You are on page 1of 1

QHSE Management System Number SMMS8-2

Issue date 07.17


Revision date 06.20
Safety Management Manual
Page 1 of 1

Risk Assessment 52North Ship Management B.V. Date: 05 FEB 2022


Ship Breadbox Viper Location At sea
Assessment team members Chief officer Roman Latsenuk Job Id if apliccable
Risk description situation or task PREPARATION FOR WINTER - Risk assesment

Likelihood / Risk Residual Risk


Hazard Consequence Risk Reduction Measures
severity H/M/L H/M/L
SAFETY INSTRUCTIONS FOR ALL CREW
SLICK DECK 4 B Medium Low
/OVERSTREW DECK SALT OR SAND
MOVING CAREFYLLY ON DECK USE SAFETY SHOES
TRAUMA OF HEAD 5 B Medium Low
AND HELMET,
ICING OF CONSTRUCTION 5 B Medium , REMOVE ICE /AVOID SPRAYING ON HULL Low
USE WARM CLOTHES AND TEMPORALY GET
FREEZING 4 B Meduim Low
WARM IN ACCOMODATION
In case residual risk is high, consider alternative ways or methods to perform the task or change the situation and make a separate RA for this. If the residual risk level is still high, this Risk
Assessment must be forwarded to the office for additional evaluation and approval by DPA, Fleet manager or Superintendent before performing the task.

Existing controls Doc Ref / job Id


PREPARE ALL SHIP’S HEATING EQUIPMENT ON SHIP FOR USE Low
NOT LOCATED ON OPEN DECK UNDER SNOW AND COLD WIND Low
AVOID SOAK THROUTH THE CLOTHES Low
Name team leader Chief officer Roman Latsenuk Signature team leader /

To be stored in Radiantfleet

The lay out of the Risk Assessment form may not be changed without permission of the management

You might also like