Professional Documents
Culture Documents
Appraisal Form Engineers 3
Appraisal Form Engineers 3
Number: FM2S2-12
Location: At Sea
¨Signing off
Rank: Master
Overall Impression P
CD
FC
S
E
Administration P
CD
FC
S
E
Organisation P
CD
FC
S
E
Communication P
CD
FC
S
E
QHSE awareness P
CD
FC
S
E
English language P
CD
FC
S
E
Stock control P
CD
FC
S
E
Tidiness ER P
CD
FC
S
E
Coding:
Exceptional (E) (clearly outstanding performance). Performance falls within top 5 – 10 % of employees in this
rank/position
Strong (S) (excellent performance). Performance falls within top 15% of the employees in this rank/position.
Fully Competent (FC) (solid performance). Consistently meets job requirements and expectations.
Continued Development (CD) Needs development in current position. Overall performance is somewhat lower than
expected for the current position
Poor (P) (unsatisfactory performance). Performance is clearly below what is expected in current position.
Remarks/Comments Chief Engineer Good Chief Engineer. Recommended for re-employment company fleet vessels
(or Master)
Remarks/Comments Engineer
Signature