REV AB
INSTALLATION INSTRUCTIONS
Site Preparation
System Location
Floor drain(s) are recommended to be incorporated into the design of the system
area. The finished floor MUST be flat/level, smooth, consistent at all edges, and
the floor should slope away from walls towards the floor drain(s).
The heater and all pumps are pre-wired to the electrical control panel affixed to the
Plant Pack. The standard conduit lengths provided for the treadmill motor and HMI
connections are 25’, so consideration should be given to the placement of the Plant
Pack in relation to the Trainer Tank to stay within these constraints.
REV AB
INSTALLATION INSTRUCTIONS
– 350 Treadmill
o 35” W X 90” L X 73” H //
o 1,650 LBS Dry // 6,863 LBS Wet
– Plant Pack
o 34.5” W X 66.5” L X 94” H (76” with riser pipes removed)
o 765 LBS Dry // 974 LBS Wet
Storage Tanks Options
– (2) 500 Gallons Tank, (1000 Gallons Total)
o 31” W X 68” L X 69” H
o 400 LBS Dry // 8,740 LBS Wet
- (1) 1000 Gallon Tank
o 40” W X 93” L X 87” H
Utilities
Water Supply: The owner shall provide a water supply line or ¾” diameter hose
bib to fill the Water Storage Tank.
Electrical Service: The owner shall provide an electrical service designed for the
HydroWorx control panel requirement which is:
Sanitary: The owner shall provide a sump pit with pump or floor drain(s) to
accommodate 1,000 gallons via gravity through a 2” PVC pipe or ¾” diameter
hose. The HydroWorx maintenance pump CANNOT be used to drain the pool or it
will void the components warranty.
REV AB
INSTALLATION INSTRUCTIONS
Construct the system space per the owner’s design documents (if any) and in
accordance with this HydroWorx Design & Installation Guide.
A Structural Engineer will need to be consulted to ensure the floor can support the
weight of the equipment when filled and in use.
The 350 Treadmill is a 35” wide by 90” long by 73” high. The Plant Pack is 34.5” wide
by 66.5” long by 76” high with riser pipes removed. A minimum 36” wide by 84” high
path from the anticipated off-loading point into the system space must be in place
at time of delivery. The unit must remain upright at all times during delivery to avoid
damaging the integrated treadmill and the 350 Treadmill. The unit cannot be
turned on its side.
Following placement, level the 350 Treadmill and Plant Pack using the adjustable
feet.
Upon completion of the electrical and plumbing requirements, clean the 350
Treadmill using glass cleaner and a non-abrasive cloth. Fill the Water Storage Tank
and complete the site analysis checklist procedures necessary to place the
system into service. This form must be completed and returned to HydroWorx
before the customer in-service training can be scheduled.
Provide all labor, materials, and equipment to connect the required 208-240 Volt /
60Hz / 100 Amp / 1-phase / 4-wire (L1, L2, Ground, Neutral) service to the
HydroWorx control panel following the provided electrical installation diagram
placed in the electrical control panel.
Install the provided interconnecting cables from the HydroWorx control panel and
terminate the feed to each of the following system components after checking the
voltage of the 100 amp service feed:
REV AB
INSTALLATION INSTRUCTIONS
1 - Low voltage control cable from HydroWorx control panel to the 350
Treadmill low voltage junction box.
2 - Treadmill power cable from the HydroWorx control panel to the
treadmill motor junction box.
3 - #6 ground wire from the HydroWorx panel to the marked ground
lug on the 350 Treadmill.
4 - HMI touch screen and cable through routing holes and into low
voltage junction box.
Gauge of the ground wire of any appliance must be as large as the hot wire(s)
so it is capable of efficiently conducting electricity away from the device in
the event of a short circuit or stray current, as well as prevent GFCI nuisance
tripping.
This is the form that comes with every ISTECH electrical panel that must be
completed and faxed or mailed to ISTECH to activate warranty on the electrical
panel and confirm the unit is installed per the original manufacturer’s guidelines.
