You are on page 1of 1

QHSE Management System Number SMMS8-2

Issue date 07.17


Revision date 06.20
Safety Management Manual
Page 1 of 1

Risk Assessment 52North Ship Management B.V. Date: 27 May 2021


Ship Breadbox Viper Location At Anchor p Dakar
Assessment team members Chief officer Roman Latsenuk Job Id if apliccable
Risk description situation or task COVID-19 - Risk assessment

Likelihood / Risk Residual Risk


Hazard Consequence Risk Reduction Measures
severity H/M/L H/M/L
Infection from other people 4 B Medium Iuse face mask Low
Increase distance abt 1,5m. used disinfection
Communicate on closed distance 3 B Low Low
spray
Lo Lo

In case residual risk is high, consider alternative ways or methods to perform the task or change the situation and make a separate RA for this. If the residual risk level is still high, this Risk
Assessment must be forwarded to the office for additional evaluation and approval by DPA, Fleet manager or Superintendent before performing the task.

Existing controls Doc Ref / job Id


.Chief Officer especially control this procedure Low
Low
Low
Name team leader Chief officer Roman Latsenuk Signature team leader /

To be stored in Radiantfleet

The lay out of the Risk Assessment form may not be changed without permission of the management

You might also like