Initial Risk Assessme


Type of
No. Activities or Facilities Hazards Dangers and Consequences
Impact Likelihood

Spreader
and rigging
are broken;
lifting arm Potential for injury / fatality to
Lifting work in CPF1 and Personnel,
2 pressure personnel or damage to Vehicles 4
PAD Asset
relief causes and other facilities
lifting
damage;
object blow
15
HSE Risk Assessment Register
(RAM Method)

Initial Risk Assessment Initia Rating of residual risks


l Level of
level Emergency residual
Severity Scores of Personnel Capital Materials Management Scores risks
response
risk

3 12 III 1 1 1 2 2 4 I
Supplementary Prevention and
Existing Prevention and Control Measures
Control Measures

Regularly organize hoisting training, start pre-


class meetings, strengthen on-site safety
inspections, implement strict assessment Arrange appropriate training
system, regular maintenance of cranes and
work tools and self-inspection.