This is the main power panel that controls functions on the HydroWorx system on
the HydroWorx 350 system
REV AB
INSTALLATION INSTRUCTIONS
Provide means to drain the storage tank using a rated sump pump with a ¾”
diameter hose or PVC piping via gravity to a sump pit or floor drain(s) to
accommodate 1,000 gallons of water.
All piping, fittings, valves, except for the 2 check valves that are supplied by
HydroWorx, shall be provided and installed by the plumbing contractor. Unless
otherwise noted, all conveyance piping, fittings, valves, etc. shall be schedule 40
PVC (pressure type) or schedule 40 flex pipe fastened with primer and heavy-
bodied pipe glue. Threaded fittings shall be connected using silicon sealant (do not
use Teflon tape or plumbing pip-thread sealer).
After the electrician and plumber have completed all connections, fill the pool
to hydrostatically test plumbing installed. If the pool is left up and running, add
shock and other chemicals to balance and maintain the water chemistry.
Following completion of the start-up and testing work identified on the HydroWorx
Site Analysis Checklist and verified by HydroWorx, a HydroWorx representative
will schedule a site visit with the owner to perform training and place the pool into
service.
REV AB
HydroWorx
Model 350 Warranty Activation
THIS SHEET MUST BE COMPLETED AND SIGNED BY QUALIFIED, LICENCED
ELECTRICIAN AND FAXED OR MAILED TO ISTECH TO ACTIVATE WARRANTY ON THIS
SYSTEM.
Step 1
Step 2
Have you provided HydroWorx the pool room design for review and
comment?
Step 3
1. Site and location requirements are not adhered to creating access issues
for delivery, installation, future service, or component failure due to
incorrect design.
2. Scope of work is not clearly defined resulting in change orders that impact
the owner.
MIN.
MINIMUM
2"
CIRCULATION
DRAINS (BY OTHERS) REQUIRED TO DRAIN BOTH THE STORAGE SUCTION
TANK(S) AND THE TRAINER TANK IN CASE OF EMERGENCY 3" TRANSFER
SUCTION
SUGGESTED 12"
1' - 3"
FLOORSINK
(BY OTHERS)
MINIMUM
350 PLANT
11' - 0"
1' - 6" PACK
HOSE BIB
3' - 0" (BY OTHERS)
ELECTRICAL
DROP
(BY OTHERS)
MECHANICAL ROOM
FRONT OF TRAINER PLUMBING DETAIL 5
3
MINIMUM
1/2" = 1'-0" 6' - 0"
19' - 8"
SHOWN COMPONENTS
6' - 0"
MINIMUM
(PROVIDED BY HYDROWORX)
-(2) SIDE CLINICIAN PLATFORMS
8' - 2"
3" TRAINER
-ACCESS RAMP EMPTY
-PEDIATRIC HANDRAIL SET 3" TRAINER 350 TRAINER TANK
-SECONDARY POOL WATER FILL WITH REAR PLATFORM
SANITATION SYSTEM
SUGGESTED
1' - 6"
1' - 6"
MIN.
WEIGHTS: 12" FLOORSINK
(BY OTHERS) MIN.
350 Treadmill – 35” W X 90” L X 73” H // 1,650
LBS Dry // 6,863 LBS Wet
TRAINER ROOM 350 SINGLE TANK MINIMUM LAYOUT
35"W
Plant X 67"
Pack – L35"W
X 94”XH67" L X 94” H 4 1
3/8" = 1'-0"
”
(76” with riser pipes removed”)”
A101 - SINGLE TANK LAYOUT
765lbs Dry // 973lbs Wet
Storage Tank – (1) 1000 Gallons Total // Drawn By: Author
40” W X 92” L X 89" H // 450 LBS Dry //
8,796 LBS Wet
350 MINIMUM LAYOUT EXAMPLE Checked By:
Revision Number:
Checker
MIN.
2"
SUCTION
3" TRANSFER
Standard: 208-240 Volt, 60 Hz , 100 amp, Single Phase Power SUCTION
SUGGESTED 12"
DRAINS (BY OTHERS) REQUIRED TO DRAIN BOTH THE STORAGE FLOORSINK
MIN.
