Name of the Job Site: M/s. HIAL, Hyderabad :
Activity/ Facility/ Equipment/ Substance*: Sandwich Busduct with Cu & Alu earthing strip Installation Date;05-07-2019
RefNo; HIRA/A/83 :
HIRA Team members
Prepared by with the involvement
I have read and understood the contents
of ---- (workmen representatives Reviewed by (respective seniors) Approved by (only PD/ PM) Understood and agree to comply
(communicated down the line)
names/ s/c names, etc.,)

Name & role:

Signature

Indicate Critical control points (CCP) for this HIRA:


1
2

Proba
Possible Population Severity Risk Additional Control Anticipated
Sl No Sub activity Hazard Hazardous Event bility Existing Control Measure* Action By
Outcome at risk Rating Level Measures Risk
Rating

1 Refer and implement control measures stated in Risk Assessment Ref # HIRA/A/11
Working in operational area (Air side)

2 MEWP activity Refer and implement control measures stated in Risk Assessment Ref # HIRA

3 Mobile scaffolding activity Refer and implement control measures stated in Risk Assessment Ref # HIRA

op; op;

Er. Er. 1.Delay


1-Provide tire chocker /stopper to prevent unexpected movement of vehicle. start mechanizam to be
1. Run-over-hitting must install
of
1.Transportation hazard. pedestrian/commut Ad. & PPE Ad. & PPE 1-
Mobilization of busduct with Earthing strip
2.Uneven ground. 3. ers. 2.Vehicle Lost time Driver, co- 1. Deploy one person to guide the traffic and driver of the vehicle. flagman deployed 2. Site
4 packages into site and storage in assigned 3 3 9 3
Poor illumination duering night overturning. Accident workers, 2- Identify/demark the parking area where vehicle has to be unloaded. Make sure the drive way is Engineer
location
shift. 4 3.Eye 3- Do not jump off the truck, use the provided “steps” safe and clear for truck to
irritation,Vehicle 4-safety helmet, hi viz jacket,Safety shoes drive through.
collision. 5-arrangement of proper illumination specially on blind spot 3.vehicle drive 10 KM/H
6.Certified driver driven vehicle speed
7.make supply vehicle check list 4.Barricaded area 5.all
vehicle should have DSM
op; op;

Er. Er.
1. 1.tie guide rope for material unloading
1. Contact with 2..hydra/mobile crane placed at level and compacted ground surface
rotating part of 3.area should be barricade
crane. 2. first aid injury
1. Mechanical hazard. Helpers,op Ad. & PPE Ad. & PPE
Uloading of busduct & earth strip by Crane tapling. 3. ,nail injury, Site
5 2.unevent ground surface. erater,co- 4 4 16 1. 1.engage back man/signal man 1.no one should be enterd 8
mobile crane Colapse of crushing,head Engineer
3.Lifting of load. workers 2. input vehicle & crane documents under suspended load
load,failur of tools injury
&tackles. 3. oprator competency
4. use cut resistance hand glouses
5. plan proper storage
6. ensure TPI certicate of all lifeting tools and tackles
7. use proper PPES
8. ensure to under good supervision
op; op;

Er. Er.
1. Puncher due to 1.Remove all nails from packing and bus duct store properly
contact with nails. 2. Store area should be barricaded
Unpacking Bus duct with earthing strip
1. Puncher due to nails 2.Adapting poor falling,tripping Site
6 shifting to the work location as per required workers, 2 2 L Ad. & PPE Ad. & PPE L
2. Ergonomic hazard. postuire/handling of ,unsuffisient Engineer
quantity by manually 1.Use cut resistance glouses and proper ppes 1. Manual handling trainig
excessive loads
3. engaged trained workers should be conducted
repaetedly
4. maintained proper house keeping
5.Deployed medically fit workmen
6.use shoulder pad
op; op;
1. Fall of Er. Er.
person/material. 1.power tools connection go through RCCB 30mA
2. Fall of 2.secuerd loose material
person/material and 3.Use line rope/belt to be secure hand tools
Damaged to
property. Ad. & PPE Ad. & PPE
3. Electric shock 1.ensure scaffolling is safe and inspected 1.Mobile scaffold training
1. Work at hieght. falling,tripping
due to contact with 2.ensure inspection of power tools should be conducted
2. Colapes of scaffold ,unsuffisient,el welder,nea
Fixing MS support to ceiling By live cable. 3.wear nussussary PPE's (full body harness,nose mask ,safety goggles,safety
3. Electrical hazard. ectrocaution, r Site
7 hammaring&welding/Cuting as per 4. Inhalation of dust. 3 4 12 shoes) M
4.Dust/mist. sillica worker,are Engineer
measurements (mobile scaffold) 5. Fire due to 4.Engaged trained and medically fit workmen
5. Fire. inhalation a,cutter,
combuistible 5.no one should be sit on mobile scaffold while moving
6. Rotating part of poer tools. while drilling
material,burn due to
contact with Hot
surface. 6.
Contact with
rotating part of
power tools.

