Professional Documents
Culture Documents
Publication from
www.labcompliance.com
Global on-line resource for validation and compliance
Copyright by Labcompliance. This document may only be saved and viewed or printed
for personal use. Users may not transmit or duplicate this document in whole or in part,
in any medium. Additional copies and licenses for department, site or corporate use can
be ordered from www.labcompliance.com/solutions.
While every effort has been made to ensure the accuracy of information contained in
this document, Labcompliance accepts no responsibility for errors or omissions. No
liability can be accepted in any way.
Labcompliance offers books, master plans, complete Quality Packages with validation
procedures, scripts and examples, SOPs, publications, training and presentation
material, user club membership with more than 500 downloads and audio/web
seminars. For more information and ordering, visit www.labcompliance.com/solutions.
STANDARD OPERATING PROCEDURE Page 2 of 7
Document Number: S-522 Version 1.xx
Subcontracting of Testing and Calibration
Company Name:
Controls:
Signatures:
Author I indicate that I have authored or updated this SOP according to
applicable business requirements and our company procedure:
Preparing and Updating Standard Operating Procedures.
Name: ________________________________
Signature: ________________________________
Date: ________________________________
Approver I indicate that I have reviewed this SOP, and find it meets all
applicable business requirements and that it reflects the
procedure described. I approve it for use.
Name: ________________________________
Signature: ________________________________
Date: ________________________________
Reviewer I indicate that I have reviewed this SOP and find that it meets all
applicable quality requirements and company standards. I
approve it for use.
Name: ________________________________
Signature: ________________________________
Date: ________________________________
1. PURPOSE
2. SCOPE
3. GLOSSARY/DEFINITIONS
Item Explanation
Work Testing and/or calibration.
4. REFERENCE DOCUMENTS
N/A
5. RESPONSIBILITIES
5.1.2. Defines the test and calibration requirements and acceptance criteria.
5.4.2. Randomly review work done by the subcontractor for technical quality.
6. FREQUENCY OF USE
7. PROCEDURE
7.1.1. The laboratory gets a request from the client to perform a specific work,
e.g., specific type and number of tests.
7.1.2. The laboratory supervisor responsible decides that the work cannot be
performed because of limited resources, either technical or personnel.
7.1.4. The project leader describes the work to be subcontracted such that a
decision can be made to go ahead and subcontract or reject the work.
Technical requirements.
7.1.6. The project leader informs the client about the proposal to subcontract
the work.
7.2.1. The project leader makes a proposal for the selection of the
subcontractor, preferably from a list of authorized subcontractors.
7.2.2. If there is no authorized subcontractor for the work the proposal is based
on the reputation of the subcontractor, anticipated technical competence
and accreditation status, e.g., ISO 17025.
7.2.3. The project leader calls a meeting with management and QA and makes
a final decision on the priority list.
7.2.4. If the candidate is not an authorized supplier, QA leads the process for
assessment following the order of the priority list as defined in 7.2.3.
Technical competence.
Financial competitiveness.
The company that first meets the assessment criteria will be selected as
subcontractor.
7.2.5. The project leader informs affected parties within the company about the
selection process, the justification and the final decision on the
contractor.
Equipment.
Test procedures.
Regulatory requirements.
Acceptance criteria.
Deliverables.
Price expectations.
7.3.2. The subcontractor evaluates and agrees or disagrees with the proposal.
7.3.3. If necessary, the project leader arranges for a meeting with the
subcontractor representative to agree on open issues including pricing
and timing.
Has the expertise and resources to perform the work in the time
frame.
7.4.1. The project leader arranges for shipment of the test samples or
calibration items.
7.4.2. The subcontractor performs the work and sends the results to the project
leader.
7.4.3. The project leader compares the results and other deliverables with the
description in 7.3.1.