TANK(S) AND THE TRAINER TANK IN CASE OF EMERGENCY
4"
(BY OTHERS)
MINIMUM
CIRCULATION
12' - 1"
RETURN
350 PLANT (2) 500 GALLON WATER
PACK STORAGE TANKS
20' - 8"
Level 1
1' - 0" 0' - 0"
STACKED PIPE PASSTHROUGH
3
3/4" = 1'-0"
SHOWN COMPONENTS 3
MECH ROOM
4 A102
-350 UNIT W/REAR PLATFORM 3" JET
RECOMMENDED
RETURN
-(2)500 GALLON WATER TANK CHECK VALVES ON DOUBLE DOORS
3" JET (BY OTHERS)
-MECHANICAL SKID (PLANT PACK) SUCTION
2 3" JET SUCTION AND
TRAINER EMPTY LINES
A102
MINIMUM
(PROVIDED BY HYDROWORX)
8' - 2"
3" TRAINER
ADDITIONAL OPTIONS NOT SHOWN EMPTY
3" TRAINER 350 TRAINER TANK 1' - 6"
WITH REAR PLATFORM
-(2) SIDE CLINICIAN PLATFORMS FILL
-ACCESS RAMP
-PEDIATRIC HANDRAIL SET
-SECONDARY POOL WATER SUGGESTED
1' - 6"
SANITATION SYSTEM 12" FLOORSINK
(BY OTHERS)
EQUIPMENT DIMENSIONS/WEIGHTS:
(FOR ACCESS PATH) 350 DUAL TANK MINIMUM LAYOUT LAYOUT NOT APPROVED
1 UNTIL ACCESS ROUTE/
3/8" = 1'-0"
350 Treadmill – 35” W X 90” L X 73” H // 1,650 MEASUREMENTS ARE
LBS Dry // 6,863 LBS Wet FINALIZED/VERIFIED
TRAINER TANK ROOM
5
35"W
Plant – L35"W
X 67"
Pack X 94”XH67" L X 94” H
A102 - DUAL TANK LAYOUT
(76” with riser pipes removed”) ”
”
Drawn By: Author
765lbs Dry // 973lbs Wet
Storage Tanks – (2) 500 Gallons, 1000 Gallons
350 MINIMUM LAYOUT EXAMPLE Checked By: Checker
Total // 31” W X 68” L X 64” H // 400 LBS Dry // Revision Number:
8,740 LBS Wet 7/28/2022 4:15:45 PM
Date:
MAXIMUM
2 1/2"
REMOVABLE
FLOOR/DECKING
Level 1
1' - 0"
REQ.
0' - 0"
4"
Section 1
4 12"x12"x4"
3D View 2
3/8" = 1'-0" CONC. PAVER 2
(BY OTHERS)
21' - 7"
MINIMUM 14 - 0"
MINIMUM
RECOMMENDED (3'-0" MIN.)
2' - 0"
MIN.
HYDROWORX 350
MIN. TRAINER UNIT
-1' - 0"
2' - 0"
MIN.
3' - 0"
MIN.
REMOVABLE
FLOOR/DECKING
Level 1
1
1/4" = 1'-0"
3D View 3
3
A101 - 350 Recess Guide
Revision Number:
Date: 9/30/2021 3:13:16 PM
93 3/8"
93 3/8"
9 3/8"
9 3/8"
Ø 3 3/16" 38" Ø 3 3/16"
38"
66 19/32" 66 19/32"
93 3/8"
Ø 3 3/16"
Ø 3 3/16"
31 3/16" 31 3/16"
34 27/32" 34 27/32"
32 1/8"
Ø 3 7/8"
34 3/4" 14 3/8" 23 5/8" 23 5/8"
36" 97 1/4"
35"
35"
39"
24"
62" 92 7/8"
(2) 500 GALLON WATER TANKS FRONT (2) 500 GALLON WATER TANKS SIDE
ELEVATION ELEVATION
2 3
3/8" = 1'-0" 3/8" = 1'-0"