op; op;
Er. Er.
1. Fall of
1.Area should be barricade
person/material.
2. Fall of
Ad. & PPE Ad. & PPE
Installing bus duct with earthing Strip on 1. Work at hieght. person/material and Sever injury/
tecnician 1.Ensure scaffolling is safe and inspected 1.Hieght work training Site
8 support and inter linking by mobile 2. Colapes of scaffold Damaged to fatality due to 4 4 16 M
workers, 2.Display signages should be conducted Engineer
scaffold 3. Electrical hazard. property. 3. fall of person
3. Wear nussussary PPE's (full body harness,reflactive jucket,safety shoeshand ) 2.Brife hazard to workers
Electric shock due
4.Scaffolld shold not be move while worken precence on scaffold 5.
to contact with live
Engaged compatent person
cable.
6.Area must be prohibited

op; op;
1. Fall of
person/material. Er. Er.
2. Fall of 1.install vertical life-line with fall arester
person/material and 2.working shaft above level and below level should be coverd the open.
Damaged to 3.edequet illumination shall be provided shaft appropriately barricaded
property.
3.lectric shock due Ad. & PPE Ad. & PPE
1. Work at hieght. to contact with live 1.provide safe working platform which is fully boarded 1.Display sinages
2. Colapes of scaffold/working cable. 2.worker have breafed about hazard ,unathourized entry
platform 4. Slip&trip/fall of 3.safe access to shaft avaibility prohibited.engeged train
busduct Installation with earthing strip in Sever injury/ welder ,and 4.all personnel are wear proper and required PPE's (full body harness with shouck persons, engaged fire
3. Electrical hazard. person/material due Site
9 open shaft/Ms angles fixing by fatality due to other co- 5 4 20 abserber,cut rasistance hand gloves,reflectiv jucket) watcher M
4. Poor illumination. to poor illumination. Engineer
Wellding/Cuting fall of person worker 5.confined space rules in place
5. Lack of oxygen. 5. Unconsciouness.
6. Fire. 6. Fire due to
7. Rotating part of poer tools. combuistible
material,burn due to
contact with Hot
surface. 7.
Contact with
rotating part of
power tools.
op; op;
1. Fall of Er. Er.
person/material. 2. Make sure all connections are in tight condition
2. Fall of 2.Barricade shaft
person/material and
1. Work at hieght. Ad. & PPE 1.Display sinage
Damaged to physical effect
2. Colapes of scaffold/working , engaged compatent
property. 3. ,hand injury
platform person Site
10 Top up box fixing in open shaft Electric shock due due to sharp tecnician 4 4 H M
3. Electrical hazard. Ad. & PPE Engineer
to contact with live edges of
4. Poor illumination. 1. Ensure to wear proper ppes (shouck resistance hand gloves,full body harness
cable. 4. busduct
5. Lack of oxygen. safety helmate ,safety goggles,reflective jucket) 2.deploy
Slip&trip/fall of
competent person only for testing
person/material due
3.Restrict unauthorised entry only
to poor illumination.
5. Unconsciouness.

op; op;
8

Er. 1.Give proper earthing before charge of LT panel & check same by megger test Er.
device 1.Ensure lock out tag out
Ad. & PPE Ad. & PPE
1. ensure to wear proper ppes (shouck resistance hand gloves,full body harness 1.ensure proper earthing
safety helmate ,safety goggles,reflective jucket) given to Bus duct
2. make sure all connections are in tigLT condition 2.Permit to be obtained
Electric shock due 3.deploy competent person only for testing from L&T.
1.Electric hazard. Severe Site
11 Testing and commisning to contact with electrician 4 5 20 4.restrict unauthorised entry only
injury,Fatal Engineer
electricity. 5. -rabber mat should be provide
6. engaged certisfied electrician for LT panel testing and charging
7. ensure placed of fire extinguisher
8. displayed shouck tritment chart
9. displayed danger sing boards
10. first aid box should be provided
11. barricaed the area and displayed unauthourized entry sing board
12.closed supervision has to be monitored.

op; op;

Er. 1.provide dust binEr.


near work area
1. Tripping due to
Ad. & PPE
debris or Ad. & PPE
co 1.Disposed as per
equipments left 1.Engagged house keeping team saparate Site
12 Housekeeping 1.slip and trips. 2. Ergonomic first aid inuries workers,wo 2 2 4 obligation on monthly base 1
unattended. 2.Enure houskeeing after cpmletion of work Engineer
rkers,staff 2.segregatte waste material
2. Stress due to 3.Arrange/ stage all the material in neat orderly manner.
secure place
untidiness 4. Remove damage, banding, crate material, nails etc. and dispose of properly
3.dont go back to back with
5.maintain proper distance from live bus bar
flying materials
6.all flying material secured in one place
op; op;

Er. 1.provide Er.


1. Injuries, mental dust bin near work area
stress due to Ad. & PPE
Ad. & PPE
tiredness. 1.Disposed as per
First aid Electrician, 1.Engagged house keeping team saparate
13 Working at night poor illumination 2. Trips, falls, 3 3 9 obligation on monthly base Site
Injuries Helper 2.Enure houskeeing after cpmletion of work 6
cuts/punctures due 2.segregatte waste material Engineer
3.Arrange/ stage all the material in neat orderly manner.
to lack of secure place
4.Remove damage, banding, crate material, nails etc. and dispose of properly
illumination. 3.dont go back to back with
5.maintain proper distance from live bus bar
flying materials
6.all flying material secured in one place

HSEO HSEO
* - Strike off what is not relevant

Op: Opportunity for Elimination & Substitution, Er – Engineering Control, Ad & PPE – Administrative control and Personal Protective Equipment

You might also like