Initial Residual
Task Risk Controls
risk/Impact risk
Consequenc
Consequenc
Risk rating
Risk rating
Likelihood
Likelihood
Si Hazard description
Task step/Activity Who might be harm Control measures
No and effect
1 Erection of Tower crane Fall from heights, Workers 4 3 12 Erection shall be carried out under 4 1 4
Technical failures. competent supervision (Third party).
Physical Injuries/ Foundation of the tower crane shall
Fractures/ Property be designed and prepared as per the
Damage. manufacturer's guidelines.
Area shall be barricaded and only
authorized persons shall be allowed.
Lifting plan shall be followed.
Persons involved in the erection
activity shall be trained and briefed by
the competent supervisor.
All hand tools and power tools shall
be carried out carefully in bags and
secured.
No loose materials shall be kept or left
Page 1 of 6
on the mast section and jibs (At
height).
Electrical cables shall be routed and
tightened carefully.
All bolts shall be checked carefully.
Lifting equipment’s, lifting tackles
shall be third party certified.
Lifting plan shall be followed
2 Ground Clearance Personal injuries and Workers 3 3 9 The ground in the boom radius shall 3 1 3
property damages. be cleared; all activities and
movement in the radius shall be
stopped.
Material shall be cleared from the
area. Adequate area to be identified
to place the dismantled mast sections.
The boom radius area shall be
remarketed & adequately barricaded
with suitable hazards signages.
3 Dismantling of the Tower Unsafe Act/ Collapse of Workers 4 2 8 Adequate capacity crane shall be 4 1 4
crane by using mobile crane. Tower. identified to carry out the dismantling
Injuries/ Fatal/ Property activity under the
Damage. supervision of competent Engineer &
riggers.
The mobile crane operators, riggers,
signal mans shall be third party
certified as per local legal
requirements.
All tools and tackles shall have third
party certification as per local legal
requirements.
Adequate walkie talkies shall be
provided to the supervision team for
clear and uninterrupted
communication.
Nobody shall be allowed in the swing
area of mobile crane and suspended
Page 2 of 6
boom. [restricted to all personnel]
Lifting plan shall be followed.
4 Removal of extended boom Falling objects, personal Workers 4 2 8 Adequate capacity crane shall be 4 1 4
fall, work injury. identified to carry out the dismantling
activity under the
supervision of competent person &
riggers.
The mobile crane operators, riggers,
signal man shall be third party
certified as per local legal
requirements.
All tools and tackles shall have third
party certification as per local legal
requirements.
Adequate walkie talkies shall be
provided to the supervision team for
clear and uninterrupted
communication.
Nobody shall be allowed in the swing
area of mobile crane and suspended
boom.
5 Removal of counter weight, Falling objects, personal Workers 4 2 8 Competent workers shall conduct the 4 1 4
jib, cable drum, cat head, fall, work injury. tower crane dismantling activity.
operator cabin and turning Manufacturer instructions shall be
table. followed.
Full body harness must be used &
100% anchorage shall be followed.
All loose materials and hand tools
shall be tied adequately and kept in
bags.
Adequate walkie talkies
communication arrangements shall be
done.
6 Dismantling of Ties, collars Falling objects, personal Workers 4 2 8 • Competent workers shall conduct the 4 1 4
and remaining mast fall, damage of property activity under close supervision.
sections. • Manufacturer instructions shall be
followed; hand tools shall be used
Page 3 of 6
carefully and secured
• The tie pins shall be removed carefully
and kept in the bags and mobilized
carefully.
• Full body harness must be used &
100% anchorage shall be followed.
• Adequate walkie talkies for
communication shall be arranged.
7 Electrical Safety. Electrocution and fire. Workers 4 2 8 • All electrical supplies and distribution 4 1 4
boards to the tower crane shall be
disconnected before starting the
dismantling activity.
• The activity In-charge shall monitor
the electrical isolation activity with
competent electrical supervisor.
• The power cables shall be withdrawn
before starting the dismantling of the
tower crane.
• Adequate PPEs must be used.
8 Lifting Operations. Fall from the height can Workers 4 2 8 • All documents of TPC and competency 4 1 4
cause injuries to shall be enclosed to the lifting plan.
workers. • Weather conditions shall be taken in
consideration before lifting operation.
• Unauthorized person shall be strictly
prohibited in proximity.
[Restricted area declaration]
9 Manual Handling. Work injuries. Workers 4 2 8 • The tower crane parts shall be 4 1 4
handled with guy ropes to place at the
ground.
• Proper manual Handling procedures
shall be implemented.
• No person shall allow under the
suspended loads.
• Adequate hand protection gloves shall
be used while handling the
equipment’s.
• All tools shall be placed in bags for
Page 4 of 6
handling and shifting.
10 Human concerns and the Loss time. Workers 3 3 9 • All new workers shall be monitored 3 1 3
behavior. under strict supervision.
• Detail task safe execution shall be
carried out by the supervisor and/or
the competent person. Site Tool Box
Talks [TBT] Training shall be carried
out by the assigned H.S.E officer and
the supervisor of the task.
• Horse play and safety violations shall
be treated strictly.
• Adequate water and heat prevention
supplements shall be provided.
• Activity shall be carried out with
reasonable intervals.
PPE’s Requirement
SAFETY REQUIREMENTS
Page 5 of 6
HSE Engineer
APPROVED BY
HSE Manager
Page 6 of 6