Manufacturer and Supplier Roles and Responsibilities Checklist

Chapter 1

Project: ____________________________________________ Address: _________________________________


Owner: ____________________________________________ Email/Phone: ______________________________
Owner’s Project Manager: _____________________________ Email/Phone: ______________________________
Date Initiated: ______________________ Date Revised: ______________________
Required?
Step Activity Document Completed Notes
Y/N
Chapter 2

1. Include the costs and time schedules in the


installation to accomplish the Commissioning
Process
2. With subcontractor, assist the CxP in the Checklists
development of verification, functional, and
performance testing checklists
3. Work with Commissioning Team in scheduling
and performing verification and testing operations
4. Usually through the subcontractor, supply
general contractor and CxP with equipment and
system submittals and documentation
Chapter 4

5. For complex systems, provide the training for the Training plan
commissioned equipment for building operators
and maintainers
Additional tasks may be required
The approval section that follows can be used if applicable to the planning process.
Chapter 5

I have reviewed the required items and plans and verified that they meet the OPR:
Name: ______________________________________________________________________________________
Company Name: ______________________________________________________________________________
Signature: _____________________________________________ Date:_________________________________