Risk Assessment 52North Ship Management B.V. Date: 06 May 2021


Ship Breadbox Viper Location At sea
Assessment team members Chief officer Roman Latsenuk Job Id if apliccable
Risk description situation or task Work on monkey bridge - Risk assesment

Likelihood / Risk Residual Risk


Hazard Consequence Risk Reduction Measures
severity H/M/L H/M/L
Failing seamen from monkey bridge due to rolling or bad fiiling 5 B Medium Instruction before work , used securing belt Low
Damage of eyes 3 B Low Used safety google Low
Damage of hand 3 B Low Use PPE ,keep properly grinder Low

In case residual risk is high, consider alternative ways or methods to perform the task or change the situation and make a separate RA for this. If the residual risk level is still high, this Risk
Assessment must be forwarded to the office for additional evaluation and approval by DPA, Fleet manager or Superintendent before performing the task.

Existing controls Doc Ref / job Id


.Chief Officer especially control this procedure Low
Low
Low
Name team leader Chief officer Roman Latsenuk Signature team leader /