.
a) 2 to 3% b) 1 to 4% c) 3 to 5%
92. Traffic paint shall be applied to the pavement at the rate of 0.33 li/sq. m. and shall dry sufficiently to be free it from
cracking from ___________.
Ans. 150to 30 mins.
93. This is the only class of riprap that may consist of round natural stones.
Ans. Class A Riprap
94. The surface of riprap shall not vary from the theoretical surface by more than _________ mm. at any point.
Ans. 100 mm.
95. Fine aggregates of masonry shall all passes the ________ mm. sieve.
Ans. 2.36 mm (No. 8 sieve)
96. Mortar that is not used within ______ minutes after the water has been added shall be discarded.
Ans. 90 minutes
97. Maximum projection of rock faces beyond the pitch lines shall not be more than _____.
Ans. 50 mm.
98. In hot or dry weather, the masonry shall be satisfactory protected from the sun and shall be kept wet for a period at least
_________ after completion.
Ans. Three (3) days
99. For pavement markings, the composition of white paint shall be _______ pigment and ______% of vehicle
Ans. 42 – 45 % pigment ; 53 – 55% vehicle
100. The composition of yellow paint shall be _______ pigment and ______ vehicle.
Ans. 23% pigment and 77% vehicle